-
公开(公告)号:US20150013847A1
公开(公告)日:2015-01-15
申请号:US14379777
申请日:2012-03-26
申请人: Hongxu Hei , Bo Wang , Shishu Xie , Xiandong Liu , Guohua Yang , Yongjie Yang , Aihua Ma , Xiaolin Li , Liang Zou , Huawei Zhang
发明人: Hongxu Hei , Bo Wang , Shishu Xie , Xiandong Liu , Guohua Yang , Yongjie Yang , Aihua Ma , Xiaolin Li , Liang Zou , Huawei Zhang
CPC分类号: C21D8/1261 , C21D1/28 , C21D1/34 , C21D1/76 , C21D6/008 , C21D8/1222 , C21D8/1233 , C21D9/46 , H01F41/00
摘要: A method for producing a silicon steel normalizing substrate comprises: steelmaking, hot rolling and normalizing steps. The normalizing step uses a normalizing furnace having a nonoxidizing heating furnace section. The nonoxidizing heating furnace section comprises more than 3 furnace zones. An energy investment ratio of the furnace zones used in the nonoxidizing heating furnace section is adjusted, so as to control an excess coefficient α of the nonoxidizing heating furnace section to be within a range of 0.8≦α
摘要翻译: 硅钢标准化衬底的制造方法包括:炼钢,热轧和归一化步骤。 归一化步骤使用具有非氧化加热炉部分的归一化炉。 非氧化加热炉部分包括3个以上的炉区。 调节在非氧化加热炉部中使用的炉区的能量投入率,以将非氧化加热炉部的过剩系数α控制在0.8&lt; 1lE;α<1.0的范围内。
-
公开(公告)号:US09822423B2
公开(公告)日:2017-11-21
申请号:US14379777
申请日:2012-03-26
申请人: Hongxu Hei , Bo Wang , Shishu Xie , Xiandong Liu , Guohua Yang , Yongjie Yang , Aihua Ma , Xiaolin Li , Liang Zou , Huawei Zhang
发明人: Hongxu Hei , Bo Wang , Shishu Xie , Xiandong Liu , Guohua Yang , Yongjie Yang , Aihua Ma , Xiaolin Li , Liang Zou , Huawei Zhang
CPC分类号: C21D8/1261 , C21D1/28 , C21D1/34 , C21D1/76 , C21D6/008 , C21D8/1222 , C21D8/1233 , C21D9/46 , H01F41/00
摘要: A method for producing a silicon steel normalizing substrate comprises: steelmaking, hot rolling and normalizing steps. The normalizing step uses a normalizing furnace having a nonoxidizing heating furnace section. The nonoxidizing heating furnace section comprises more than 3 furnace zones. An energy investment ratio of the furnace zones used in the nonoxidizing heating furnace section is adjusted, so as to control an excess coefficient α of the nonoxidizing heating furnace section to be within a range of 0.8≦α
-
公开(公告)号:US09496078B2
公开(公告)日:2016-11-15
申请号:US14372689
申请日:2012-03-29
申请人: Huawei Zhang , Yaping Wu , Yu Gong , Yezhong Sun , Hongxu Hei
发明人: Huawei Zhang , Yaping Wu , Yu Gong , Yezhong Sun , Hongxu Hei
IPC分类号: C21D6/00 , H01F1/147 , C21D8/12 , C21D1/26 , C22C38/02 , H01F41/00 , C21D8/02 , C21D8/04 , C21D9/00 , C21D9/70
CPC分类号: H01F1/14766 , C21D1/26 , C21D6/00 , C21D6/008 , C21D8/021 , C21D8/041 , C21D8/1205 , C21D8/1216 , C21D8/1244 , C21D9/0081 , C21D9/70 , C21D2201/05 , C22C38/02 , H01F41/00
摘要: A hot rolled silicon steel producing method comprises: silicon steel slab heating process, rough rolling process and finish rolling process. The heating process comprises a pre-heating stage, a heating stage and a soaking stage. The pre-heating stage satisfies the following formula (1). In the formula, VTp is a temperature increasing rate, in the pre-heating stage, whose unit is ° C./min; t is a total heating time of the slab in the heating furnace, and t=180-240 min; and Tc is an initial temperature when the slab is put into the furnace, whose unit is ° C. By using the foregoing formula, the heating process and the rough rolling process are changed, an occurrence rate of edge defects during the production of the hot rolled silicon steel can be reduced, and the hot rolled silicon steel with good surface quality can be produced. V Tp > 220 min t × 100 ° C . T C + 200 ° C . × 25 ° C . / min ( 1 )
-
公开(公告)号:US20150243418A1
公开(公告)日:2015-08-27
申请号:US14372689
申请日:2012-03-29
申请人: Huawei Zhang , Yaping Wu , Yu Gong , Yezhong Sun , Hongxu Hei
发明人: Huawei Zhang , Yaping Wu , Yu Gong , Yezhong Sun , Hongxu Hei
CPC分类号: H01F1/14766 , C21D1/26 , C21D6/00 , C21D6/008 , C21D8/021 , C21D8/041 , C21D8/1205 , C21D8/1216 , C21D8/1244 , C21D9/0081 , C21D9/70 , C21D2201/05 , C22C38/02 , H01F41/00
摘要: A hot rolled silicon steel producing method comprises: silicon steel slab heating process, rough rolling process and finish rolling process. The heating process comprises a pre-heating stage, a heating stage and a soaking stage. The pre-heating stage satisfies the following formula (1). In the formula, VTp is a temperature increasing rate, in the pre-heating stage, whose unit is ° C./min; t is a total heating time of the slab in the heating furnace, and t=180-240 min; and Tc is an initial temperature when the slab is put into the furnace, whose unit is ° C. By using the foregoing formula, the heating process and the rough rolling process are changed, an occurrence rate of edge defects during the production of the hot rolled silicon steel can be reduced, and the hot rolled silicon steel with good surface quality can be produced. V Tp > 220 min t × 100 ° C . T C + 200 ° C . × 25 ° C . / min ( 1 )
摘要翻译: 热轧硅钢的制造方法包括:硅钢板坯加热工序,粗轧加工和精轧工序。 加热过程包括预热阶段,加热阶段和均热阶段。 预热阶段满足下式(1)。 在公式中,VTp是预热阶段的升温速率,单位为℃/ min; t是加热炉中板坯的总加热时间,t = 180-240分钟; Tc是板坯放入炉内时的初始温度,单位为℃。通过上述公式,加热处理和粗轧过程发生变化,生产热边缘边缘缺陷的发生率 可以减少轧制硅钢,并且可以生产具有良好表面质量的热轧硅钢。 V Tp> 220ㄧt××× T C + 200°C。 ×25°C。 /分钟(1)
-
-
-