ARRANGEMENT AND A METHOD FOR PARALLEL TRANSPORT AND INSTALLATION OF ELEVATOR COMPONENTS
    1.
    发明申请
    ARRANGEMENT AND A METHOD FOR PARALLEL TRANSPORT AND INSTALLATION OF ELEVATOR COMPONENTS 有权
    安排和并行运输和安装电梯组件的方法

    公开(公告)号:US20160332845A1

    公开(公告)日:2016-11-17

    申请号:US15140667

    申请日:2016-04-28

    IPC分类号: B66B19/00 E04G3/24 E04G3/28

    摘要: A material transport and installation arrangement comprising a first working platform system in an elevator shaft for reaching a first installation height; and a first material hoisting system for moving elevator components vertically in the elevator shaft is disclosed. The arrangement is characterized in that it comprises a second working platform system in the elevator shaft for reaching a second installation height, the second working platform system comprising a second platform hoist, second platform roping and a vertically moveable second working platform, the second working platform being below the first working platform; and a second material hoisting system for moving elevator components vertically in the elevator shaft, the second material hoisting system comprising a second material hoist, second material roping and a second material holder. Further, a method for parallel transport and installation of elevator components is disclosed.

    摘要翻译: 一种材料输送和安装装置,其包括用于达到第一安装高度的电梯井中的第一工作平台系统; 并且公开了用于在电梯井中垂直移动电梯部件的第一材料提升系统。 该装置的特征在于它包括一个用于达到第二安装高度的电梯井中的第二工作平台系统,第二工作平台系统包括第二平台升降机,第二平台绳索和可垂直移动的第二工作平台,第二工作平台 在第一个工作平台下面; 以及用于在电梯井道中垂直移动电梯部件的第二材料提升系统,第二材料提升系统包括第二材料提升机,第二材料卷绕机和第二材料架。 此外,公开了一种并行运输和安装电梯部件的方法。

    ELEVATOR SYSTEM
    2.
    发明申请
    ELEVATOR SYSTEM 有权
    电梯系统

    公开(公告)号:US20160083224A1

    公开(公告)日:2016-03-24

    申请号:US14954148

    申请日:2015-11-30

    IPC分类号: B66B9/00 B66B7/06

    摘要: The invention relates to an elevator system comprising a first elevator car, a second elevator car, a rotatable rope wheel mounted on a fixed location, and a roping suspending the first and second elevator car on opposite sides of the rope wheel, the roping comprising at least one rope passing over the rope wheel, and connected on the first side of the rope wheel to the first elevator car and on the second side to the second elevator car. Said rope comprises at least one load bearing member oriented parallel with the longitudinal direction of the rope made of composite material comprising reinforcing fibers embedded in polymer matrix, which reinforcing fibers are carbon fibers oriented parallel with the longitudinal direction of the rope.

    摘要翻译: 本发明涉及一种电梯系统,包括第一电梯轿厢,第二电梯轿厢,安装在固定位置的可旋转绳轮,以及将第一和第二电梯轿厢悬挂在绳轮的相对侧上的绳索,绳索包括在 至少一根绳索穿过绳轮,并且在绳轮的第一侧连接到第一电梯轿厢,第二侧连接到第二电梯轿厢。 所述绳索包括至少一个承载构件,其平行于由复合材料制成的绳索的纵向方向定向,该承载构件包括嵌入聚合物基质中的增强纤维,该增强纤维是与绳索的纵向平行定向的碳纤维。

    Arrangement and a method for parallel transport and installation of elevator components

    公开(公告)号:US09890019B2

    公开(公告)日:2018-02-13

    申请号:US15140667

    申请日:2016-04-28

    IPC分类号: B66B19/00 E04G3/28 E04G3/24

    摘要: A material transport and installation arrangement comprising a first working platform system in an elevator shaft for reaching a first installation height; and a first material hoisting system for moving elevator components vertically in the elevator shaft is disclosed. The arrangement is characterized in that it comprises a second working platform system in the elevator shaft for reaching a second installation height, the second working platform system comprising a second platform hoist, second platform roping and a vertically moveable second working platform, the second working platform being below the first working platform; and a second material hoisting system for moving elevator components vertically in the elevator shaft, the second material hoisting system comprising a second material hoist, second material roping and a second material holder. Further, a method for parallel transport and installation of elevator components is disclosed.