Abstract:
Embodiments relate to a method and apparatus for investigating the uniformity of concrete and/or grout. Embodiments can identify the existence of one or more anomalies in the uniformity of concrete and/or grout, and/or determine or estimate the size, shape, type, and/or location of one or more anomalies in the uniformity of concrete and/or grout. Embodiments can utilize a string of temperature measuring sensors placed within one or more access bore(s), such as tube(s), positioned at least partially within the concrete and/or positioned proximate the concrete. The measurements obtained from the temperature measuring sensors can then be used to assist in the identification of existence of, size of, type of, shape of, and/or location of anomalies in the concrete and/or grout.
Abstract:
The present application relates to a method of installing a pre-cast pile in the ground which involves applying an enlarged head forming tool to the ground until a volume of soil has been displaced or removed so as to form a void at the surface of the ground. The pre-cast pile is then driven into the ground to a predetermined depth below the void and the void is then filled with concrete or grout to form a cast-in-situ pile head. The diameter of the pile head is greater than the diameter of the pile shaft.
Abstract:
The present application relates to a tool having a cutting apparatus for enlarging a portion of an underground pile shaft. The tool is provided with a collecting device which is disposed below the cutting means in order that spoil generated when performing a cutting action on ground material surrounding the pile shaft can be collected. The size of the collecting device is adjustable thereby allowing the volume of spoil which may be accommodated by the collecting means to be varied. A compacting mechanism for compressing the spoil collected in the collecting device may also be provided for reducing the volume of the spoil.
Abstract:
There is disclosed a method of continuous flight auger piling and a continuous flight auger rig (1), wherein an auger (2) is applied to the ground so as to undergo a first, penetration phase and a second, withdrawal phase, and wherein the rotational speed of and/or the rate of penetration of and/or the torque applied to the auger (2) during the first, penetration phase are determined and controlled as a function of the ground conditions and the auger geometry by means of an electronic computer (8) so as to tend to keep the auger flights loaded (11) with soil originating from the region of the tip of the auger (2). During the withdrawal phase, concrete (14) may be supplied to the tip (12) of the auger (2) by way of flow control and measuring means (6, 7), the rate of withdrawal of the auger (2) being controlled as a function of the flow rate of the concrete (14), or vice versa, by means of an electronic computer (8) so as to ensure that sufficient concrete (14) is supplied to keep at least the tip (12) of the auger (2) immersed in concrete (14) during withdrawal.