摘要:
A method, system and apparatus associated with the production of hydrocarbons are described. The system includes a wellbore that accesses a subsurface reservoir; a production tubing string disposed within the wellbore; and one or more sand control devices coupled to the production tubing string and disposed within the wellbore. At least one of the sand control devices includes a first tubular member having a permeable section and a non permeable section; a second tubular member disposed within the first tubular member. The second tubular member has a plurality of openings and an inflow control device that each provide a flow path to the interior of the second tubular member. Also, the at least one of the sand control devices includes a sealing mechanism disposed between the first tubular member and the second tubular member. The sealing mechanism is configured to provide a pressure loss during gravel packing operations that is less than the pressure loss during at least some of the production operations.
摘要:
Method and apparatus for producing hydrocarbons including a wellbore that accesses a subsurface reservoir; a production tubing string disposed within the wellbore; and sand control devices coupled to the production tubing string. At least one of the sand control devices includes a first tubular member having a permeable section and a non permeable section; a second tubular member disposed within the first tubular member. The second tubular member has a plurality of openings and an inflow control device that provides a flow path to the interior. The sand control devices include a sealing mechanism disposed between the first tubular member and the second tubular member to provide pressure loss during gravel packing operations that is less than the pressure loss during production operations.
摘要:
A method for completing a wellbore in a subsurface formation includes providing a sand screen assembly representing one or more joints of sand screen, joint assembly, and packer assembly. The packer assembly has at least one mechanically-set packer with at least one alternate flow channel. The sand screen assembly and joint assembly also each have transport conduits for carrying gravel slurry, and packing conduits for delivering gravel slurry. The method also includes running the sand screen assembly, connected joint assembly and packer assembly into the wellbore, and setting a sealing element of the packer assembly into engagement with the surrounding wellbore. Thereafter, the method includes injecting gravel slurry into the wellbore to form a gravel pack such that a reserve of gravel packing material is placed above the sand screen assembly. A wellbore completion apparatus is also provided that allows for placement of the gravel reserve.
摘要:
A sand control device for restricting flow of particles from a subsurface formation into a tubular body within a wellbore, the device being divided into compartments along its length, each compartment comprises a base pipe. The base pipe defines an elongated tubular body having a permeable section and an impermeable section within each compartment, also comprising a first filtering conduit and a second filtering conduit. The filtering conduits are arranged so that the first filtering conduit is adjacent to the non-permeable section of the base pipe, while the second filtering conduit is adjacent to the permeable section of the base pipe.
摘要:
A method, system and apparatus associated with the production of hydrocarbons are described. The system includes a wellbore that accesses a subsurface reservoir; a production tubing string disposed within the wellbore; and one or more sand control devices coupled to the production tubing string and disposed within the wellbore. At least one of the sand control devices includes a first tubular member having a permeable section and a non permeable section; a second tubular member disposed within the first tubular member. The second tubular member has a plurality of openings and an inflow control device that each provide a flow path to the interior of the second tubular member. Also, the at least one of the sand control devices includes a sealing mechanism disposed between the first tubular member and the second tubular member. The sealing mechanism is configured to provide a pressure loss during gravel packing operations that is less than the pressure loss during at least some of the production operations.
摘要:
Systems and methods for providing zonal isolation in a hydrocarbon well include or utilize a tubular assembly having an upstream manifold, a gravel packing conduit, a transport conduit, a leak-off conduit, and a downstream flow path. The tubular assembly is adapted to receive a gravel-laden slurry and to direct at least a portion of the same to the gravel packing conduit. The gravel-laden slurry exiting the gravel packing conduit packs the annulus between the tubular assembly and the wellbore by dehydrating at least in part through the leak-off conduit. The leak-off conduit is further gravel-packed by the gravel-laden slurry received by the tubular assembly. The leak-off conduit is dehydrated through a flow control valve. Together, the gravel packed annulus and the gravel packed leak-off conduit provide a gravel-based zonal isolation system.
摘要:
Systems and methods for providing zonal isolation in a hydrocarbon well include or utilize a tubular assembly having an upstream manifold, a gravel packing conduit, a transport conduit, a leak-off conduit, and a downstream flow path. The tubular assembly is adapted to receive a gravel-laden slurry and to direct at least a portion of the same to the gravel packing conduit. The gravel-laden slurry exiting the gravel packing conduit packs the annulus between the tubular assembly and the wellbore by dehydrating at least in part through the leak-off conduit. The leak-off conduit is further gravel-packed by the gravel-laden slurry received by the tubular assembly. The leak-off conduit is dehydrated through a flow control valve. Together, the gravel packed annulus and the gravel packed leak-off conduit provide a gravel-based zonal isolation system.
摘要:
A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
摘要:
A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.
摘要:
A method associated with the production of hydrocarbons is described. The method includes drilling a wellbore using a drilling fluid, conditioning the drilling fluid, running a production string in the wellbore and gravel packing an interval of the wellbore with a carrier fluid. The production string includes a joint assembly comprising a main body portion having primary and secondary fluid flow paths, wherein the main body portion is attached to a load sleeve assembly at one end and a torque sleeve assembly at the opposite end, the load sleeve assembly having at least one transport conduit and at least one packing conduit disposed therethrough. The main body portion may include a sand control device, a packer, or other well tool for use in a downhole environment. The joint assembly also includes a coupling assembly having a manifold region in fluid flow communication with the second fluid flow path of the main body portion and facilitating the make-up of first and second joint assemblies with a single connection.