公开(公告)号:US10704427B2
公开(公告)日:2020-07-07
申请号:US15450899
申请日:2017-03-06
Applicant: General Electric Company
Inventor: Prabhanjana Kalya , Pramod Kumar Yadav , Sidharth Abrol , Giriprasad Chebiyyam
Abstract: A monitoring system of a combined cycle power plant having a topping cycle performed by a gas turbine and a bottoming cycle performed by a steam turbine, the monitoring system. The monitoring system includes a processor that receives a first set of data indicating a first measurement value of an operating parameter of the combined cycle power plant. The processor determines a baseline efficiency of the process based on the first measurement value using a bottoming cycle performance (BCP) model. The processor determines a threshold based on the baseline efficiency. The processor receives a second set of data indicating a second measurement value of the operating parameter. The processor compare the threshold to an operational efficiency based on the second measurement value using the BCP model, and provides an indication of a decrease in efficiency of the process if the operational efficiency is below the threshold.
-
公开(公告)号:US20180245519A1
公开(公告)日:2018-08-30
申请号:US15442984
申请日:2017-02-27
Applicant: General Electric Company
Inventor: Rajeev Kumar Verma , Vikram Srinivasa Muralidharan , Pramod Kumar Yadav , Bryan Edward Sweet , David August Snider
CPC classification number: F02C9/00 , F01K13/02 , F02C6/04 , F02C6/18 , F02C7/26 , F02C9/28 , F05D2220/32 , F05D2260/81 , F05D2260/82 , F05D2260/85 , F05D2270/20 , G05B13/024 , G05B13/0265 , Y02E20/16
Abstract: A non-transitory computer readable storage medium storing one or more processor-executable instructions wherein the one or more instructions when executed by a processor of a controller, cause acts to be performed is provided. The acts to be performed include obtaining one or more signals representative of ambient conditions and one or more operating conditions of the gas turbine engine, executing a model to predict a duration of a startup time for the gas turbine engine based on the ambient conditions and the one or more operating conditions, and causing a display to display the predicted duration of the startup time of the gas turbine engine.
-
公开(公告)号:US20180187574A1
公开(公告)日:2018-07-05
申请号:US15450899
申请日:2017-03-06
Applicant: General Electric Company
Inventor: Prabhanjana Kalya , Pramod Kumar Yadav , Sidharth Abrol , Giriprasad Chebiyyam
CPC classification number: F01K23/101 , F01K13/02 , F02C7/00 , F05D2260/80 , H02K7/1823 , Y02E20/16
Abstract: A monitoring system of a combined cycle power plant having a topping cycle performed by a gas turbine and a bottoming cycle performed by a steam turbine, the monitoring system. The monitoring system includes a processor that receives a first set of data indicating a first measurement value of an operating parameter of the combined cycle power plant. The processor determines a baseline efficiency of the process based on the first measurement value using a bottoming cycle performance (BCP) model. The processor determines a threshold based on the baseline efficiency. The processor receives a second set of data indicating a second measurement value of the operating parameter. The processor compare the threshold to an operational efficiency based on the second measurement value using the BCP model, and provides an indication of a decrease in efficiency of the process if the operational efficiency is below the threshold.
-
-