-
公开(公告)号:US12099942B2
公开(公告)日:2024-09-24
申请号:US18485143
申请日:2023-10-11
Applicant: FREEPORT MINERALS CORPORATION
Inventor: Dana Geislinger , Travis Gaddie , Margaret Alden Tinsley , Steven Chad Richardson , Raquel Crossman , Cristian Caro , Kevin Cheng , Rosemary D. Blosser , Amelia Briggs
CPC classification number: G06Q10/04 , C22B3/06 , C22B15/0067 , C22B15/0095 , G06Q10/0631 , G06Q50/02
Abstract: The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.
-
公开(公告)号:US20240403739A1
公开(公告)日:2024-12-05
申请号:US18804547
申请日:2024-08-14
Applicant: FREEPORT MINERALS CORPORATION
Inventor: Dana Geislinger , Travis Gaddie , Margaret Alden Tinsley , Steven Chad Richardson , Raquel Crossman , Cristian Caro , Kevin Cheng , Rosemary D. Blosser , Amelia Briggs
IPC: G06Q10/04 , C22B3/06 , C22B15/00 , G06Q10/0631 , G06Q50/02
Abstract: The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.
-
公开(公告)号:US20240403738A1
公开(公告)日:2024-12-05
申请号:US18804474
申请日:2024-08-14
Applicant: FREEPORT MINERALS CORPORATION
Inventor: Dana Geislinger , Travis Gaddie , Margaret Alden Tinsley , Steven Chad Richardson , Raquel Crossman , Cristian Caro , Kevin Cheng , Rosemary D. Blosser , Amelia Briggs
IPC: G06Q10/04 , C22B3/06 , C22B15/00 , G06Q10/0631 , G06Q50/02
Abstract: The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.
-
公开(公告)号:US20240037462A1
公开(公告)日:2024-02-01
申请号:US18485143
申请日:2023-10-11
Applicant: FREEPORT MINERALS CORPORATION
Inventor: Dana Geislinger , Travis Gaddie , Margaret Alden Tinsley , Steven Chad Richardson , Raquel Crossman , Cristian Caro , Kevin Cheng , Rosemary D. Blosser , Amelia Briggs
IPC: G06Q10/04 , G06Q50/02 , C22B15/00 , C22B3/06 , G06Q10/0631
CPC classification number: G06Q10/04 , G06Q50/02 , C22B15/0095 , C22B3/06 , C22B15/0067 , G06Q10/0631
Abstract: The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.
-
公开(公告)号:US20240403737A1
公开(公告)日:2024-12-05
申请号:US18804441
申请日:2024-08-14
Applicant: FREEPORT MINERALS CORPORATION
Inventor: Dana Geislinger , Travis Gaddie , Margaret Alden Tinsley , Steven Chad Richardson , Raquel Crossman , Cristian Caro , Kevin Cheng , Rosemary D. Blosser , Amelia Briggs
IPC: G06Q10/04 , C22B3/06 , C22B15/00 , G06Q10/0631 , G06Q50/02
Abstract: The system may include a secondary irrigation feature that determines a percent of overlap of each of a plurality of submodules in a first lift over each of a plurality of submodules in a second lift and adjusts at least one of leaching operations or a leaching model based on the total tonnage weighted average of metal in the second lift. The method may further comprise determining an acid gap based on a difference between total acid given and total acid consumption; and further adjusting at least one of the leaching operations or the leaching model based on the acid gap. The method may further comprise determining a percentage of compacted material based on the material that is compacted and irrigated divided by the material that is irrigated; and further adjusting at least one of the leaching operations or the leaching model based on the percentage of compacted material.
-
-
-
-