-
公开(公告)号:US11920453B2
公开(公告)日:2024-03-05
申请号:US17053700
申请日:2019-05-10
Applicant: BP Exploration Operating Company Limited
Inventor: Stuart William Day , Christopher Kylie Mair
CPC classification number: E21B43/385 , E21B43/16 , E21B43/20 , G01V3/38
Abstract: A method of dynamically allocating a total amount of produced water (PW) from a reservoir during enhanced oil recovery (EOR) via a low salinity or softened water EOR flood by receiving measurement data; receiving reservoir configuration information comprising: an EOR injection rate associated with one or more EOR injection zones, a disposal zone injection rate associated with one or more disposal injection zones, and a non-reinjection disposal rate associated with one or more non-reinjection disposal routes; determining a blending rate comprising at least a portion of the PW production rate and at least a portion of the low salinity or softened water injection rate to provide a blended injection fluid; blending at least a portion of the PW with at least a portion of the low salinity or softened water at the blending rate; and dynamically allocating the PW production rate among injection and/or non-reinjection routes.