System and Method for Second Order Multi-Layer Traffic Grooming for Optical Network Optimization
    1.
    发明申请
    System and Method for Second Order Multi-Layer Traffic Grooming for Optical Network Optimization 有权
    用于光网络优化的二阶多层流量整理系统与方法

    公开(公告)号:US20130129352A1

    公开(公告)日:2013-05-23

    申请号:US13744615

    申请日:2013-01-18

    Abstract: A method includes forming a set of direct connections (including a high-speed connection and a low-speed connection) between an origination central office (OCO) and a destination central office (DCO). The method includes forming a spoke connection between the OCO and a hub node and forming a connection between the hub node and the DCO. The spoke connection is formed to carry first residual demand traffic from the OCO to the hub node. The connection is formed to carry the first residual demand traffic and second residual demand traffic (received at the hub node from other OCOs) from the hub node to the DCO. The method includes determining a first estimated cost (of forming the set of direct connections) and a second estimated cost (of forming the spoke connection and the connection). The method includes determining whether the first estimated cost exceeds the second estimated cost.

    Abstract translation: 一种方法包括在起始中心局(OCO)和目的地中心局(DCO)之间形成一组直接连接(包括高速连接和低速连接)。 该方法包括在OCO和集线器节点之间形成辐条连接并形成集线器节点和DCO之间的连接。 辐条连接形成为承载从OCO到集线器节点的第一残余需求业务。 连接被形成为携带从集线器节点到DCO的第一剩余需求业务和第二剩余需求业务(在中枢节点处从其他OCO接收)。 该方法包括确定第一估计成本(形成直接连接集合)和第二估计成本(形成辐条连接和连接)。 该方法包括确定第一估计成本是否超过第二估计成本。

    System and method for second order multi-layer traffic grooming for optical network optimization
    2.
    发明授权
    System and method for second order multi-layer traffic grooming for optical network optimization 有权
    用于光网络优化的二阶多层流量梳理的系统和方法

    公开(公告)号:US08660010B2

    公开(公告)日:2014-02-25

    申请号:US13744615

    申请日:2013-01-18

    Abstract: A method includes forming a set of direct connections (including a high-speed connection and a low-speed connection) between an origination central office (OCO) and a destination central office (DCO). The method includes forming a spoke connection between the OCO and a hub node and forming a connection between the hub node and the DCO. The spoke connection is formed to carry first residual demand traffic from the OCO to the hub node. The connection is formed to carry the first residual demand traffic and second residual demand traffic (received at the hub node from other OCOs) from the hub node to the DCO. The method includes determining a first estimated cost (of forming the set of direct connections) and a second estimated cost (of forming the spoke connection and the connection). The method includes determining whether the first estimated cost exceeds the second estimated cost.

    Abstract translation: 一种方法包括在起始中心局(OCO)和目的地中心局(DCO)之间形成一组直接连接(包括高速连接和低速连接)。 该方法包括在OCO和集线器节点之间形成辐条连接并形成集线器节点和DCO之间的连接。 辐条连接形成为承载从OCO到集线器节点的第一残余需求业务。 连接被形成为携带从集线器节点到DCO的第一剩余需求业务和第二剩余需求业务(在中枢节点处从其他OCO接收)。 该方法包括确定第一估计成本(形成直接连接集合)和第二估计成本(形成辐条连接和连接)。 该方法包括确定第一估计成本是否超过第二估计成本。