-
公开(公告)号:US20170044935A1
公开(公告)日:2017-02-16
申请号:US15306545
申请日:2015-04-16
Applicant: Siemens Aktiengesellschaft
Inventor: Bernd Leu , Martin Ophey , Klaus Rothe , David Veltmann , Kai Brune , Matthias Heue , Rudolf Pötter , Michael Schütz
IPC: F01K13/02
Abstract: A steam cycle for a power station, and to a method for operating, in particular for starting, a steam cycle. The steam cycle has a high-pressure turbine, a condenser and a steam generator. The steam generator is connected to the high-pressure turbine via a first line. Live steam quick-closing valves and live steam regulating valves for supplying the high-pressure turbine are arranged in the direction of the steam flow between the steam generator and the high-pressure turbine. A starting line is arranged downstream of the high-pressure turbine in the direction of the steam flow, the starting line connecting a waste steam region downstream of the high-pressure turbine with the condenser. At least one regulator regulates a closing of a starting valve for sealing the starting line, and an opening of the live steam valve, depending on the rotational speed, a temperature and load state of the high-pressure turbine.
Abstract translation: 用于电站的蒸汽循环,以及用于操作,特别是用于启动蒸汽循环的方法。 蒸汽循环具有高压涡轮机,冷凝器和蒸汽发生器。 蒸汽发生器通过第一线连接到高压涡轮。 用于供给高压汽轮机的活蒸汽快关阀和活蒸汽调节阀沿蒸汽发生器和高压汽轮机之间的蒸汽流动方向排列。 在高压涡轮机的下游,在蒸汽流的方向上设置起始线,起始线将高压涡轮机下游的废蒸汽区域与冷凝器连接。 至少一个调节器根据转速,高压汽轮机的温度和负载状态来调节用于密封起动线的起动阀的关闭和活蒸汽阀的打开。
-
公开(公告)号:US20210285333A1
公开(公告)日:2021-09-16
申请号:US16621174
申请日:2018-04-20
Applicant: Siemens Aktiengesellschaft
Inventor: Henning Almstedt , Ralf Bell , Ulrich Beul , Kai Brune , Robin Burzan , Matthias Heue , Benedikt Hofmeister , Mario Koebe , Michael Löhr , Stefan Riemann , Andreas Schaarschmidt , Andreas Ulma , Sebastian Zahn , Gerta Zimmer
Abstract: A method for checking a steam turbine, wherein a first operating variable and a second operating variable are determined, wherein a correlation between the first and second operating variable prevails, and a confidence band having an upper maximum value and a lower minimum value is created, wherein a notification is generated as long as the second operating variable is outside the confidence band during operation.
-
公开(公告)号:US10167742B2
公开(公告)日:2019-01-01
申请号:US15306545
申请日:2015-04-16
Applicant: Siemens Aktiengesellschaft
Inventor: Bernd Leu , Martin Ophey , Klaus Rothe , David Veltmann , Kai Brune , Matthias Heue , Rudolf Pötter , Michael Schütz
Abstract: A steam cycle for a power station, and to a method for operating, in particular for starting, a steam cycle. The steam cycle has a high-pressure turbine, a condenser and a steam generator. The steam generator is connected to the high-pressure turbine via a first line. Live steam quick-closing valves and live steam regulating valves for supplying the high-pressure turbine are arranged in the direction of the steam flow between the steam generator and the high-pressure turbine. A starting line is arranged downstream of the high-pressure turbine in the direction of the steam flow, the starting line connecting a waste steam region downstream of the high-pressure turbine with the condenser. At least one regulator regulates a closing of a starting valve for sealing the starting line, and an opening of the live steam valve, depending on the rotational speed, a temperature and load state of the high-pressure turbine.
