Abstract:
In some embodiments, a method for locally lumped equation of state fluid characterization can include determining a set of components for the material balance calculations for a plurality of grid blocks of a reservoir. The plurality of grid blocks can experience different recovery methods between them. Lumping schemes can be determined for the plurality of grid blocks. Phase behavior calculations can be performed on the plurality of grid blocks, wherein different lumping schemes can be used across the plurality of grid blocks.
Abstract:
In some embodiments, a system, as well as a method and an article, may operate to generate a first matrix, based on equations that model a reservoir, that includes mass conservation and volume balance information for grid blocks in the reservoir; to generate a second matrix, based on the first matrix, that includes saturation information and pressure information of each grid block; to remove the saturation information from the second matrix to generate a third matrix that includes only pressure information; to solve the third matrix to generate a first pressure solution; to solve the second matrix based on the first pressure solution to generate a first saturation solution and a second pressure solution; and to use the first saturation solution and the second pressure solution to generate a solution of the first matrix. Additional apparatus, systems, and methods are disclosed.
Abstract:
In some embodiments, a system, as well as a method and an article, may operate to generate map values for a plurality of parameters corresponding to respective grid blocks of a reservoir, wherein the values have been previously generated based on an initial simulation result from a model of the reservoir; to generate a sector surrogate model that includes a subset of grid blocks of the reservoir based on a criterion for identifying grid blocks that negatively affect simulation of the reservoir; to provide data inputs to execute a simulation of the reservoir using the sector surrogate model; and to generate revised data inputs, based on results of the simulation of the reservoir using the sector surrogate model, to use in a subsequent simulation using the model of the reservoir. Additional apparatus, systems, and methods are disclosed.
Abstract:
In some embodiments, a system, as well as a method and an article, may operate to generate a first matrix, based on equations that model a reservoir, that includes mass conservation and volume balance information for grid blocks in the reservoir; to generate a second matrix, based on the first matrix, that includes saturation information and pressure information of each grid block; to remove the saturation information from the second matrix to generate a third matrix that includes only pressure information; to solve the third matrix to generate a first pressure solution; to solve the second matrix based on the first pressure solution to generate a first saturation solution and a second pressure solution; and to use the first saturation solution and the second pressure solution to generate a solution of the first matrix. Additional apparatus, systems, and methods are disclosed.
Abstract:
A disclosed method for gas lift rate management includes collecting production system data. The method also includes performing a simulation based on the collected data, a fluid model, and a fully-coupled set of equations. The method also includes expediting convergence of a solution for the simulation by selecting well production rates and adjusting gas lift rates. The method also includes storing the gas lift rates determined for the solution for use with gas lift operations of the production system. A disclosed gas lift rate management system includes a memory having a gas lift rate management module and one or more processors coupled to the memory. The gas lift rate management module, when executed, causes the one or more processors to: perform a production system simulation based on a fluid model and a fully-coupled set of equations; expedite convergence of a solution for the production system simulation by selecting well production rates and adjusting gas lift rates; and store the gas lift rates determined for the solution for use with gas lift operations of the production system
Abstract:
Systems and methods for determining operating settings of a fluid production system with a gathering network and a plurality of reservoirs, at least some of which include a method that includes lumping common pseudo-components into reservoir pseudo-components associated with each of the reservoirs. Each common pseudo-component is associated with the gathering network and maps to one reservoir pseudo-component of each of the reservoirs. The method further includes performing at least part of a fully-coupled simulation of the gathering network and the reservoirs using the common pseudo-components to obtain one or more operating settings that meet one or more constraints of the production system, and presenting to a user the operating settings.
Abstract:
A method for determining active constraint equations in a network of wells and surface facilities includes constructing at least one constraint equation for a connection in the network. Each constraint equation includes a respective slack variable and a respective slack variable multiplier. The method further includes constructing a base equation for the connection. The base equation includes the respective slack variable and another respective slack variable multiplier. The method further includes introducing a pseudo slack variable for another connection in the network such that a Schur complement, of a matrix of constraint and base equations dependent only on slack variable multipliers, is sparse. The method further includes solving for each respective slack variable using the Shur complement matrix. The method further includes adjusting a variable parameter of the network using results from solving for each respective slack variable.
Abstract:
Systems and methods for determining operating settings for a fluid production system that includes wells and a processing facility, the method including identifying at least one swing well and one or more non-swing wells and determining at least one target parameter equation that is a function of at least one processing facility constraint and one or more non-swing well parameters. The method further includes incorporating the target parameter equation into a fully-coupled equation set representing the production system, simulating the production system using the fully-coupled equation set to obtain one or more operating settings that meet the processing facility constraint, and presenting to a user the operating settings.