METHOD FOR CONSTRUCTING AN ELEVATOR, GUIDE RAIL INSTALLATION APPARATUS, GUIDE RAIL INSTALLATION ARRANGEMENT AND METHOD FOR INSTALLING A GUIDE RAIL OF AN ELEVATOR

    公开(公告)号:US20230242379A1

    公开(公告)日:2023-08-03

    申请号:US18299383

    申请日:2023-04-12

    CPC classification number: B66B19/04 B66B19/002 B66B19/005 B66B19/02

    Abstract: The invention relates to a method for constructing an elevator comprising installing comprising installing an elevator car, a counterweight, one or more vertically oriented guide rail lines, a hoisting machine in a first position, and a first hoisting roping for being moved by the hoisting machine, said installing further comprising connecting the first hoisting roping to the elevator car and counterweight; and thereafter transporting passengers and/or goods with the elevator car vertically in the hoistway while the hoisting machine is in said first position; and thereafter stopping said transporting; and thereafter removing said hoisting machine from said first position and the first roping from the hoistway, said removing comprising disconnecting the first hoisting roping from the elevator car and counterweight; wherein the method further comprises installing a hoisting machine in a second position which is higher than the first position, and a second roping for being moved by the hoisting machine, said installing comprising, connecting the second hoisting roping to the elevator car and counterweight; and thereafter transporting passengers and/or goods with the elevator car vertically in the hoistway while the hoisting machine is in said second position, said transporting comprising moving the elevator car with the hoisting machine and the second hoisting roping.

    CONSTRUCTION TIME USE ELEVATOR SHAFT ELEMENT, ELEVATOR ARRANGEMENT AND METHOD

    公开(公告)号:US20230183042A1

    公开(公告)日:2023-06-15

    申请号:US18168053

    申请日:2023-02-13

    Abstract: An elevator shaft element, an elevator arrangement and a method of a construction time use elevator. The elevator shaft element comprises a frame module arranged for receiving an elevator car therein. The frame module is constructed from a transport and/or storage unit, comprising side walls, a bottom wall and a roof wall. The unit is arrangeable vertically such that said side walls, bottom wall and upper wall of the unit define an inner space of the elevator shaft. The side wall, the bottom wall or the upper wall of the transport and/or storage unit is opened at a length more than a floor height of a building for providing an opening for one or more landing doors, the opening having a first side-edge and a second side-edge parallel to longitudinal direction of the transport and/or storage unit. The elevator shaft element further comprises at least one stiffening beam arranged to be fixed to the opening and extending from the first side-edge to the second side-edge.

    ELEVATOR ARRANGEMENT AND METHOD FOR CONSTRUCTING ELEVATOR

    公开(公告)号:US20220297978A1

    公开(公告)日:2022-09-22

    申请号:US17834646

    申请日:2022-06-07

    Abstract: A method for constructing an elevator includes providing a hoisting machine unit, a guide rail line, an elevator car, a counterweight, and a hoisting roping; using the elevator car for transporting passengers and/or goods while the hoisting machine unit is in a first position; installing one or more guide rail sections into the guide rail line above a guide rail section of the hoisting machine unit; removing the hoisting machine unit from the first position; installing a guide rail section into the guide rail line in place from where the guide rail section of the hoisting machine unit was removed; hoisting the hoisting machine unit; mounting the hoisting machine unit to a second position which is higher than the first position; and using the elevator car for transporting passengers and/or goods while the hoisting machine unit is in the second position. An elevator arrangement is described for implementing the method.

    METHOD AND ELEVATOR ARRANGEMENT
    16.
    发明申请

    公开(公告)号:US20220127107A1

    公开(公告)日:2022-04-28

    申请号:US17569053

    申请日:2022-01-05

    Abstract: The invention relates to a method for managing flow of people and goods within a building under construction, comprising providing one or more elevator control systems for automatically controlling movement of elevator cars; providing a first passenger elevator, the first passenger elevator comprising a first passenger elevator car for transporting people, the first passenger elevator car being vertically movable in an elevator hoistway formed inside the building under construction, vertical movement of the car being automatically controlled by an elevator control system, the first passenger elevator car comprising an interior delimited by floor, walls, ceiling and at least one automatic door; and providing a goods elevator, the goods elevator comprising a goods elevator car for transporting goods, the goods elevator car being vertically movable beside the first passenger elevator car in an elevator hoistway formed inside the building under construction, vertical movement of the goods elevator car being automatically controlled by an elevator control system, the goods elevator car comprising at least a transport platform; using the first passenger elevator to transport passengers between floors of the building under construction; and using the goods elevator to transport goods between floors of the building under construction. The invention also relates to an arrangement for managing flow of people and goods within a building under construction, which arrangement implements the method.

    ELEVATOR CONSTRUCTION ARRANGEMENT AND A METHOD

    公开(公告)号:US20240400350A1

    公开(公告)日:2024-12-05

    申请号:US18806894

    申请日:2024-08-16

    Abstract: An elevator construction arrangement comprises: a hoistway having a bottom section, a top section and optionally at least one intermediate section between the bottom and top sections in a building, an elevator car, a counterweight, car guide rails for guiding the car, counterweight guide rails for guiding the counterweight, an elevator hoisting machine and a suspension roping arranged to suspend the car and the counterweight during construction time use of the elevator, at least one protection deck mounted within the hoistway during elevator installation in a section of the hoistway, an installation platform configured to be guided on car guide rails during installation of at least one hoistway section, a hoist device configured to hoist a working platform in the bottom section and configured to hoist the working platform in hoistway sections above the bottom section, the hoist device preferably comprises a man riding hoist attachable to the car or the installation platform, and a hoist rope attachable to the car or the installation platform and movable with the hoist device during the elevator installation, a hoisting point configured to support the working platform via the hoist device and the hoist rope. During the elevator installation in the bottom section the hoisting point is configured to be mounted to a first protection deck, and the working platform guided on the car guide rails is configured to be used as an installation platform, and after each section elevator installation, the car is during construction time use configured to be moved by the elevator hoisting machine suspending the car and the counterweight together with the suspension roping, and during construction time use of the car, the installation platform is configured to be used as installation platform for an above section installation. A method for installing an elevator during construction of a building.

    METHOD OF CONSTRUCTING ELEVATOR AND CONSTRUCTION-TIME ELEVATOR ARRANGEMENT

    公开(公告)号:US20230416055A1

    公开(公告)日:2023-12-28

    申请号:US18464534

    申请日:2023-09-11

    CPC classification number: B66B19/02 B66B19/04

    Abstract: The invention relates to a method of constructing an elevator comprising providing an elevator car in a hoistway, said elevator car comprising a cabin frame, and a temporary pulley beam detachably mounted on the cabin frame; mounting a hoisting machine in a first position which first position is at a first vertical level in the hoistway; suspending (first suspending) the elevator car with a hoisting roping from the hoisting machine via said temporary pulley beam; moving the elevator car in the hoistway with the hoisting machine while it is in said first position and suspended by the roping via said temporary pulley beam; mounting a hoisting machine in a second position which second position is at a second higher vertical level inside a machine room located above the hoistway; removing the temporary pulley beam from the elevator car, comprising detaching the temporary pulley beam from the cabin frame; suspending the car with a hoisting roping from the hoisting machine mounted in said second position via said cabin frame without said temporary pulley beam; moving the elevator car in the hoistway with the hoisting machine while it is in said second position and the car is suspended via said cabin frame without said temporary pulley beam. The invention also relates to an elevator arrangement for implementing the method.