METHOD FOR CONSTRUCTING DAM INSIDE DUMP OF INNER-DUMP STRIP MINE

    公开(公告)号:US20220333486A1

    公开(公告)日:2022-10-20

    申请号:US17656423

    申请日:2022-03-25

    IPC分类号: E21F16/00 E02B7/02

    摘要: A method for constructing a dam inside a dump of an inner-dump strip mine includes: taking an upper surface connection line of a primary water-resisting layer as upper filling reference datum boundary of an artificial water-resisting layer; arranging a dam foundation pit and a trapezoidal abutment on a midline of the dam foundation pit; building and reinforcing a step-shaped retaining dam core wall on the artificial water-resisting layer; laying a foundation impervious layer, waterproof geotextile, and an earth blanket on one side, close to the primary aquifer, of the retaining dam core wall; strengthening advance of a dumping working face on one side, away from the primary aquifer, of the retaining dam core wall, and dumping overburden of a strip mine to form a support; filling a space between the earth blanket and the primary aquifer to form a blocker; and proceeding with construction and forming a continuous retaining dam.

    DENDRITIC REVERSE UNDERGROUND MINING METHOD FOR THIN COAL SEAM AT END SLOPE OF STRIP MINE

    公开(公告)号:US20220243590A1

    公开(公告)日:2022-08-04

    申请号:US17565432

    申请日:2021-12-29

    IPC分类号: E21C41/18 E21F15/00

    摘要: The present invention discloses a dendritic reverse underground mining method for a thin coal seam at an end slope of a strip mine. The method includes the following steps: step S1: using a continuous coal mining machine to excavate a main adit toward a boundary of the strip mine along a seam floor; step S2: excavating secondary adits on two sides of the main adit obliquely in a forward direction of the main adit; step S3: transporting the excavated coal out of the main adit by the self-moving belt conveyors; step S4: after the excavating of a secondary adit of the secondary adits is ended, withdrawing the continuous coal mining machine and the self-moving belt conveyor from the secondary adit, and then excavating subsequent secondary adits of the secondary adits in a similar way; step S5: filling the secondary adits, and filling a goaf of the main adit.

    METHOD FOR SLOPE GEOLOGICAL DISASTER TREATMENT AND MINERAL RESOURCE RECOVERY

    公开(公告)号:US20230030467A1

    公开(公告)日:2023-02-02

    申请号:US17873970

    申请日:2022-07-26

    IPC分类号: E21C41/26

    摘要: A method for slope geological disaster treatment and mineral resource recovery includes the following steps: S1: dividing a mountain top into a plurality of treatment sections and treatment segments; S2, selecting an easy-to-slide area at the upper portion of a first treatment segment and blasting an easy-to-slide body to make the easy-to-slide body roll down to a bottom of the slope; S3, forming a regular initial slope bench; S4, mining coal at the coal seam in a grouped mining adit manner, and laying grouting pipelines in the primary mining adits; S5, forming closed mining adits; S6, excavating secondary mining adits at intervals of the primary mining adits in sequence; S7, continuing mining in an adjacent second treatment segment in the same manner; and S8, continuing mining the first treatment segment of the second treatment section in the same manner.

    METHOD FOR CONSTRUCTING INNER DUMP TYPE STRIP MINE PIT BOTTOM RESERVOIRS SECTION BY SECTION

    公开(公告)号:US20220267974A1

    公开(公告)日:2022-08-25

    申请号:US17619102

    申请日:2020-02-29

    IPC分类号: E02B3/00 E02D17/04

    摘要: The present invention discloses a method for constructing inner dump type strip mine pit bottom reservoirs section by section, specifically including the following steps: S1: processing end slopes: discarding clay at a lowest step of an inner waste dump of a strip mine; S2: discharging concrete to slope faces of lowest steps of the end slopes on two sides of a pit bottom; S3: sealing the bottom; S4: discarding gravel into a pit of the strip mine; S5: laying geotextile; S6: re-adopting clay on the lowest steps of the end slopes of the inner waste dump, so as to form a reservoir sealing isolation layer; S7: constructing a plurality of reservoirs step by step in an advancing direction of the strip mine; S8: storing water resources: completing installation of water storage wells; S9: completing installation of water fetching wells; S10: storing water resources.