-
公开(公告)号:US20240294361A1
公开(公告)日:2024-09-05
申请号:US18663483
申请日:2024-05-14
Applicant: Kone Corporation
Inventor: Mikko KUKKOLA , Mika IJÄS , Matti RÄSÄNEN , Markku HAAPANIEMI , Otto LANZ , Janne LAINE
CPC classification number: B66B11/0045 , B66B7/02
Abstract: A construction arrangement of an elevator and a method for constructing an elevator. The construction arrangement of an elevator comprises a hoistway; at least one car guide rail and at least one counterweight guide rail mounted to the structure of the hoistway; an elevator car arranged movable on said at least one car guide rail; a counterweight arranged movable on said at least one counterweight guide rail; and a hoisting machine arranged above the counterweight; wherein the hoisting machine is mounted substantially between said at least one car guide rail and said at least one counterweight guide rail. The method for constructing an elevator comprising providing said construction arrangement, moving the hoisting machine from a first installation position to an upper second installation position in the hoistway, and mounting the hoisting machine substantially between said at least one car guide rail and said at least one counterweight guide rail.
-
公开(公告)号:US20250011134A1
公开(公告)日:2025-01-09
申请号:US18891147
申请日:2024-09-20
Applicant: Kone Corporation
Inventor: Mikko KUKKOLA , Mika IJÄS , Anssi VENHO , Matti RÄSÄNEN , Markku HAAPANIEMI
IPC: B66B19/02
Abstract: A method and arrangement for installation of roping of an elevator. The method comprises providing at least one rope, providing an elevator car comprising first and second rope clamps, routing the at least one rope to the elevator car and attaching to the first rope clamp(s), so that there is an extra length of the at least one rope extending past the first rope clamp(s), driving the elevator car to proximity of a motor pulley and installing the extra length on the motor pulley, attaching the extra length to the second rope clamp(s), releasing the at least one rope from the first rope clamp(s), driving the elevator car to a lower part of the elevator shaft, the ropes being attached to the second rope clamp(s), installing a length of the ropes including the extra length on a counterweight pulley, attaching extra length back to the elevator car, installing second end sections of the at least one rope to car pulleys arranged in the elevator car, attaching the second end sections to the elevator car, driving the elevator car to the upper part of the elevator shaft, and fixing the first rope ends and second rope ends to rope fixing(s) arranged in the upper part of the elevator shaft.
-
公开(公告)号:US20240417220A1
公开(公告)日:2024-12-19
申请号:US18817026
申请日:2024-08-27
Applicant: Kone Corporation
Inventor: Mika IJÄS , Matti RÄSÄNEN , Mikko KUKKOLA , Markku HAAPANIEMI , Janne LAINE , Otto LANZ
Abstract: An elevator construction arrangement comprises: a first hoistway in a building, a first elevator car, a first counterweight, car guide rails for guiding the first car, and counterweight guide rails for guiding the first counterweight, a first elevator hoisting machine and a first suspension roping arranged to suspend the first elevator car and the first counterweight during construction time use, a protection deck mounted within the first hoistway during a first elevator installation in a bottom section of the first hoistway, a hoist device for hoisting a working platform, the hoist device preferably comprises a man riding hoist attachable to the first car or to an installation platform, and a hoist rope attachable to the first car or the installation platform and movable with the hoist device, and a first hoisting point configured to support the working platform via the hoist device and the hoist rope. During a first elevator installation in the bottom section of the first hoistway the first hoisting point is configured to be mounted to the protection deck and the working platform guided on the car guide rails is configured to be used as an installation platform in the bottom section of the first hoistway, and after the first elevator installation, the first car is in construction time use configured to be moved in the bottom section of the first hoistway by the first elevator hoisting machine which is installed at a top of the bottom section of the first hoistway and supported by the car guide rail, the first elevator hoisting machine suspending the first car and the first counterweight together with the first suspension roping, while the first hoisting point and the hoist device are removed from the first hoistway. A method for installing an elevator during construction of a building.
-
公开(公告)号:US20240400350A1
公开(公告)日:2024-12-05
申请号:US18806894
申请日:2024-08-16
Applicant: Kone Corporation
Inventor: Mika IJÄS , Matti RÄSÄNEN , Mikko KUKKOLA , Markku HAAPANIEMI , Janne LAINE , Otto LANZ
Abstract: An elevator construction arrangement comprises: a hoistway having a bottom section, a top section and optionally at least one intermediate section between the bottom and top sections in a building, an elevator car, a counterweight, car guide rails for guiding the car, counterweight guide rails for guiding the counterweight, an elevator hoisting machine and a suspension roping arranged to suspend the car and the counterweight during construction time use of the elevator, at least one protection deck mounted within the hoistway during elevator installation in a section of the hoistway, an installation platform configured to be guided on car guide rails during installation of at least one hoistway section, a hoist device configured to hoist a working platform in the bottom section and configured to hoist the working platform in hoistway sections above the bottom section, the hoist device preferably comprises a man riding hoist attachable to the car or the installation platform, and a hoist rope attachable to the car or the installation platform and movable with the hoist device during the elevator installation, a hoisting point configured to support the working platform via the hoist device and the hoist rope. During the elevator installation in the bottom section the hoisting point is configured to be mounted to a first protection deck, and the working platform guided on the car guide rails is configured to be used as an installation platform, and after each section elevator installation, the car is during construction time use configured to be moved by the elevator hoisting machine suspending the car and the counterweight together with the suspension roping, and during construction time use of the car, the installation platform is configured to be used as installation platform for an above section installation. A method for installing an elevator during construction of a building.
