Device and method for controlling the state of an energy accumulator
    1.
    发明授权
    Device and method for controlling the state of an energy accumulator 有权
    用于控制蓄能器状态的装置和方法

    公开(公告)号:US07430492B2

    公开(公告)日:2008-09-30

    申请号:US11491772

    申请日:2006-07-24

    IPC分类号: G06F15/00 G01L19/00

    CPC分类号: F15B1/024 F15B19/00

    摘要: The invention concerns a device and method for checking the state of an accumulator with energy reserve that is connected to a fluid system. According to the invention, the fluid system is first of all pressurized and this fluid is maintained at an operating pressure PF for at least a time τ so as to ensure the stabilization of this fluid system. Then the pressurisation of the fluid system is stopped and the time Δt taken by the system to pass from a predetermined pressure P1 to a predetermined pressure P2, with P2

    摘要翻译: 本发明涉及一种用于通过连接到流体系统的能量储备来检查蓄能器的状态的装置和方法。 根据本发明,流体系统首先被加压,并将该流体保持在操作压力P 1至少一个时间τ,以确保该流体系统的稳定性。 然后停止流体系统的加压,并且系统采取的时间Deltat从预定压力P 1> 1传递到预定压力P 2> 2,其中P 2

    。 该期间将Deltat与预定的参考时间T ref进行比较。

    Device and method for controlling the state of an energy accumulator
    3.
    发明申请
    Device and method for controlling the state of an energy accumulator 有权
    用于控制蓄能器状态的装置和方法

    公开(公告)号:US20070118325A1

    公开(公告)日:2007-05-24

    申请号:US11491772

    申请日:2006-07-24

    IPC分类号: G01L19/00

    CPC分类号: F15B1/024 F15B19/00

    摘要: The invention concerns a device and method for checking the state of an accumulator with energy reserve that is connected to a fluid system. According to the invention, the fluid system is first of all pressurized and this fluid is maintained at an operating pressure PF for at least a time τ so as to ensure the stabilization of this fluid system. Then the pressurisation of the fluid system is stopped and the time Δt taken by the system to pass from a predetermined pressure P1 to a predetermined pressure P2, with P2

    摘要翻译: 本发明涉及一种用于通过连接到流体系统的能量储备来检查蓄能器的状态的装置和方法。 根据本发明,流体系统首先被加压,并将该流体保持在操作压力P 1至少一个时间τ,以确保该流体系统的稳定性。 然后停止流体系统的加压,并且系统采取的时间Deltat从预定压力P 1> 1传递到预定压力P 2> 2,其中P 2

    。 该期间将Deltat与预定的参考时间T ref进行比较。