Abstract:
A method includes forming a set of direct connections (including a high-speed connection and a low-speed connection) between an origination central office (OCO) and a destination central office (DCO). The method includes forming a spoke connection between the OCO and a hub node and forming a connection between the hub node and the DCO. The spoke connection is formed to carry first residual demand traffic from the OCO to the hub node. The connection is formed to carry the first residual demand traffic and second residual demand traffic (received at the hub node from other OCOs) from the hub node to the DCO. The method includes determining a first estimated cost (of forming the set of direct connections) and a second estimated cost (of forming the spoke connection and the connection). The method includes determining whether the first estimated cost exceeds the second estimated cost.
Abstract:
A method for relieving network node congestion includes determining an average of an aggregated load on a network node that routes network traffic, projecting a demand on the network node based on extrapolating the average of the aggregated load to a future period, determining a current level of congestion on the network node, and projecting a future level of congestion on the network node based on the projected demand and the current level of congestion. An available capacity of other network nodes in a portion of the communication network that includes the network node is determined, as well as whether the projected future level of congestion on the network node can be relieved using the determined available capacity of the other network nodes.
Abstract:
A method for relieving network node congestion includes determining an average of an aggregated load on a network node that routes network traffic, projecting a demand on the network node based on extrapolating the average of the aggregated load to a future period, determining a current level of congestion on the network node, and projecting a future level of congestion on the network node based on the projected demand and the current level of congestion. An available capacity of other network nodes in a portion of the communication network that includes the network node is determined, as well as whether the projected future level of congestion on the network node can be relieved using the determined available capacity of the other network nodes.
Abstract:
A method includes forming a set of direct connections (including a high-speed connection and a low-speed connection) between an origination central office (OCO) and a destination central office (DCO). The method includes forming a spoke connection between the OCO and a hub node and forming a connection between the hub node and the DCO. The spoke connection is formed to carry first residual demand traffic from the OCO to the hub node. The connection is formed to carry the first residual demand traffic and second residual demand traffic (received at the hub node from other OCOs) from the hub node to the DCO. The method includes determining a first estimated cost (of forming the set of direct connections) and a second estimated cost (of forming the spoke connection and the connection). The method includes determining whether the first estimated cost exceeds the second estimated cost.