Resource Allocation Control Based on Connected Devices

    公开(公告)号:US20190334805A1

    公开(公告)日:2019-10-31

    申请号:US16506660

    申请日:2019-07-09

    Abstract: The present disclosure involves systems and computer implemented methods for implementing a resource allocation and adjusting resource usage and spending based on information received from a plurality of network-connected devices. One example method includes identifying a new connected device replacing an existing device associated with a resource allocation, the resource allocation defining an expected resource usage for a plurality of devices (including the existing device), obtaining historical resource usage information associated with the existing device, identifying the existing device's operational parameters, and determining an expected resource usage for the new connected device after replacement. A change in the expected resource usage in the resource allocation is calculated based on the obtained historical resource usage information associated with the existing device and the expected resource usage amount for the new connected device. The master resource allocation is then updated based on the calculated change.

    Resource allocation control based on connected devices

    公开(公告)号:US10355955B2

    公开(公告)日:2019-07-16

    申请号:US15152286

    申请日:2016-05-11

    Abstract: The present disclosure involves systems and computer implemented methods for implementing a resource allocation and adjusting resource usage and spending based on information received from a plurality of network-connected devices. One example method includes identifying a new connected device replacing an existing device associated with a resource allocation, the resource allocation defining an expected resource usage for a plurality of devices (including the existing device), obtaining historical resource usage information associated with the existing device, identifying the existing device's operational parameters, and determining an expected resource usage for the new connected device after replacement. A change in the expected resource usage in the resource allocation is calculated based on the obtained historical resource usage information associated with the existing device and the expected resource usage amount for the new connected device. The master resource allocation is then updated based on the calculated change.

    BRANCH RECOMMENDATION
    5.
    发明申请

    公开(公告)号:US20190114703A1

    公开(公告)日:2019-04-18

    申请号:US16212808

    申请日:2018-12-07

    Abstract: A method and system for recommending a physical location at which to complete an electronic activity are disclosed. In some examples, initiation of the electronic activity by a user at a first physical location is detected, that the electronic activity is to be completed at a physical location different from the first physical location is determined, one or more portions of the electronic activity that remain incomplete are determined, a second physical location at which to complete the one or more incomplete portions of the electronic activity is identified, and information about the electronic activity is provided to the second physical location. In some examples, the identification of the second physical location is based on at least characteristics of the electronic activity, the user, and/or the second physical location.

    Resource Allocation Control Based on Connected Devices
    7.
    发明申请
    Resource Allocation Control Based on Connected Devices 审中-公开
    基于连接设备的资源分配控制

    公开(公告)号:US20160338072A1

    公开(公告)日:2016-11-17

    申请号:US15152286

    申请日:2016-05-11

    Abstract: The present disclosure involves systems and computer implemented methods for implementing a resource allocation and adjusting resource usage and spending based on information received from a plurality of network-connected devices. One example method includes identifying a new connected device replacing an existing device associated with a resource allocation, the resource allocation defining an expected resource usage for a plurality of devices (including the existing device), obtaining historical resource usage information associated with the existing device, identifying the existing device's operational parameters, and determining an expected resource usage for the new connected device after replacement. A change in the expected resource usage in the resource allocation is calculated based on the obtained historical resource usage information associated with the existing device and the expected resource usage amount for the new connected device. The master resource allocation is then updated based on the calculated change.

    Abstract translation: 本公开涉及用于实现资源分配的系统和计算机实现的方法,并且基于从多个网络连接的设备接收的信息来调整资源使用和支出。 一个示例性方法包括识别替换与资源分配相关联的现有设备的新连接设备,所述资源分配定义多个设备(包括现有设备)的预期资源使用,获得与现有设备相关联的历史资源使用信息, 识别现有设备的操作参数,以及在更换后确定新连接设备的预期资源使用情况。 基于获得的与现有设备相关联的历史资源使用信息和新连接设备的预期资源使用量,计算资源分配中预期资源使用量的变化。 然后根据计算的更改更新主资源分配。

Patent Agency Ranking