Abstract:
A method for implementing soft constraints in scheduling comprises receiving a description of circuit behavior. The description is un-timed. A scheduling solution is generated for use in scheduling the description. The scheduling solution includes scheduling variables and an objective function. The scheduling variables schedule the time of at least one operation. The objective function includes a penalty term and constraints comprising at least one hard constraint and at least one soft constraint. The constraints are created on the scheduling variables. The penalty term comprises a slack variable representing violations of the constraints. The penalty term measures the design cost of violating the soft constraint. Following generation of the scheduling solution, the description is scheduled by applying the scheduling solution to the description. Timing information of the description is provided as an output of the scheduling.
Abstract:
An on-chip Radio Frequency (RF) Interconnect (RF-I) for communication between internal circuit nodes of an integrated circuit is provided. In one embodiment, an integrated circuit is provided that includes an on-chip transmission line, a first circuit node associated with an RF transmitter connected to the transmission line, and a second circuit node associated with an RF receiver connected to the transmission line. In order to transmit data from the first circuit node to the second circuit node, the RF transmitter associated with the first circuit node modulates the data onto an RF carrier frequency to provide a modulated RF signal and transmits the modulated RF signal over the transmission line. The RF receiver associated with the second circuit node receives the modulated RF signal from the transmission line and demodulates the modulated RF signal to recover the data for the second circuit node.
Abstract:
A method for implementing soft constraints in scheduling comprises receiving a description of circuit behavior. The description is un-timed. A scheduling solution is generated for use in scheduling the description. The scheduling solution includes scheduling variables and an objective function. The scheduling variables schedule the time of at least one operation. The objective function includes a penalty term and constraints comprising at least one hard constraint and at least one soft constraint. The constraints are created on the scheduling variables. The penalty term comprises a slack variable representing violations of the constraints. The penalty term measures the design cost of violating the soft constraint. Following generation of the scheduling solution, the description is scheduled by applying the scheduling solution to the description. Timing information of the description is provided as an output of the scheduling.
Abstract:
A method and apparatus for identifying potential noise failures in an integrated circuit design is described. In one embodiment, the method comprises locating a victim net and an aggressor within the integrated circuit design, modeling the victim net using two π-type resistor-capacitor (RC) circuits, including determining a coupling between the victim net and the aggressor, and indicating that the integrated circuit design requires modification if modeling the victim net indicates that a potential noise failure may occur in the integrated circuit design.