Provided is a method for determining a recovery schedule. The method includes accepting as input a recovery graph. The recovery graph presents one or more strategies for data recovery. In addition, at least one objective is provided and accepted. The recovery graph is formalized as an optimization problem for the provided objective. When formalized as an optimization problem, at least one solution technique is applied to determine at least one recovery schedule.
摘要:
A method and system of workforce related resource planning is disclosed. The method includes receiving workforce related resource data wherein the workforce related resource data includes demand data and supply data, disaggregating the demand data and the supply data and creating a probability distribution of a workforce gap between the demand data and supply data to quantify risk associated with workforce related resource planning.
摘要:
A computer-based solver provides a method of assigning computing resources in a data center to meet computing resource requirements of an application. The solver initially creates a list of application components wherein each application component represents a largest possible combination of shared resource requirements from the application. Next, the solver identifies a set of eligible resource servers with each resource server capable of fulfilling the resource requirements for each application component in the list of application components. Typically, the resource requirements of either the shared or discrete are met by a resource server with sufficient capacity. If there is at least one feasible solution, the solver then matches an optimal combination of resource servers to each application component in the list of application components using a genetic algorithm (GA). The GA rapidly evaluates the solutions to find an optimal solution that tends to have lesser overall costs compared to other solutions identified.
摘要:
In at least some embodiments, a method comprises computing an initial schedule of jobs to be run on a computing system using a mathematical program and monitoring the computing system. The method also comprises, based on the monitoring, determining, using the mathematical program used to compute the initial schedule, whether the initial schedule should be re-computed.
摘要:
An embodiment of a method of designing a storage system begins with a step of assigning decision variables to a range of candidate storage systems. Each of the decision variables identifies a single candidate storage system. The method concludes with a step of employing the decision variables in a mathematical program to determine which of the candidate storage systems meets availability and reliability criteria and incurs a near minimal projected cost.
摘要:
A method is disclosed for evaluating the performance of a website. An agent interacts with the website using a behavior model of an exemplary website customer. The agent interacts with the website according to the behavior model and gathers website performance data related to the interaction. The performance data is compared to a utility function for the behavior model. A rating is assigned to the website based on the comparison, and the rating is made available to potential website customers seeking information related to the website's performance.
摘要:
Provided is a method for determining a recovery schedule. The method includes accepting as input a recovery graph. The recovery graph presents one or more strategies for data recovery. In addition, at least one objective is provided and accepted. The recovery graph is formalized as an optimization problem for the provided objective. When formalized as an optimization problem, at least one solution technique is applied to determine at least one recovery schedule.
摘要:
Embodiments of the present invention relate to a system and method for allocating resources to applications. One embodiment of the present invention may include identifying a plurality of applications and a plurality of application components, and determining available resources of a networked computing system for potentially storing the applications and application components. Additionally, the embodiment may include determining required resources for each application component, assigning a subset of available resources for each application component based on the required resources of the application component and the available resources. The embodiment may also include associating the application components with the subsets of available resources and storing more than one application component of the plurality of application components on a single available resource.
摘要:
A configuration method includes selecting a design configuration, and modeling the solution configuration having a failure event for the selected solution configuration to determine an amount of down time associated with the failure event. A first penalty cost function is applied the amount of down time to determine a first penalty cost associated with the failure event of the selected solution configuration.
摘要:
A computer-implemented method for automatic contract monitoring. An electronic version of a contract comprising at least one term and at least one penalty is received. Information relevant to enforcement of contract is monitored. A transaction related to the contract is received. Using the information, it is automatically determined whether the transaction is compliant with the contract.