-
公开(公告)号:US10167606B2
公开(公告)日:2019-01-01
申请号:US14410639
申请日:2013-06-28
摘要: A method of stabilizing a dike using a ground anchor assembly, includes: connecting a ground anchor to a first end of a tensile member; introducing the ground anchor through the earth body and into a stable layer beneath the dike; providing a pressure distributing member on or around the tensile member at a position within the dike where stabilization against lateral earth movement is required; and connecting a second end of the tensile member to a counter member at an outer surface of the dike.
-
公开(公告)号:US09896816B2
公开(公告)日:2018-02-20
申请号:US15035781
申请日:2014-11-11
CPC分类号: E02D5/80 , E02D17/20 , E02D17/207 , E02D2300/0006 , E02D2300/0026 , E02D2300/0045 , E02D2300/0081 , E02D2600/40
摘要: A ground plug for stabilizing a dike, includes a plug front end suitable for being driven into a dike, and an elongate plug body, wherein the plug body is provided with a pressure distributing member arranged to prevent earth flow in a direction perpendicular to a length direction of the plug, and the plug front end includes a recess for receiving a drive member.
-
公开(公告)号:US09683679B2
公开(公告)日:2017-06-20
申请号:US14414763
申请日:2013-07-19
摘要: A method for pipe laying, includes the step of vertically forcing a generally rigid pipe section in a substantially vertical direction downwards from a position above ground towards a desired pipe section position in the ground, wherein the pipe section maintains a substantially horizontal position upon forcing the pipe section downwards. The vertically forcing a generally rigid pipe section in a substantially vertical direction downwards is beneficial for pipe laying because time consuming digging of a slit is not required anymore.
-
公开(公告)号:US20150192221A1
公开(公告)日:2015-07-09
申请号:US14414763
申请日:2013-07-19
摘要: A method for pipe laying, includes the step of vertically forcing a generally rigid pipe section in a substantially vertical direction downwards from a position above ground towards a desired pipe section position in the ground, wherein the pipe section maintains a substantially horizontal position upon forcing the pipe section downwards. The vertically forcing a generally rigid pipe section in a substantially vertical direction downwards is beneficial for pipe laying because time consuming digging of a slit is not required anymore.
摘要翻译: 一种用于管道敷设的方法包括将基本上刚性的管段垂直地迫使一个大致刚性的管段从地面上方的位置向下从地面上的所需管段位置向下垂直的方向,其中管段在迫使 管段向下。 垂直地将基本上刚性的管段垂直地施加在大致垂直的方向上是有利于管道铺设的,因为不再需要对狭缝进行耗时的挖掘。
-
公开(公告)号:US20150191888A1
公开(公告)日:2015-07-09
申请号:US14410639
申请日:2013-06-28
CPC分类号: E02D27/50 , E02B3/12 , E02D17/18 , E02D17/20 , E02D17/207 , E02D27/40 , E02D29/0233
摘要: A method of stabilizing a dike using a ground anchor assembly, includes: connecting a ground anchor to a first end of a tensile member; introducing the ground anchor through the earth body and into a stable layer beneath the dike; providing a pressure distributing member on or around the tensile member at a position within the dike where stabilisation against lateral earth movement is required; and connecting a second end of the tensile member to a counter member at an outer surface of the dike.
摘要翻译: 使用接地锚固组件稳定堤坝的方法包括:将地基锚固件连接到拉伸构件的第一端; 将地面锚通过地球体引入堤坝下方的稳定层; 在所述堤防内的位置处在所述拉伸构件上或周围设置压力分配构件,其中需要对侧向地球运动的稳定性; 并且在所述堤防的外表面处将所述拉伸构件的第二端连接到对置构件。
-
-
-
-