-
公开(公告)号:US20140288720A1
公开(公告)日:2014-09-25
申请号:US14181568
申请日:2014-02-14
申请人: Douglas Ian Stewart
发明人: Douglas Ian Stewart
IPC分类号: H02J3/14
CPC分类号: H02J3/14 , G06Q50/06 , H02J3/382 , H02J2003/146 , Y02E40/60
摘要: A network-based energy management system may identify an area that exhibits a need for electrical energy. The network-based energy management system may also identify an area that exhibits an ability to provide electrical energy. The network-based energy management system may cause electrical energy to be routed from the second area to the first area. In some embodiments, the first area and the second area may include base stations that are electrically connected to one another by one or more energy conduits, which may include superconducting wires so as to minimize transmission losses between base stations and their respective areas.
摘要翻译: 基于网络的能量管理系统可以识别出需要电能的区域。 基于网络的能量管理系统还可以识别具有提供电能的能力的区域。 基于网络的能量管理系统可以使电能从第二区域路由到第一区域。 在一些实施例中,第一区域和第二区域可以包括通过一个或多个能量管道彼此电连接的基站,其可以包括超导线材,以便使基站及其相应区域之间的传输损耗最小化。
-
公开(公告)号:US08655496B1
公开(公告)日:2014-02-18
申请号:US13800673
申请日:2013-03-13
申请人: Douglas Ian Stewart
发明人: Douglas Ian Stewart
IPC分类号: G05B11/12
CPC分类号: H02J3/14 , G06Q50/06 , H02J3/382 , H02J2003/146 , Y02E40/60
摘要: A network-based energy management system may identify an area that exhibits a need for electrical energy. The network-based energy management system may also identify an area that exhibits an ability to provide electrical energy. The network-based energy management system may cause electrical energy to be routed from the second area to the first area. In some embodiments, the first area and the second area may include base stations that are electrically connected to one another by one or more energy conduits, which may include superconducting wires so as to minimize transmission losses between base stations and their respective areas.
摘要翻译: 基于网络的能量管理系统可以识别出需要电能的区域。 基于网络的能量管理系统还可以识别具有提供电能的能力的区域。 基于网络的能量管理系统可以使电能从第二区域路由到第一区域。 在一些实施例中,第一区域和第二区域可以包括通过一个或多个能量管道彼此电连接的基站,其可以包括超导线材,以便使基站及其相应区域之间的传输损耗最小化。
-