摘要:
An information management system includes a work standard creation subsystem, a standard manhour database, a standard manhour setting subsystem, and a work assignment subsystem. The information management system downloads a work standard group with manhour data from the standard manhour setting subsystem and divisionally composes the work standards of the work standard group to a plurality of stations on the basis of a composition condition input by the user into the work assignment subsystem.
摘要:
An automatic manhour setting system has a standard manhour database designed to be readable, in which a number of pairs each constituted by a work standard described by a standardized standard expression and a manhour corresponding to the work standard are registered in advance. For each target work standard to which a manhour is to be given, the system matches the expression of the target work standard with the standard expressions of the work standards in the standard manhour database, sets the standard manhour of the matching work standard in the database as the manhour of the target work standard, and outputs the set manhour file.
摘要:
In a work standard creation system, a work related to each work standard is described using an operation phrase representing an operation of the work, an object phrase representing a target of the operation, and a comment phrase representing auxiliary information related to the operation and/or object and input, and the three phrase data input for each work standard are stored in a memory together with identifiers.
摘要:
In a work standard creation system, a work related to each work standard is described using an operation phrase representing an operation of the work, an object phrase representing a target of the operation, and a comment phrase representing auxiliary information related to the operation and/or object and input, and the three phrase data input for each work standard are stored in a memory together with identifiers.