Abstract:
A computer-implemented method for validating a bill of material (BOM) structure having a plurality of nodes includes creating a directed acyclic graph of a process based on the BOM, wherein the directed acyclic graph includes the BOM structure and a process network, determining a status of at least one process in the process network, and comparing the status of the process to an associated node.