Supporting a work packet request with a specifically tailored IDE
    1.
    发明授权
    Supporting a work packet request with a specifically tailored IDE 失效
    支持专门定制的IDE的工作包请求

    公开(公告)号:US08782598B2

    公开(公告)日:2014-07-15

    申请号:US13611902

    申请日:2012-09-12

    IPC分类号: G06F9/44

    CPC分类号: G06F8/00 G06F8/20

    摘要: A computer-implemented method, system, and/or computer program product supports a user who is servicing a work packet request within a software factory. A tooling environment that is necessary to service a work packet request in a software factory is established. The software factory includes an assembly line that executes work packets to create the deliverable software, and a published set of services that describes what assembly services for assembling the work packets are offered by the assembly line. A full work packet-aware Integrated Development Environment (IDE) that is specific for a work packet identified by the work packet request is created. The full work packet-aware IDE and an associated Graphical User Interface (GUI) are transmitted to a user who has been assigned to service the work packet request, thus allowing resources depicted in the GUI to be interactively supplied to that user.

    摘要翻译: 计算机实现的方法,系统和/或计算机程序产品支持在软件工厂内服务工作包请求的用户。 建立了在软件工厂中为工作包请求提供服务所需的工具环境。 该软件工厂包括一个组装线,用于执行工作包以创建可交付的软件,以及一组已发布的服务,描述组装工作包的组装服务是由装配线提供的。 创建一个特定于工作包请求标识的工作包的完整工作包识别集成开发环境(IDE)。 完整的工作分组感知IDE和相关联的图形用户界面(GUI)被传送到已被分配用于服务工作分组请求的用户,从而允许GUI中描绘的资源被交互地提供给该用户。

    Work Packet Forecasting in a Software Factory
    2.
    发明申请
    Work Packet Forecasting in a Software Factory 失效
    软件工厂的工作包预测

    公开(公告)号:US20080256529A1

    公开(公告)日:2008-10-16

    申请号:US11735086

    申请日:2007-04-13

    IPC分类号: G06F9/445

    摘要: A method, system, and computer-readable medium for predicatively selecting which work packets will be needed by a software factory to create a deliverable custom software are presented. In a preferred embodiment, the computer-implemented method includes: presenting an initial checklist that consists of a series of question groups; receiving answers to the initial checklist; in response to determining that received answers to the initial checklist indicate that a new series of questions is required to predict which work packets will be needed to create the deliverable custom software, dynamically generating a new checklist; evaluating leading indicators for the received answers; based on relevancy of answers and the leading indicators, eliminating irrelevant questions from the new checklist; and based on answers to remaining relevant questions, determining if a particular work packet will be needed to create the deliverable custom software in the software factory.

    摘要翻译: 提出了一种方法,系统和计算机可读介质,用于预先选择软件工厂需要哪些工作包来创建可交付的定制软件。 在优选实施例中,计算机实现的方法包括:呈现由一系列问题组组成的初始检查表; 接收初始清单的答复; 响应于确定接收到的初始检查表的答案指示需要新的一系列问题来预测将需要哪些工作包来创建可交付的定制软件,动态生成新的清单; 评估收到的答案的主要指标; 基于答案的相关性和领先指标,从新的清单中消除无关的问题; 并基于对剩余相关问题的答案,确定是否需要特定的工作包来在软件工厂中创建可交付的定制软件。

    Life Cycle of a Work Packet in a Software Factory
    3.
    发明申请
    Life Cycle of a Work Packet in a Software Factory 失效
    软件工厂中工作包的生命周期

    公开(公告)号:US20080256507A1

    公开(公告)日:2008-10-16

    申请号:US11735168

    申请日:2007-04-13

    IPC分类号: G06F9/44

    CPC分类号: G06F8/20

    摘要: A method, system, and computer-readable medium for managing a work packet's life cycle, wherein the work packet is assembled in a software factory that creates custom software in a standardized manner, are presented. In a preferred embodiment, the computer-implemented method comprises the steps of: defining a work packet to perform a sub-function of a custom software, wherein the work packet is a pre-stored, reusable, self-contained, discrete unit of software code; assembling the work packet; archiving the work packet in an asset repository; retrieving the work packet from the asset repository; and sending the work packet to an assembly line for consolidation with other work packets to create a custom software.

