Method for operating a construction site device and construction site device

    公开(公告)号:US11858778B2

    公开(公告)日:2024-01-02

    申请号:US17309322

    申请日:2019-12-13

    Applicant: Inventio AG

    CPC classification number: B66B19/00 B66B1/3492 B66B9/00

    Abstract: A method and construction site device for vertical transportation during a building construction phase include a climbing formwork platform arranged in a currently uppermost region of the building for concreting at least part of the building core, an elevator car intermittently adjusted to a current building height in a first elevator shaft by hoisting a mechanical platform to a higher level and fixing it there, a construction elevator temporarily installed in a second elevator shaft and attached to the climbing formwork platform with a construction elevator car vertically movable in a construction elevator frame, and wherein people and/or material are transported to a floor associated with an access opening of the construction elevator by the elevator system and then are transported from this floor to a floor situated in the currently uppermost region of the building or to the climbing formwork platform by the construction elevator.

    Method for planning and at least partially installing an elevator system in an elevator shaft

    公开(公告)号:US11708244B2

    公开(公告)日:2023-07-25

    申请号:US17250658

    申请日:2019-09-10

    Applicant: Inventio AG

    CPC classification number: B66B19/00 B66B19/002

    Abstract: A method for planning and at least partially installing an elevator system in an elevator shaft includes automated installation steps carried out by an automated mounting device. The method steps include: deriving a target layout of the elevator system from target dimensions of the elevator shaft, establishing the installation steps to be carried out by the automated mounting device, checking that the automated installation steps can be carried out by the mounting device, detecting several actual dimensions of the elevator shaft, deriving an actual layout of the elevator system from the target layout and the detected actual dimensions, planning the automated installation steps based upon the actual layout and carrying out the automated installation steps with the mounting device.

    INSTALLATION DEVICE FOR CARRYING OUT INSTALLATION STEPS ON A WALL AND METHOD FOR EXCHANGING A TOOL OF AN INSTALLATION APPARATUS

    公开(公告)号:US20230094665A1

    公开(公告)日:2023-03-30

    申请号:US17759523

    申请日:2021-02-01

    Applicant: Inventio AG

    Abstract: An installation device for carrying out installation steps on a wall, and a method for exchanging a tool received by the installation apparatus, include an installation apparatus having a drive unit coupled to a tool holder. The tool holder receives a tool that extends away from the tool holder in a tool direction and which tool is driven by the drive unit. The tool holder can assume a locked state and an unlocked state, wherein a tool received by the tool holder can be removed from the tool holder in the unlocked state and is fixed in the tool holder, and therefore cannot be removed, in the locked state. The installation apparatus has an unlocking device controllable by an actuator and the tool holder can be brought from the locked state into the unlocked state by the actuator to release the tool.

    METHOD AND ASSEMBLY DEVICE FOR THE AUTOMATED DETERMINATION OF A DRILLING POSITION OF A DRILL HOLE

    公开(公告)号:US20220009006A1

    公开(公告)日:2022-01-13

    申请号:US17309028

    申请日:2019-11-12

    Applicant: Inventio AG

    Abstract: A method and an assembly device for automated determination of a drilling position of a drill hole for a fastener for fastening a component to a possible wall area of a wall, wherein the method steps include: determining a surface contour of the wall area; examining the surface contour and detecting first irregularities in the surface contour using a first detection rule; determining a primary possible support surface area and a primary possible drilling position area that do not have any of the detected first irregularities; examining the surface contour of the primary possible drilling position area and detecting second irregularities in the surface contour using a second detection rule; and determining the drilling position inside the primary possible drilling position area such that the surface contour at the drilling position does not have any of the detected second irregularities.

    Setting tool and method for percussively driving an anchor rod into a borehole

    公开(公告)号:US12179330B2

    公开(公告)日:2024-12-31

    申请号:US17593699

    申请日:2020-04-01

    Applicant: Inventio AG

    Abstract: A setting tool used in a method for percussively driving an anchor rod into a borehole in a substrate has a drive-side end and, in an opposite tool direction, an end facing away from the drive. The setting tool has a tool adapter that forms the drive-side end and is arranged to interact with a driven impact tool. The end facing away from the drive is formed by a receiving element that has a recess arranged to receive part of an anchor rod. The tool adapter and the receiving element are coupled together by a coupling element such that an impact force introduced via the tool adapter is transmitted to an anchor rod arranged in the recess of the receiving element. The coupling element, in particular a coil spring, is arranged to allow for a displacement of at least part of the receiving element transversely to the tool direction.

    Mounting system for performing an installation operation in an elevator shaft of an elevator system

    公开(公告)号:US11760607B2

    公开(公告)日:2023-09-19

    申请号:US17250711

    申请日:2019-08-09

    Applicant: Inventio AG

    CPC classification number: B66B19/00

    Abstract: A mounting system for performing an installation operation in an elevator shaft of an elevator system has a mounting apparatus that includes a carrier component with a mechatronic installation component, a displacement component, a suspension cable and a deflection roller deflecting the suspension cable between the displacement component and the carrier component. The carrier component is supported against a supporting wall of the elevator shaft by an upper support roller, at least during displacement in the elevator shaft. The suspension cable has, between the deflection roller and the carrier component, a diagonal pull relative to the vertical in the direction of the supporting wall and is guided via the deflection roller such that the diagonal pull can be varied by displacing the deflection roller. The deflection roller is arranged via a holding apparatus on a surface of the supporting wall such that the deflection roller protrudes into the elevator shaft.

    SETTING TOOL AND METHOD FOR PERCUSSIVELY DRIVING AN ANCHOR ROD INTO A BOREHOLE

    公开(公告)号:US20220168880A1

    公开(公告)日:2022-06-02

    申请号:US17593699

    申请日:2020-04-01

    Applicant: Inventio AG

    Abstract: A setting tool used in a method for percussively driving an anchor rod into a borehole in a substrate has a drive-side end and, in an opposite tool direction, an end facing away from the drive. The setting tool has a tool adapter that forms the drive-side end and is arranged to interact with a driven impact tool. The end facing away from the drive is formed by a receiving element that has a recess arranged to receive part of an anchor rod. The tool adapter and the receiving element are coupled together by a coupling element such that an impact force introduced via the tool adapter is transmitted to an anchor rod arranged in the recess of the receiving element. The coupling element, in particular a coil spring, is arranged to allow for a displacement of at least part of the receiving element transversely to the tool direction.

    METHOD FOR OPERATING A CONSTRUCTION SITE DEVICE AND CONSTRUCTION SITE DEVICE

    公开(公告)号:US20220024727A1

    公开(公告)日:2022-01-27

    申请号:US17309322

    申请日:2019-12-13

    Applicant: Inventio AG

    Abstract: A method and construction site device for vertical transportation during a building construction phase include a climbing formwork platform arranged in a currently uppermost region of the building for concreting at least part of the building core, an elevator car intermittently adjusted to a current building height in a first elevator shaft by hoisting a mechanical platform to a higher level and fixing it there, a construction elevator temporarily installed in a second elevator shaft and attached to the climbing formwork platform with a construction elevator car vertically movable in a construction elevator frame, and wherein people and/or material are transported to a floor associated with an access opening of the construction elevator by the elevator system and then are transported from this floor to a floor situated in the currently uppermost region of the building or to the climbing formwork platform by the construction elevator.

Patent Agency Ranking