-
公开(公告)号:USRE41723E1
公开(公告)日:2010-09-21
申请号:US11364794
申请日:2006-02-28
申请人: Lloyd Olson , Nicolaos Papadopoulos
发明人: Lloyd Olson , Nicolaos Papadopoulos
IPC分类号: B01F3/04
CPC分类号: F28F25/082 , F28F2275/085 , Y10S261/11
摘要: A cooling tower support grid includes a lattice frame having a first series of bars which intersect a second series of bars to form a plurality of openings. Splash bar retaining clips are integrally formed as part of the lattice frame extending in opposed relation into each of the openings. This eliminates the need to handle separate retaining clips and, thereby, simplifies the installation process.
摘要翻译: 冷却塔支撑格栅包括具有与第二系列条相交以形成多个开口的第一系列条的网格框架。 飞溅杆保持夹整体地形成为以相对关系延伸到每个开口中的格架的一部分。 这消除了处理单独的固定夹的需要,从而简化了安装过程。
-
公开(公告)号:US06708960B2
公开(公告)日:2004-03-23
申请号:US09902090
申请日:2001-07-10
申请人: Lloyd Olson , Nicolaos Papadopoulos
发明人: Lloyd Olson , Nicolaos Papadopoulos
IPC分类号: B01F304
CPC分类号: F28F25/082 , F28F2275/085 , Y10S261/11
摘要: A cooling tower support grid includes a lattice frame having a first series of bars which intersect a second series of bars to form a plurality of openings. Splash bar retaining clips are integrally formed as part of the lattice frame extending in opposed relation into each of the openings. This eliminates the need to handle separate retaining clips and, thereby, simplifies the installation process.
摘要翻译: 冷却塔支撑格栅包括具有与第二系列条相交以形成多个开口的第一系列条的网格框架。 飞溅杆保持夹整体地形成为以相对关系延伸到每个开口中的格架的一部分。 这消除了处理单独的固定夹的需要,从而简化了安装过程。
-
公开(公告)号:US06877727B2
公开(公告)日:2005-04-12
申请号:US10705568
申请日:2003-11-07
申请人: Lloyd Olson , Nicolaos Papadopoulos
发明人: Lloyd Olson , Nicolaos Papadopoulos
CPC分类号: F28F25/082 , F28F2275/085 , Y10S261/11
摘要: A cooling tower support grid includes a lattice frame having a first series of bars which intersect a second series of bars to form a plurality of openings. Splash bar retaining clips are integrally formed as part of the lattice frame extending in opposed relation into each of the openings. This eliminates the need to handle separate retaining clips and, thereby, simplifies the installation process.
摘要翻译: 冷却塔支撑格栅包括具有与第二系列条相交以形成多个开口的第一系列条的网格框架。 飞溅杆保持夹整体地形成为以相对关系延伸到每个开口中的格架的一部分。 这消除了处理单独的固定夹的需要,从而简化了安装过程。
-
-