CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND METHOD FOR CONSTRUCTING AN ELEVATOR

    公开(公告)号:US20240294361A1

    公开(公告)日:2024-09-05

    申请号:US18663483

    申请日:2024-05-14

    CPC classification number: B66B11/0045 B66B7/02

    Abstract: A construction arrangement of an elevator and a method for constructing an elevator. The construction arrangement of an elevator comprises a hoistway; at least one car guide rail and at least one counterweight guide rail mounted to the structure of the hoistway; an elevator car arranged movable on said at least one car guide rail; a counterweight arranged movable on said at least one counterweight guide rail; and a hoisting machine arranged above the counterweight; wherein the hoisting machine is mounted substantially between said at least one car guide rail and said at least one counterweight guide rail. The method for constructing an elevator comprising providing said construction arrangement, moving the hoisting machine from a first installation position to an upper second installation position in the hoistway, and mounting the hoisting machine substantially between said at least one car guide rail and said at least one counterweight guide rail.

    METHOD FOR INSTALLATION OF ROPING OF AN ELEVATOR AND ELEVATOR ARRANGEMENTS

    公开(公告)号:US20250011134A1

    公开(公告)日:2025-01-09

    申请号:US18891147

    申请日:2024-09-20

    Abstract: A method and arrangement for installation of roping of an elevator. The method comprises providing at least one rope, providing an elevator car comprising first and second rope clamps, routing the at least one rope to the elevator car and attaching to the first rope clamp(s), so that there is an extra length of the at least one rope extending past the first rope clamp(s), driving the elevator car to proximity of a motor pulley and installing the extra length on the motor pulley, attaching the extra length to the second rope clamp(s), releasing the at least one rope from the first rope clamp(s), driving the elevator car to a lower part of the elevator shaft, the ropes being attached to the second rope clamp(s), installing a length of the ropes including the extra length on a counterweight pulley, attaching extra length back to the elevator car, installing second end sections of the at least one rope to car pulleys arranged in the elevator car, attaching the second end sections to the elevator car, driving the elevator car to the upper part of the elevator shaft, and fixing the first rope ends and second rope ends to rope fixing(s) arranged in the upper part of the elevator shaft.

    ELEVATOR CONSTRUCTION ARRANGEMENT AND A METHOD

    公开(公告)号:US20240417220A1

    公开(公告)日:2024-12-19

    申请号:US18817026

    申请日:2024-08-27

    Abstract: An elevator construction arrangement comprises: a first hoistway in a building, a first elevator car, a first counterweight, car guide rails for guiding the first car, and counterweight guide rails for guiding the first counterweight, a first elevator hoisting machine and a first suspension roping arranged to suspend the first elevator car and the first counterweight during construction time use, a protection deck mounted within the first hoistway during a first elevator installation in a bottom section of the first hoistway, a hoist device for hoisting a working platform, the hoist device preferably comprises a man riding hoist attachable to the first car or to an installation platform, and a hoist rope attachable to the first car or the installation platform and movable with the hoist device, and a first hoisting point configured to support the working platform via the hoist device and the hoist rope. During a first elevator installation in the bottom section of the first hoistway the first hoisting point is configured to be mounted to the protection deck and the working platform guided on the car guide rails is configured to be used as an installation platform in the bottom section of the first hoistway, and after the first elevator installation, the first car is in construction time use configured to be moved in the bottom section of the first hoistway by the first elevator hoisting machine which is installed at a top of the bottom section of the first hoistway and supported by the car guide rail, the first elevator hoisting machine suspending the first car and the first counterweight together with the first suspension roping, while the first hoisting point and the hoist device are removed from the first hoistway. A method for installing an elevator during construction of a building.

    ELEVATOR CONSTRUCTION ARRANGEMENT AND A METHOD

    公开(公告)号:US20240400350A1

    公开(公告)日:2024-12-05

    申请号:US18806894

    申请日:2024-08-16

    Abstract: An elevator construction arrangement comprises: a hoistway having a bottom section, a top section and optionally at least one intermediate section between the bottom and top sections in a building, an elevator car, a counterweight, car guide rails for guiding the car, counterweight guide rails for guiding the counterweight, an elevator hoisting machine and a suspension roping arranged to suspend the car and the counterweight during construction time use of the elevator, at least one protection deck mounted within the hoistway during elevator installation in a section of the hoistway, an installation platform configured to be guided on car guide rails during installation of at least one hoistway section, a hoist device configured to hoist a working platform in the bottom section and configured to hoist the working platform in hoistway sections above the bottom section, the hoist device preferably comprises a man riding hoist attachable to the car or the installation platform, and a hoist rope attachable to the car or the installation platform and movable with the hoist device during the elevator installation, a hoisting point configured to support the working platform via the hoist device and the hoist rope. During the elevator installation in the bottom section the hoisting point is configured to be mounted to a first protection deck, and the working platform guided on the car guide rails is configured to be used as an installation platform, and after each section elevator installation, the car is during construction time use configured to be moved by the elevator hoisting machine suspending the car and the counterweight together with the suspension roping, and during construction time use of the car, the installation platform is configured to be used as installation platform for an above section installation. A method for installing an elevator during construction of a building.

    CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND METHOD

    公开(公告)号:US20230322522A1

    公开(公告)日:2023-10-12

    申请号:US18329983

    申请日:2023-06-06

    CPC classification number: B66B11/0045

    Abstract: The invention relates to a construction arrangement of an elevator, comprising a hoistway formed in a building, the hoistway comprising at least one hoistway opening leading in horizontal direction out from the hoistway, the opening being delimited by a lower edge structure and an upper edge structure; and a load in the hoistway lower than said opening; and a hoisting arrangement for hoisting said load, wherein said hoisting arrangement comprises a support structure mounted higher than said load; and a hoisting device; and at least one flexible tension member connected or at least connectable to said load; wherein the at least one flexible tension member is movable with said hoisting device in particular for thereby transmitting a hoisting force to said load to be hoisted. Said support structure comprises an anchoring beam structure comprising a lower end engaging the lower edge structure, and an upper end engaging the upper edge structure; and a support beam structure connected to the anchoring beam structure and protruding from the anchoring beam structure into the hoistway; and wherein said at least one flexible tension member hangs in the hoistway supported by the support beam structure. The invention also relates to a method implementing the construction arrangement.

    CONSTRUCTION ARRANGEMENT OF AN ELEVATOR AND A METHOD

    公开(公告)号:US20240182268A1

    公开(公告)日:2024-06-06

    申请号:US18434160

    申请日:2024-02-06

    CPC classification number: B66B11/0005 B66B11/0206

    Abstract: A construction arrangement of an elevator, comprises a hoistway, a protection deck arranged within the hoistway for protecting the portion of the hoistway below it from falling objects, wherein the protection deck comprises: a frame mounted on stationary structure of the hoistway, a cover co-operating with the frame and extending across the hoistway, wherein the cover is adapted to protect the hoistway from falling objects and/or water from falling into the hoistway below it. The frame is, without dismantling it, configured to be increased and/or decreased in size, individually in at least one direction in relation to the corresponding adjacent stationary structure, such as wall, of the hoistway. A method for constructing an elevator comprises mounting a protection deck within a hoistway.