Traffic load management method, network and device
    1.
    发明授权
    Traffic load management method, network and device 有权
    流量负载管理方法,网络和设备

    公开(公告)号:US09307449B2

    公开(公告)日:2016-04-05

    申请号:US13702001

    申请日:2011-06-09

    Applicant: Adrian Duda

    Inventor: Adrian Duda

    Abstract: A radiocommunication network includes a core network including primary and secondary nodes and a radio access network including radio controllers. Each primary node connects at least one secondary node, and each secondary node connects at least one radio controller via respective links. In relation to a given primary node, at least one entity in the radiocommunication network calculates respective target load reduction values for the links connecting the given primary node and secondary nodes, depending on an excess value between a current load of the given primary node and a primary node load threshold, and calculates respective target load reduction values for the links connecting said secondary nodes connected to the given primary node and radio controllers, depending on calculated target load reduction values. Actions are taken for changing traffic distribution by taking account of calculated target load reduction values.

    Abstract translation: 无线电通信网络包括包括主节点和次节点的核心网络和包括无线电控制器的无线电接入网络。 每个主节点连接至少一个辅助节点,并且每个次节点通过相应链路连接至少一个无线电控制器。 关于给定的主节点,无线电通信网络中的至少一个实体根据给定主节点和当前节点的当前负载之间的过量值来计算连接给定主节点和次节点的链路的相应目标负载减少值 主节点负载阈值,并且根据计算的目标负载减小值,计算连接到给定主节点和无线电控制器的所述辅助节点的链路的相应目标负载减小值。 通过考虑计算的目标负荷减少值来采取措施来改变流量分配。

    METHOD AND SYSTEM FOR SPEED ESTIMATION IN A NETWORK
    2.
    发明申请
    METHOD AND SYSTEM FOR SPEED ESTIMATION IN A NETWORK 审中-公开
    网络速度估计方法与系统

    公开(公告)号:US20070207807A1

    公开(公告)日:2007-09-06

    申请号:US11680636

    申请日:2007-03-01

    Applicant: Adrian Duda

    Inventor: Adrian Duda

    CPC classification number: G01S11/06 H04W28/26 H04W64/006 H04W84/12

    Abstract: Estimating the speed of a mobile user terminal within a wireless environment and estimating the time when a mobile user terminal would reach a coverage border of the access point it is currently associated with. In particular, the present system is concerned with calculating a time (T) the terminal would take to move from a point A, after it has stopped making received signal level measurements, to another point B, at the coverage border of the access point, independently of any medium-specific parameters. This way, the present system enhances Quality of Service by properly estimating the speed and time and enabling a terminal, or an entity in the network, to take preemptive actions to ensure optimal QoS.

    Abstract translation: 估计移动用户终端在无线环境中的速度,并估计移动用户终端到达当前与其相关联的接入点的覆盖边界的时间。 特别地,本系统涉及在接入点的覆盖边界上计算终端在停止进行接收信号电平测量之后从A点移动到另一个点B的时间(T) 独立于任何中等特定参数。 这样,本系统通过适当地估计速度和时间,使得终端或网络中的实体能够采取抢先行动来确保最优QoS,从而提高服务质量。

    TRAFFIC LOAD MANAGEMENT METHOD, NETWORK AND DEVICE
    3.
    发明申请
    TRAFFIC LOAD MANAGEMENT METHOD, NETWORK AND DEVICE 有权
    交通负担管理方法,网络和设备

    公开(公告)号:US20130079011A1

    公开(公告)日:2013-03-28

    申请号:US13702001

    申请日:2011-06-09

    Applicant: Adrian Duda

    Inventor: Adrian Duda

    Abstract: A radiocommunication network includes a core network including primary and secondary nodes and a radio access network including radio controllers. Each primary node connects at least one secondary node, and each secondary node connects at least one radio controller via respective links. In relation to a given primary node, at least one entity in the radiocommunication network calculates respective target load reduction values for the links connecting the given primary node and secondary nodes, depending on an excess value between a current load of the given primary node and a primary node load threshold, and calculates respective target load reduction values for the links connecting said secondary nodes connected to the given primary node and radio controllers, depending on calculated target load reduction values. Actions are taken for changing traffic distribution by taking account of calculated target load reduction values.

    Abstract translation: 无线电通信网络包括包括主节点和次节点的核心网络和包括无线电控制器的无线电接入网络。 每个主节点连接至少一个辅助节点,并且每个次节点通过相应链路连接至少一个无线电控制器。 关于给定的主节点,无线电通信网络中的至少一个实体根据给定主节点和当前节点的当前负载之间的过量值来计算连接给定主节点和次节点的链路的相应目标负载减少值 主节点负载阈值,并且根据计算的目标负载减小值,计算连接到给定主节点和无线电控制器的所述辅助节点的链路的相应目标负载减小值。 通过考虑计算的目标负荷减少值来采取措施来改变流量分配。

Patent Agency Ranking