公开(公告)号:US20100004966A1
公开(公告)日:2010-01-07
申请号:US12557891
申请日:2009-09-11
申请人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
发明人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
IPC分类号: G06Q10/00
CPC分类号: G06Q10/10 , G06Q10/063 , G06Q10/06313 , G06Q10/06315 , G06Q10/0637 , G06Q10/06393 , G06Q10/06395 , G06Q10/103 , G06Q30/0201
摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.
摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。
-
公开(公告)号:US20120173437A1
公开(公告)日:2012-07-05
申请号:US13417753
申请日:2012-03-12
申请人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
发明人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
IPC分类号: G06Q10/06
CPC分类号: G06Q10/10 , G06Q10/063 , G06Q10/06313 , G06Q10/06315 , G06Q10/0637 , G06Q10/06393 , G06Q10/06395 , G06Q10/103 , G06Q30/0201
摘要: A method and system for implementing a project for a customer. A computer readable Requirements Traceability and Verification Matrix (RTVM). The RTVM is stored in a computer readable storage device. A verification is implemented, which verifies: an acceptability of business requirements of the project due to business requirements review (BRR) exit criteria having been satisfied, an acceptability of system requirements of the project due to system requirements review (SRR) exit criteria having been satisfied, an acceptability of component requirements of the project due to component requirements review (PDR) exit criteria having been satisfied. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. In response to the verification, the RVTM is updated with verification information relating to the business requirements, verification information relating to the system requirements, and verification information relating to the component requirements.
摘要翻译: 为客户实施项目的方法和系统。 计算机可读要求可追溯性和验证矩阵(RTVM)。 RTVM存储在计算机可读存储设备中。 实施验证,验证:由于业务需求审查(BRR)退出条件已被满足,可以接受项目的业务需求,系统需求审查(SRR)退出标准已经可以接受项目的系统要求 满意,由于组件要求审查(PDR)退出标准已被满足,项目组件要求的可接受性。 业务需求分解为系统要求。 系统要求分解为组件要求。 响应于验证,RVTM更新为与业务需求相关的验证信息,与系统要求相关的验证信息以及与组件要求相关的验证信息。
-
公开(公告)号:US07590552B2
公开(公告)日:2009-09-15
申请号:US10839583
申请日:2004-05-05
申请人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
发明人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
IPC分类号: G06F17/60
CPC分类号: G06Q10/10 , G06Q10/063 , G06Q10/06313 , G06Q10/06315 , G06Q10/0637 , G06Q10/06393 , G06Q10/06395 , G06Q10/103 , G06Q30/0201
摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.
摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。
-
公开(公告)号:US08195492B2
公开(公告)日:2012-06-05
申请号:US12557891
申请日:2009-09-11
申请人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
发明人: Bruce G. Barker , Vincent A. Buscher , Juan P. Giraldo , Carrie L. LeBolt , Stephen L. McLellen , Sharon E. Murphy , Paul R. Popick , David P. Ricci , Janet L. Spann
IPC分类号: G06F10/00
CPC分类号: G06Q10/10 , G06Q10/063 , G06Q10/06313 , G06Q10/06315 , G06Q10/0637 , G06Q10/06393 , G06Q10/06395 , G06Q10/103 , G06Q30/0201
摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.
摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。
-
-
-