摘要:
Provided are an apparatus and method for adapting an input/output interface. According to the exemplary method, a host system adapts an input/output interface of the guest system to an input/output unit capability of a host system so as to support a service supported by an input/output unit supporting the input/output unit capability of the guest system using the at least one input/output unit of the host system.
摘要:
Provided are an apparatus and method for adapting an input/output interface. According to the exemplary method, a host system adapts an input/output interface of the guest system a to an input/output unit capability of a host system so as to support a service supported by an input/output unit supporting the input/output unit capability of the guest system using the at least one input/output unit of the host system.
摘要:
The invention provides a method and system for continuous optimization of a data center. The method includes monitoring loads of storage modules, server modules and switch modules in the data center, detecting an overload condition upon a load exceeding a load threshold, combining server and storage virtualization to address storage overloads by planning allocation migration between the storage modules, to address server overloads by planning allocation migration between the server modules, to address switch overloads by planning allocation migration mix between server modules and storage modules for overload reduction, and orchestrating the planned allocation migration to reduce the overload condition in the data center.
摘要:
Provided are an apparatus and method for adapting an input/output interface. According to the exemplary method, a host system adapts an input/output interface of the guest system to an input/output unit capability of a host system so as to support a service supported by an input/output unit supporting the input/output unit capability of the guest system using the at least one input/output unit of the host system.
摘要:
The invention provides a method and system for continuous optimization of a data center. The method includes monitoring loads of storage modules, server modules and switch modules in the data center, detecting an overload condition upon a load exceeding a load threshold, combining server and storage virtualization to address storage overloads by planning allocation migration between the storage modules, to address server overloads by planning allocation migration between the server modules, to address switch overloads by planning allocation migration mix between server modules and storage modules for overload reduction, and orchestrating the planned allocation migration to reduce the overload condition in the data center.