-
1.
公开(公告)号:US08344705B2
公开(公告)日:2013-01-01
申请号:US12555987
申请日:2009-09-09
申请人: Evgeni Ganev , William Warr , Mohamed (Arif) Salam
发明人: Evgeni Ganev , William Warr , Mohamed (Arif) Salam
CPC分类号: H02M1/4233 , H02J3/16 , H02M7/219 , H02M2007/53876 , H02P9/02 , H02P9/48 , H02P23/26 , H02P2101/30 , Y02B70/126 , Y02E40/32 , Y02E40/34 , Y02T50/54
摘要: A method employing a lead-unity-lag adjustment on a power generation system is disclosed. The method may include calculating a unity power factor point and adjusting system parameters to shift a power factor angle to substantially match an operating power angle creating a new unity power factor point. The method may then define operation parameters for a high reactance permanent magnet machine based on the adjusted power level.
摘要翻译: 公开了一种在发电系统上采用前置一维滞后调整的方法。 该方法可以包括计算单位功率因数点和调整系统参数以将功率因数角度移位以实质上匹配产生新的单位功率因数点的工作功率角。 然后,该方法可以基于经调整的功率电平来定义高电抗永磁体机器的操作参数。