SUPPORT STRUCTURE
    91.
    发明申请
    SUPPORT STRUCTURE 审中-公开

    公开(公告)号:US20170231800A1

    公开(公告)日:2017-08-17

    申请号:US15504422

    申请日:2015-08-19

    CPC classification number: A61F5/05866 A61F5/0118 A61F7/00

    Abstract: A support and corresponding system and method of using and producing the support, the support being for supporting a joint or body part of a wearer, the support having at least one rigid first support member, at least one fixing device for attaching the support to the wearer, and at least one second support member extending at an angle from the first support member. Optionally, the joint is a joint between first and second body parts, and the first body part is movable or pivotable relative to the second body part via the joint, and the support is arranged such that at least one of the fixing devices is operable to fix the support to the first body part, the at least one rigid support member covers at least part of at least one side of the first body part and extends over at least part of at least one side of the joint, the second support member is configured to extend to another side of the second body part to the first support member, the first support member is adapted to limit motion of the second body part and/or joint in a first direction, and the second support member is configured to limit motion of the second body part in a second direction.

    ACTIVE NETWORK MANAGEMENT
    93.
    发明申请
    ACTIVE NETWORK MANAGEMENT 有权
    主动网络管理

    公开(公告)号:US20130238159A1

    公开(公告)日:2013-09-12

    申请号:US13866739

    申请日:2013-04-19

    CPC classification number: G06F1/26 H02J3/005 Y02E40/76 Y04S10/545

    Abstract: A method for defining one or more ANM zones in an electricity network that has at least one energy producing/consuming device that has an output that has to be regulated. The method comprises determining the maximum power and/or current transmittable to or from a node or branch in the network at which an energy producing/consuming device that has to be regulated is to be added; determining the maximum capacity of power and/or current transmittable through that node or branch; and defining a zone (zone 1, zone 2) including the node or branch and regulated energy producing/consuming device that requires to be actively managed, in the event that the maximum power and/or current transmittable to the node or branch exceeds the maximum capacity of power and/or current transmittable through it.

    Abstract translation: 一种用于定义电网中的一个或多个ANM区域的方法,其具有至少一个具有必须被调节的输出的能量产生/消耗装置。 该方法包括确定要传送到网络中的节点或分支的最大功率和/或电流,在该网络中要添加必须被调节的能量产生/消耗装置; 确定通过该节点或分支传输的功率和/或电流的最大容量; 并且在发送到节点或分支的最大功率和/或电流超过最大值的情况下,定义包括需要主动管理的节点或分支和受调节的能量产生/消耗设备的区域(区域1,区域2) 功率和/或电流通过它传输的能力。

Patent Agency Ranking