Methods and systems for improved quench tower design

    公开(公告)号:US11746296B2

    公开(公告)日:2023-09-05

    申请号:US17155818

    申请日:2021-01-22

    CPC classification number: C10B39/08 C10B41/00 C10B39/00 C10B39/04

    Abstract: The present technology describes methods and systems for an improved quench tower. Some embodiments improve the quench towers ability to recover particulate matter, steam, and emissions that escape from the base of the quench tower. Some embodiments improve the draft and draft distribution of the quench tower. Some embodiments include one or more sheds to enlarge the physical or effective perimeter of the quench tower to reduce the amount of particulate matter, emissions, and steam loss during the quenching process. Some embodiments include an improved quench baffle formed of a plurality of single-turn or multi-turn chevrons adapted to prevent particulate matter from escaping the quench tower. Some embodiments include an improved quench baffle spray nozzle used to wet the baffles, suppress dust, and/or clean baffles. Some embodiments include a quench nozzle that can fire in discrete stages during the quenching process.

    COKE PLANT TUNNEL REPAIR AND ANCHOR DISTRIBUTION

    公开(公告)号:US20220325183A1

    公开(公告)日:2022-10-13

    申请号:US17532058

    申请日:2021-11-22

    Abstract: A coke plant includes multiple coke ovens where each coke oven is adapted to produce exhaust gases, a common tunnel fluidly connected to the plurality of coke ovens and configured to receive the exhaust gases from each of the coke ovens, multiple standard heat recovery steam generators fluidly connected to the common tunnel where the ratio of coke ovens to standard heat recovery steam generators is at least 20:1, and a redundant heat recovery steam generator fluidly connected to the common tunnel where any one of the plurality of standard heat recovery steam generators and the redundant heat recovery steam generator is adapted to receive the exhaust gases from the plurality of ovens and extract heat from the exhaust gases and where the standard heat recovery steam generators and the redundant heat recovery steam generator are all connected in parallel with each other.

Patent Agency Ranking