公开(公告)号:US07245975B2
公开(公告)日:2007-07-17
申请号:US11110475
申请日:2005-04-20
申请人: Marghub Mirza
发明人: Marghub Mirza
CPC分类号: G05B19/4141 , G05B2219/33337 , G05B2219/33338 , G05B2219/34006 , G05B2219/42186 , G05B2219/45238
摘要: A system and method for generating master and slave reference signals is disclosed, wherein at least one axis of the plurality of axes is a master section and at least one axis of the plurality of axes is a slave section, said slave section being a slave of said master section. The system and method generates a first reference signal and a second reference signal, wherein the second reference signal lags the first reference signal by a first delay period, and the processor provides the first reference signal to the slave section and the second reference signal to the master section. As a result, the slave section can lead the master section.
摘要翻译: 公开了一种用于产生主参考信号和从属参考信号的系统和方法,其中多个轴的至少一个轴是主部分,并且多个轴的至少一个轴是从部分,所述从部分是 说主人部分。 该系统和方法产生第一参考信号和第二参考信号,其中第二参考信号滞后于第一参考信号第一延迟周期,并且处理器将第一参考信号提供给从部分,第二参考信号提供给第二参考信号 主节。 因此,从属部分可以引导主部分。
-
公开(公告)号:US20060241789A1
公开(公告)日:2006-10-26
申请号:US11110475
申请日:2005-04-20
申请人: Marghub Mirza
发明人: Marghub Mirza
IPC分类号: G05B19/18
CPC分类号: G05B19/4141 , G05B2219/33337 , G05B2219/33338 , G05B2219/34006 , G05B2219/42186 , G05B2219/45238
摘要: A system and method for generating master and slave reference signals is disclosed, wherein at least one axis of the plurality of axes is a master section and at least one axis of the plurality of axes is a slave section, said slave section being a slave of said master section. The system and method generates a first reference signal and a second reference signal, wherein the second reference signal lags the first reference signal by a first delay period, and the processor provides the first reference signal to the slave section and the second reference signal to the master section. As a result, the slave section can lead the master section.
摘要翻译: 公开了一种用于产生主参考信号和从属参考信号的系统和方法,其中多个轴的至少一个轴是主部分,并且多个轴的至少一个轴是从部分,所述从部分是 说主人部分。 该系统和方法产生第一参考信号和第二参考信号,其中第二参考信号滞后于第一参考信号第一延迟周期,并且处理器将第一参考信号提供给从部分,第二参考信号提供给第二参考信号 主节。 因此,从属部分可以引导主部分。
-