Nuclear power plant and operation method thereof
    2.
    发明申请
    Nuclear power plant and operation method thereof 有权
    核电厂及其运行方法

    公开(公告)号:US20050220253A1

    公开(公告)日:2005-10-06

    申请号:US11033953

    申请日:2005-01-13

    IPC分类号: G21C1/08 G21C19/00 G21D3/00

    摘要: A nuclear power plant of the invention is equipped, for example, with a reactor; a steam loop comprising high and low pressure turbines; a condenser for condensing steam discharged therefrom the low pressure turbine; a feedwater heater for heating feedwater supplied from the condenser; and a feedwater loop for leading feedwater discharged from the feedwater heater to the reactor, and an operation method thereof is characterized by augmenting a second reactor thermal power output in a second operation cycle of the reactor larger than a first reactor thermal power output in a first operation cycle; and making an increase ratio of extraction steam, which is led to the feedwater heater with being extracted from the steam loop, in the second operation cycle for the first operation cycle smaller than an increase ratio of the second reactor thermal power output for the first reactor thermal power output.

    摘要翻译: 本发明的核电站例如配备有反应器; 包括高压和低压涡轮机的蒸汽回路; 用于冷凝从其排出的蒸汽的冷凝器; 用于加热从冷凝器供给的给水的给水加热器; 以及用于从给水加热器排放到反应器的引导给水的给水回路及其操作方法的特征在于,在反应器的第二操作循环中增加第二反应堆热功率输出,其大于第一反应堆热功率输出 操作周期; 并且在第一操作循环的第二操作循环中,使第一反应器的第二反应堆热功率输出的增加比率小于从蒸汽回路引出的给水加热器的提取比例增加 火力输出。