Abstract:
A method for maximizing a repeatability between a base seismic survey and a monitor seismic survey of a same surveyed subsurface during a 4-dimensional (4D) project. The method includes receiving first seismic data associated with the base seismic survey; receiving second seismic data associated with the monitor seismic survey, wherein the monitor seismic survey is performed later in time than the base seismic survey; estimating subsurface reflection-points and incidence angles; determining 4D-binning based on the estimated subsurface reflection-points and incidence angles; and maximizing the repeatability between the first seismic data and the second seismic data by using the 4D-binning.