SYSTEMS ENGINEERING PROCESS
    1.
    发明申请
    SYSTEMS ENGINEERING PROCESS 失效
    系统工程流程

    公开(公告)号:US20100004966A1

    公开(公告)日:2010-01-07

    申请号:US12557891

    申请日:2009-09-11

    IPC分类号: G06Q10/00

    摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.

    摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。

    Software factory
    2.
    发明授权
    Software factory 有权
    软件厂

    公开(公告)号:US08359566B2

    公开(公告)日:2013-01-22

    申请号:US11735275

    申请日:2007-04-13

    IPC分类号: G06F9/44

    CPC分类号: G06F8/36 G06F8/10

    摘要: A method, system and computer-readable medium for creating software in a standardized manner are presented. The method includes the steps of: receiving, at a software factory, a description of software needs from a customer; creating, in the software factory, a project proposal that meets performance criteria found in the description of software needs; inducting the project proposal into the software factory, where inducting the project proposal initially evaluates the project proposal's compatibility with a capacity of the software factory; parsing the project proposal into major functional areas; retrieving work packets that are appropriate for the project proposal, where the work packets are pre-stored, reusable, self-contained, discrete units of software code; assembling the work packets into a deliverable software; testing the deliverable software; and delivering the deliverable software to the customer.

    摘要翻译: 提出了一种用于以标准化方式创建软件的方法,系统和计算机可读介质。 该方法包括以下步骤:在软件工厂接收来自客户的软件需求的描述; 在软件工厂创建符合软件需求描述中的性能标准的项目提案; 将项目建议引入软件工厂,引进项目建议书初步评估项目建议书与软件厂的能力兼容性; 将项目建议分解为主要功能领域; 检索适用于项目提案的工作包,其中工作包是预先存储的,可重复使用的,独立的,离散的软件代码单元; 将工作包组装成可交付的软件; 测试可交付的软件; 并将可交付的软件交付给客户。

    SYSTEMS ENGINEERING PROCESS
    3.
    发明申请
    SYSTEMS ENGINEERING PROCESS 审中-公开
    系统工程流程

    公开(公告)号:US20120173437A1

    公开(公告)日:2012-07-05

    申请号:US13417753

    申请日:2012-03-12

    IPC分类号: G06Q10/06

    摘要: A method and system for implementing a project for a customer. A computer readable Requirements Traceability and Verification Matrix (RTVM). The RTVM is stored in a computer readable storage device. A verification is implemented, which verifies: an acceptability of business requirements of the project due to business requirements review (BRR) exit criteria having been satisfied, an acceptability of system requirements of the project due to system requirements review (SRR) exit criteria having been satisfied, an acceptability of component requirements of the project due to component requirements review (PDR) exit criteria having been satisfied. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. In response to the verification, the RVTM is updated with verification information relating to the business requirements, verification information relating to the system requirements, and verification information relating to the component requirements.

    摘要翻译: 为客户实施项目的方法和系统。 计算机可读要求可追溯性和验证矩阵(RTVM)。 RTVM存储在计算机可读存储设备中。 实施验证,验证:由于业务需求审查(BRR)退出条件已被满足,可以接受项目的业务需求,系统需求审查(SRR)退出标准已经可以接受项目的系统要求 满意,由于组件要求审查(PDR)退出标准已被满足,项目组件要求的可接受性。 业务需求分解为系统要求。 系统要求分解为组件要求。 响应于验证,RVTM更新为与业务需求相关的验证信息,与系统要求相关的验证信息以及与组件要求相关的验证信息。

    Systems engineering process
    4.
    发明授权
    Systems engineering process 失效
    系统工程流程

    公开(公告)号:US07590552B2

    公开(公告)日:2009-09-15

    申请号:US10839583

    申请日:2004-05-05

    IPC分类号: G06F17/60

    摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.

    摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。

    Software Factory
    5.
    发明申请
    Software Factory 有权
    软件厂

    公开(公告)号:US20080256516A1

    公开(公告)日:2008-10-16

    申请号:US11735275

    申请日:2007-04-13

    IPC分类号: G06F9/44

    CPC分类号: G06F8/36 G06F8/10

    摘要: A method, system and computer-readable medium for creating software in a standardized manner are presented. The method includes the steps of: receiving, at a software factory, a description of software needs from a customer; creating, in the software factory, a project proposal that meets performance criteria found in the description of software needs; inducting the project proposal into the software factory, wherein inducting the project proposal initially evaluates the project proposal's compatibility with a capacity of the software factory; parsing the project proposal into major functional areas; retrieving work packets that are appropriate for the project proposal, wherein the work packets are pre-stored, reusable, self-contained, discrete units of software code; assembling the work packets into a deliverable software; testing the deliverable software; and delivering the deliverable software to the customer.

    摘要翻译: 提出了一种用于以标准化方式创建软件的方法,系统和计算机可读介质。 该方法包括以下步骤:在软件工厂接收来自客户的软件需求的描述; 在软件工厂创建符合软件需求描述中的性能标准的项目提案; 将项目建议引入软件工厂,其中引入项目建议书最初评估项目建议书与软件工厂的能力的兼容性; 将项目建议分解为主要功能领域; 检索适合于项目提案的工作包,其中工作包是预先存储的,可重复使用的,独立的,离散的软件代码单元; 将工作包组装成可交付的软件; 测试可交付的软件; 并将可交付的软件交付给客户。

    Systems engineering process
    6.
    发明授权
    Systems engineering process 失效
    系统工程流程

    公开(公告)号:US08195492B2

    公开(公告)日:2012-06-05

    申请号:US12557891

    申请日:2009-09-11

    IPC分类号: G06F10/00

    摘要: A method for implementing a project for a customer. Business requirements are developed for the project and are reviewed for acceptability in accordance with Business Requirements Review (BRR) exit criteria. System requirements are developed for the project and are reviewed for acceptability in accordance with system requirements review (SRR) exit criteria. Component requirements are developed for the project and are reviewed for acceptability in accordance with Preliminary Design Review (PDR) exit criteria. The business requirements are decomposed into the system requirements. The system requirements are decomposed into the component requirements. A Requirements Traceability and Verification Matrix (RTVM) is generated when the business requirements are established. The RTVM is updated throughout the life of the project. The RTVM includes verification information relating to the business requirements, the system requirements, and the component requirements. The RTVM depicts hierarchical relationships between the business requirements, the system requirements, and the component requirements.

    摘要翻译: 为客户实施项目的方法。 为项目开发业务需求,并根据业务需求审查(BRR)退出标准对可接受性进行审查。 为项目开发系统要求,并根据系统要求审查(SRR)退出标准对可接受性进行审查。 为项目开发组件要求,并根据初步设计审查(PDR)退出标准对可接受性进行审查。 业务需求分解为系统要求。 系统要求分解为组件要求。 当业务需求建立时,将生成需求跟踪和验证矩阵(RTVM)。 RTVM在整个项目的整个生命周期进行更新。 RTVM包括与业务需求,系统要求和组件要求有关的验证信息。 RTVM描述业务需求,系统要求和组件需求之间的层次关系。