Framing structure
    1.
    发明授权
    Framing structure 有权
    框架结构

    公开(公告)号:US08800229B2

    公开(公告)日:2014-08-12

    申请号:US12665958

    申请日:2008-06-20

    摘要: A framing structure (10) includes elements that are integrally connected by a poured bonding core (18). The elements include a hollow-interior column (12) having an opening (22) in a wall (20) that allows access to the interior and a beam (14) having a cavity (28) that is configured to receive a pourable bonding material (18). The beam (14) is positioned with respect to the column (12) such that the cavity (28) is aligned with the opening (22). Flooring sections (16) are supported by the beams (14).

    摘要翻译: 框架结构(10)包括通过浇注的粘合芯(18)整体连接的元件。 这些元件包括中空的内部柱(12),其具有允许进入内部的壁(20)中的开口(22),以及具有空腔(28)的梁(14),该空腔(28)构造成接收可倾倒的接合材料 (18)。 梁(14)相对于柱(12)定位,使得空腔(28)与开口(22)对准。 地板部分(16)由梁(14)支撑。

    Building Structures and Construction Methods
    2.
    发明申请
    Building Structures and Construction Methods 有权
    建筑结构与施工方法

    公开(公告)号:US20120317919A1

    公开(公告)日:2012-12-20

    申请号:US13508126

    申请日:2010-11-08

    IPC分类号: E04B1/19 E04B1/38

    摘要: A system including a column (12), a first connecting element (30) extending from the column (12), a beam (14), and a second connecting element (70). The beam includes a base wall (42) at least partially defining a cavity (40) and a cutout (48) in the base wall (42) that is configured to receive the column (12) and that is configured with respect to the first connecting element (30). The second connecting element (70) is disposed in the cavity (40), and the first and second connecting elements (30, 70) are configured to connect the beam (14) to the column (12).

    摘要翻译: 一种包括柱(12),从柱(12)延伸的第一连接元件(30),梁(14)和第二连接元件(70)的系统。 梁包括至少部分地限定空腔(40)的底壁(42)和基壁(42)中的切口(48),所述切口(48)被构造成接收柱(12),并且相对于第一 连接元件(30)。 第二连接元件(70)设置在空腔(40)中,并且第一和第二连接元件(30,70)构造成将梁(14)连接到柱(12)。

    Building Structure
    3.
    发明申请
    Building Structure 有权
    建筑结构

    公开(公告)号:US20160130798A1

    公开(公告)日:2016-05-12

    申请号:US13383015

    申请日:2010-07-08

    申请人: Housh Rahimzadeh

    发明人: Housh Rahimzadeh

    IPC分类号: E04B1/41 E04B5/02 E04B1/24

    摘要: A building structure (10) includes elements that are integrally connected by a poured bonding structure (18). The elements include a beam (14) having a cavity (28) that is configured to receive a pourable bonding material (18) and flooring sections (16) that are supported by the beams (14). The flooring sections (16) include voids (60) that open to a cavity (28). Inserts (62) are positioned in the voids (60) to control the limit the depth that the pourable bonding material (18) can flow into the voids (60) and to increase the strength of the poured bonding structure (18).

    摘要翻译: 建筑结构(10)包括通过浇注的结合结构(18)整体连接的元件。 这些元件包括具有空腔(28)的梁(14),其被构造成接收由​​梁(14)支撑的可倾倒接合材料(18)和地板部分(16)。 地板部分(16)包括通向空腔(28)的空隙(60)。 插入物(62)位于空隙(60)中,以控制可倾倒粘合材料(18)能够流入空隙(60)的深度的极限,并且增加浇注粘结结构(18)的强度。

    Building Structure Including Balcony
    4.
    发明申请
    Building Structure Including Balcony 有权
    建筑结构包括阳台

    公开(公告)号:US20150292193A1

    公开(公告)日:2015-10-15

    申请号:US13383031

    申请日:2010-07-08

    申请人: Housh Rahimzadeh

    发明人: Housh Rahimzadeh

    IPC分类号: E04B1/19 E04B1/30 E04C3/36

    摘要: A building structure (10) with a balcony includes a beam (14) with an upward facing cavity (28). The beam (14) includes an opening (36) in which a cantilevered section (18) is received. The cantilevered section (18) has a proximal end (38) that is positioned in the cavity (28) and a poured bonding structure (20) fills the cavity (28).

    摘要翻译: 具有阳台的建筑结构(10)包括具有朝上的空腔(28)的梁(14)。 梁(14)包括其中容纳有悬臂部分(18)的开口(36)。 悬臂部分(18)具有位于空腔(28)中的近端(38),并且浇注的结合结构(20)填充空腔(28)。

    Building structures and construction methods
    7.
    发明授权
    Building structures and construction methods 有权
    建筑结构和施工方法

    公开(公告)号:US08898992B2

    公开(公告)日:2014-12-02

    申请号:US13508126

    申请日:2010-11-08

    摘要: A system including a column (12), a first connecting element (30) extending from the column (12), a beam (14), and a second connecting element (70). The beam includes a base wall (42) at least partially defining a cavity (40) and a cutout (48) in the base wall (42) that is configured to receive the column (12) and that is configured with respect to the first connecting element (30). The second connecting element (70) is disposed in the cavity (40), and the first and second connecting elements (30, 70) are configured to connect the beam (14) to the column (12).

    摘要翻译: 一种包括柱(12),从柱(12)延伸的第一连接元件(30),梁(14)和第二连接元件(70)的系统。 梁包括至少部分地限定空腔(40)的底壁(42)和基壁(42)中的切口(48),所述切口(48)被构造成接收柱(12),并且相对于第一 连接元件(30)。 第二连接元件(70)设置在空腔(40)中,并且第一和第二连接元件(30,70)构造成将梁(14)连接到柱(12)。

    FRAMING STRUCTURE
    8.
    发明申请
    FRAMING STRUCTURE 有权
    框架结构

    公开(公告)号:US20110088348A1

    公开(公告)日:2011-04-21

    申请号:US12665958

    申请日:2008-06-20

    IPC分类号: E04H12/00

    摘要: A framing structure (10) includes elements that are integrally connected by a poured bonding core (18). The elements include a hollow-interior column (12) having an opening (22) in a wall (20) that allows access to the interior and a beam (14) having a cavity (28) that is configured to receive a pourable bonding material (18). The beam (14) is positioned with respect to the column (12) such that the cavity (28) is aligned with the opening (22). Flooring sections (16) are supported by the beams (14).

    摘要翻译: 框架结构(10)包括通过浇注的粘合芯(18)整体连接的元件。 这些元件包括中空的内部柱(12),其具有允许进入内部的壁(20)中的开口(22),以及具有空腔(28)的梁(14),该空腔(28)构造成接收可倾倒的接合材料 (18)。 梁(14)相对于柱(12)定位,使得空腔(28)与开口(22)对准。 地板部分(16)由梁(14)支撑。

    Composite structural framing system

    公开(公告)号:US06543195B2

    公开(公告)日:2003-04-08

    申请号:US10012974

    申请日:2001-12-07

    申请人: Housh Rahimzadeh

    发明人: Housh Rahimzadeh

    IPC分类号: E04C300

    摘要: The structural framing system comprises a steel beam that supports flooring components interconnected through the addition of a solidifying material such as poured concrete. A structural framing system is created by anchoring steel beams to vertical columns, spanning floor sections between the steel beams, pouring concrete into the interior of the beams and contacting the flooring components, and then forming a rigid joint between the steel beam, floor sections and columns through the addition of a bonding layer.