-
公开(公告)号:US20170241285A1
公开(公告)日:2017-08-24
申请号:US15519704
申请日:2015-10-05
Applicant: Siemens Aktiengesellschaft
Inventor: Martin Bennauer , Matthias Heue , Martin Ophey , Christoph Schindler
CPC classification number: F01D19/02 , F01D5/06 , F01D5/12 , F01D21/003 , F01D25/24 , F01K13/02 , F05D2270/053 , F05D2270/3032
Abstract: A turbine control unit and method for controlling a turbine, in particular for controlling the start-up of a turbine, the unit being designed as a cascade controller having a master controller and an inner controller, the master controller being a thermal stress controller for the components subjected to thermal stress.
-
公开(公告)号:US20170237263A1
公开(公告)日:2017-08-17
申请号:US15519168
申请日:2015-10-05
Applicant: Siemens Aktiengesellschaft
Inventor: Matthias Heue , Gerta Zimmer
Abstract: A method and associated control device for synchronizing a turbine with an alternating current network having a network frequency, having the following steps: A) accelerating the turbine up to a frequency in the range of the network frequency; B) sensing an angle difference between the turbine and the alternating current network; C) sensing a speed difference between the turbine and the alternating current network; D) accelerating or decelerating the turbine such that the turbine follows a desired trajectory, wherein the desired trajectory is a trajectory calculated in advance that indicates, in dependence on the angle difference, a desired speed difference that should be present such that a target angular position between the turbine and the alternating current network suitable for synchronous feed-in is achieved when the speed of the turbine and the speed of the alternating current network correspond.
-
公开(公告)号:US20160146060A1
公开(公告)日:2016-05-26
申请号:US14905412
申请日:2014-07-03
Applicant: SIEMENS AKTIENGESELLSCHAFT
Inventor: Edwin Gobrecht , Matthias Heue
CPC classification number: F01K23/101 , F01K7/24 , F01K13/02 , F22B1/1815 , Y02E20/16
Abstract: A method for operating a combined cycle power plant, according to which shortly before the planned start-up of a parked load, the steam turbine is lowered to a very low output, the gas turbine is then operated in parked load, and next the steam turbine is powered up to a parked output. The GT operating power can be the rated power of the gas turbine. The ST operating power can be the rated power of the steam turbine.
Abstract translation: 一种用于操作联合循环发电厂的方法,根据该方法,在暂停的负载的计划启动之前不久,蒸汽轮机降低到非常低的输出,然后燃气轮机在停放的负载下运行,接下来是蒸汽 涡轮机供电到停放的输出。 GT运行功率可以是燃气轮机的额定功率。 ST工作功率可以是蒸汽轮机的额定功率。
-
17.
公开(公告)号:US20140150431A1
公开(公告)日:2014-06-05
申请号:US14176419
申请日:2014-02-10
Applicant: SIEMENS AKTIENGESELLSCHAFT
Inventor: Stefan Glos , Matthias Heue , Ernst-Wilhelm Pfitzinger , Norbert Pieper
IPC: F01K13/02
CPC classification number: F01K13/02 , F01D5/28 , F01D25/12 , F01D25/14 , F01D25/26 , F01K7/16 , F01K13/006 , F01K13/025 , F05D2220/31 , F05D2260/232
Abstract: A steam power plant includes a multi-stage steam turbine including a rotor and a flow duct formed from a plurality of stages, a boiler, and a first cooling medium supply. The first cooling medium supply opens out into the flow duct of the steam turbine downstream of an intermediate stage. The rotor comprises a first component and a second component. The second component is arranged downstream of the first component as viewed in the flow direction. The intermediate stage is arranged downstream of the first component.
Abstract translation: 蒸汽发电厂包括多级蒸汽轮机,其包括转子和由多级构成的流动管道,锅炉和第一冷却介质供应源。 第一冷却介质供应通向中间阶段下游的蒸汽轮机的流动管道。 转子包括第一部件和第二部件。 当从流动方向观察时,第二部件布置在第一部件的下游。 中间级布置在第一部件的下游。
-
-
-
-
-
-