Abstract:
Aspects of the present disclosure involve a system comprising a computer-readable storage medium storing at least one program, and a method for generating optimal power plant decommissioning plans based on stakeholder constraints. In example embodiments, the method may include receiving one or more constraints for determining a power plant decommissioning plan. The method further includes accessing decommissioning strategy data representing a plurality of possible decommissioning plans, and generating a decommissioning plan in accordance with the constraints based on the decommissioning strategy data. The method may further include causing presentation of a user interface on a client device that includes a graphical representation of the power plant decommissioning plan.