DYNAMICALLY CONTROLLING INDUSTRIAL SYSTEM OUTAGE ASSIGNMENTS TO ACHIEVE DOSE STATES
    1.
    发明申请
    DYNAMICALLY CONTROLLING INDUSTRIAL SYSTEM OUTAGE ASSIGNMENTS TO ACHIEVE DOSE STATES 审中-公开
    动态控制工业系统落地分配,实现配料状态

    公开(公告)号:US20160364666A1

    公开(公告)日:2016-12-15

    申请号:US14839449

    申请日:2015-08-28

    CPC classification number: G06Q10/06312 G06Q50/06

    Abstract: A method of dynamically adjusting an industrial system outage plan is disclosed. Data items pertaining to changes to past plans associated with past outages of a plurality of industrial systems are received along with optional inputs from physics based model(s) of the system, such as a fuel model. The data items include measurements of impacts of changes to the past plans. Work rules pertaining to a work force are received. The work force is responsible for implementing an additional plan corresponding to an additional outage of an additional industrial system. The work rules include fatigue thresholds for workers in the work force. Based on a determination that a probability that one or more fatigue thresholds will be exceeded, a recommendation for a change to the additional plan is generated. The recommendation is based on the measurements of the impacts of the changes to the past plans.

    Abstract translation: 公开了一种动态调整工业系统中断计划的方法。 与与多个工业系统的过去中断相关的过去计划的变化的数据项目连同来自基于物理的系统的模型(例如燃料模型)的可选输入一起被接收。 数据项包括对过去计划的变化的影响的测量。 收到与工作人员有关的工作规则。 工作人员负责实施一项附加计划,以应对额外的额外工业系统中断。 工作规则包括劳动力工人的疲劳阈值。 基于确定将超过一个或多个疲劳阈值的概率的确定,生成对附加计划的改变的建议。 该建议是基于对过去计划的变化的影响的测量。

    SYSTEM TO CONTROL ASSET DECOMMISSIONING AND RECONCILE CONSTRAINTS
    2.
    发明申请
    SYSTEM TO CONTROL ASSET DECOMMISSIONING AND RECONCILE CONSTRAINTS 审中-公开
    控制资产减值和重组约束的制度

    公开(公告)号:US20160365162A1

    公开(公告)日:2016-12-15

    申请号:US14738404

    申请日:2015-06-12

    CPC classification number: G21D1/003 G06Q10/0637 Y02E30/40 Y04S10/60

    Abstract: Aspects of the present disclosure involve a system comprising a computer-readable storage medium storing at least one program, and a method for generating optimal power plant decommissioning plans based on stakeholder constraints. In example embodiments, the method may include receiving one or more constraints for determining a power plant decommissioning plan. The method further includes accessing decommissioning strategy data representing a plurality of possible decommissioning plans, and generating a decommissioning plan in accordance with the constraints based on the decommissioning strategy data. The method may further include causing presentation of a user interface on a client device that includes a graphical representation of the power plant decommissioning plan.

    Abstract translation: 本公开的方面涉及包括存储至少一个程序的计算机可读存储介质的系统,以及用于基于利益相关者约束产生最佳电厂退役计划的方法。 在示例性实施例中,该方法可以包括接收用于确定电厂退役计划的一个或多个约束。 该方法还包括访问代表多个可能退役计划的退役战略数据,以及根据基于退役策略数据的约束生成退役计划。 该方法还可以包括在包括电厂退役计划的图形表示的客户端设备上引入用户界面的呈现。