-
公开(公告)号:US20230322522A1
公开(公告)日:2023-10-12
申请号:US18329983
申请日:2023-06-06
Applicant: Kone Corporation
Inventor: Markku HAAPANIEMI , Matti RASANEN , Jari RYHANEN , Jaakko KAHILA , Jorma MUSTALAHTI , Otto LANZ , Janne LAINE , Aki HAIKONEN , Anssi VENHO , Mikko KUKKOLA , Wen Sheng LUO , XueSong PAN , Kai GUO
IPC: B66B11/00
CPC classification number: B66B11/0045
Abstract: The invention relates to a construction arrangement of an elevator, comprising a hoistway formed in a building, the hoistway comprising at least one hoistway opening leading in horizontal direction out from the hoistway, the opening being delimited by a lower edge structure and an upper edge structure; and a load in the hoistway lower than said opening; and a hoisting arrangement for hoisting said load, wherein said hoisting arrangement comprises a support structure mounted higher than said load; and a hoisting device; and at least one flexible tension member connected or at least connectable to said load; wherein the at least one flexible tension member is movable with said hoisting device in particular for thereby transmitting a hoisting force to said load to be hoisted. Said support structure comprises an anchoring beam structure comprising a lower end engaging the lower edge structure, and an upper end engaging the upper edge structure; and a support beam structure connected to the anchoring beam structure and protruding from the anchoring beam structure into the hoistway; and wherein said at least one flexible tension member hangs in the hoistway supported by the support beam structure. The invention also relates to a method implementing the construction arrangement.
-
公开(公告)号:US20250033933A1
公开(公告)日:2025-01-30
申请号:US18912018
申请日:2024-10-10
Applicant: Kone Corporation
Inventor: Matti RÄSÄNEN , Otto LANZ , Juha HELENIUS , Markku HAAPANIEMI , Mikko KUKKOLA , Wen Sheng LUO , Kai GUO , XueSong PAN , Zhimin ZHANG , Janne LAINE , Mika IJÄS
Abstract: The invention relates to an elevator with an elevator car moving between landings at different levels in a first section of an elevator shaft. A second section located above the first section, the second section comprising a lifting device mounted under a crash deck and an installation platform which is movably suspended by the lifting device in the second section. At least one crash deck located between the first and the second sections.
-
公开(公告)号:US20240182268A1
公开(公告)日:2024-06-06
申请号:US18434160
申请日:2024-02-06
Applicant: Kone Corporation
Inventor: Otto LANZ , Matti RASANEN , Markku HAAPANIEMI , Anssi VENHO , Janne LAINE , Mika IJAS , Mikko KUKKOLA
CPC classification number: B66B11/0005 , B66B11/0206
Abstract: A construction arrangement of an elevator, comprises a hoistway, a protection deck arranged within the hoistway for protecting the portion of the hoistway below it from falling objects, wherein the protection deck comprises: a frame mounted on stationary structure of the hoistway, a cover co-operating with the frame and extending across the hoistway, wherein the cover is adapted to protect the hoistway from falling objects and/or water from falling into the hoistway below it. The frame is, without dismantling it, configured to be increased and/or decreased in size, individually in at least one direction in relation to the corresponding adjacent stationary structure, such as wall, of the hoistway. A method for constructing an elevator comprises mounting a protection deck within a hoistway.
-
公开(公告)号:US20240017964A1
公开(公告)日:2024-01-18
申请号:US18474045
申请日:2023-09-25
Applicant: Kone Corporation
Inventor: Mika IJAS , Mikko KUKKOLA , Matti RASANEN , Anssi VENHO , Aki HAIKONEN
CPC classification number: B66B9/16 , E04G27/00 , B66B19/04 , B66B19/02 , B66B19/005
Abstract: The arrangement comprises a hoisting machinery, an electric cabinet, and cable drums positioned at the bottom of the shaft, an elevator car and a counterweight moving in the shaft, upper pulleys and rope suspenders fixed at an upper end of the lifting height of the construction elevator, and hoisting ropes being fixed to the rope suspenders during the operation of the construction elevator and gliding through the rope suspenders during an upwards jump of the construction elevator in the shaft. The hoisting ropes pass in a 2:1 roping between the car, the upper pulleys, the traction sheave, the counterweight, and the rope suspenders.
-
公开(公告)号:US20230192447A1
公开(公告)日:2023-06-22
申请号:US18168054
申请日:2023-02-13
Applicant: Kone Corporation
Inventor: Janne LAINE , Matti RASANEN , Markku HAAPANIEMI , Aki HAIKONEN , Otto LANZ , Sakari KORVENRANTA , Anssi VENHO , Jorma MUSTALAHTI , Jaakko KAHILA , Jari RYHANEN , Mika IJAS , Mikko KUKKOLA
IPC: B66B19/00
CPC classification number: B66B19/00
Abstract: The installation platform comprises two decks and a support frame comprising horizontal support beams supporting a respective deck and vertical support beams. The installation platform has a width in a first horizontal direction between the guide rails, a depth in a second horizontal direction perpendicular to the first horizontal direction. The installation platform is guided movably via guide means on the guide rails. At least one of the width and the depth of the installation is adjustable in order to adjust the horizontal dimensions of the installation platform according to the horizontal dimensions of the shaft.
-
-
-
-
-
-
-
-