-
公开(公告)号:US4375439A
公开(公告)日:1983-03-01
申请号:US281346
申请日:1981-07-08
IPC分类号: B01D47/10
CPC分类号: B01D47/10 , Y10S261/54 , Y10S261/56
摘要: An annular gap washer for scrubbing a gas stream with a liquid, especially for the scrubbing of blast furnace gases with water such that the adjustment of the width of the annular gap controls the pressure at the head of the blast furnace, comprises the usual housing or duct with a tapering configuration and a body axially movable in this duct and with a tapering configuration so that the annular gap is formed between this body and the duct wall. According to the invention, the base angles of the body and the duct walls are different such that the gap converges in the direction of flow of the gases, thereby reducing vibrations or oscillation of the body without interfering with scrubbing efficiency.
摘要翻译: 用于用液体洗涤气流的环形间隙洗涤器,特别是用于用水擦洗高炉气体,使得环形间隙的宽度的调节控制高炉头部的压力包括通常的外壳或 具有锥形构造的管道和在该管道中可轴向移动并且具有锥形构造的主体,使得环形间隙形成在该主体和管道壁之间。 根据本发明,主体和管道壁的底角不同,使得间隙在气体流动方向上收敛,从而减少了主体的振动或振荡,而不会干扰洗涤效率。
-
公开(公告)号:US4052042A
公开(公告)日:1977-10-04
申请号:US688893
申请日:1976-05-21
IPC分类号: B01D47/10 , B01D50/00 , B61B11/00 , B65H75/44 , C21B20060101 , C21B7/00 , C21B7/22 , F02C1/00 , F02C6/00 , F16D65/14 , F27D17/00
CPC分类号: B01D47/10 , B01D50/00 , C21B7/007 , C21B7/22 , Y10S261/54 , Y10S261/56
摘要: An apparatus for cleaning the exhaust gas of a high-pressure blast furnace comprises a coarse-particle separator, a prewasher and a differential-pressure annular gap washer traversed in succession by the gases. The exhaust gases can be passed through a main duct provided with an expansion turbine or through a bypass duct around the expansion turbine. The expansion turbine unit controls the back pressure at the blast furnace while a separate control circuit is provided to operate the differential-pressure washer with optimum efficiency. A quick-closing valve in the turbine-supply line and a quick-opening valve in the bypass line permits rapid switchover, a pressure-control valve in the bypass line maintains a constant backpressure at the blast furnace when the expansion turbine unit is shut down.
-