    摘要翻译: 一种用于管理工作包的生命周期的方法,系统和计算机可读介质,其中工作包被组装在以标准化方式创建定制软件的软件工厂中。 在优选实施例中,计算机实现的方法包括以下步骤:定义工作分组以执行定制软件的子功能,其中工作分组是预先存储的,可重复使用的,独立的,离散的软件单元 码; 组装工作包; 将工作包归档到资产库中; 从资产库中检索工作包; 并将工作包发送到装配线,以与其他工作包合并以创建定制软件。

    Rapid On-Boarding of a Software Factory
    4.
    发明申请
    Rapid On-Boarding of a Software Factory 失效
    快速登陆软件厂

    公开(公告)号:US20080256505A1

    公开(公告)日:2008-10-16

    申请号:US11735120

    申请日:2007-04-13

    IPC分类号: G06F9/44

    CPC分类号: G06F8/36 G06F8/10

    摘要: A method, system, and computer-readable medium for rapid on-boarding of a software factory are presented. In a preferred embodiment, the computer-implemented method comprises the steps of: identifying choke-points in a first software project; creating a checklist of identifying factors that caused the choke-points that were identified in the first software project; receiving a new software project at a software factory, wherein the new software project is in a same software category as the first software project; presenting the checklist for the first software project; receiving new answers to the checklist; determining if the software factory is ready to handle the new software project based on the new answers to the checklist; and in response to determining that the software factory is ready to handle the new software project, configuring the software factory in a same configuration as that previously used by the first software project.

    摘要翻译: 介绍了软件工厂快速登机的方法,系统和计算机可读介质。 在优选实施例中,计算机实现的方法包括以下步骤:识别第一软件项目中的阻塞点; 创建一个识别导致第一个软件项目中确定的阻塞点的因素的清单; 在软件工厂接收新的软件项目,其中新软件项目与第一个软件项目处于相同的软件类别; 提供第一个软件项目的清单; 收到清单的新答复; 确定软件工厂是否准备好根据清单的新答案处理新的软件项目; 并且响应于确定软件工厂准备好处理新的软件项目,配置与先前由第一个软件项目使用的相同配置的软件工厂。

    Software Factory Readiness Review
    5.
    发明申请
    Software Factory Readiness Review 有权
    软件工厂准备审查

    公开(公告)号:US20080255693A1

    公开(公告)日:2008-10-16

    申请号:US11735152

    申请日:2007-04-13

    IPC分类号: G06F19/00

    CPC分类号: G06Q10/00

    摘要: A computer-implemented method, system, and computer-readable medium for determining if a software factory is ready to take on a software project is presented. In a preferred embodiment, the computer-implemented method includes the steps of: determining if an infrastructure for a software factory has been procured; determining if operational software needed to assemble work packets in an assembly line in the software factory has been installed; determining if a workflow event model for an assembly line in the software factory has been configured; determining if workload in the assembly line has been balanced; determining if communication channels between the software factory and a customer's computer system have been defined and cleared for data transmission; and in response to determining that any element described above has been determined not to have occurred, prohibiting an induction of a software project into the software factory.

    摘要翻译: 提出了一种计算机实现的方法,系统和计算机可读介质,用于确定软件工厂是否准备好接管软件项目。 在优选实施例中,计算机实现的方法包括以下步骤:确定软件工厂的基础设施是否已被采购; 确定是否安装了在软件工厂装配线上组装工作包所需的操作软件; 确定软件工厂中装配线的工作流事件模型是否已配置; 确定装配线中的工作量是否平衡; 确定软件工厂和客户的计算机系统之间的通信通道是否被定义和清除以进行数据传输; 并且响应于确定上述任何元素已被确定为不发生,禁止将软件项目引入软件工厂。

    Assembling Work Packets Within a Software Factory
    6.
    发明申请
    Assembling Work Packets Within a Software Factory 失效
    在软件工厂内组装工作包

    公开(公告)号:US20080256506A1

    公开(公告)日:2008-10-16

    申请号:US11735056

    申请日:2007-04-13

    IPC分类号: G06F9/44

    CPC分类号: G06F8/36 G06F8/10

    摘要: A method, system, and computer-readable medium for assembling work packets within a software factory are presented. In a preferred embodiment, the computer-implemented method comprises the steps of: collecting a plurality of software artifacts that have been archived during an assembly of previous work packets; collecting a plurality of metrics that have been utilized during the assembly of previous work packets; defining a template for a new work packet, wherein the template for the new work packet is created by a packet definition process that defines attributes that are needed in the new work packet; selecting requisite software artifacts from the plurality of software artifacts; selecting requisite metrics from the plurality of metrics; and sending the template, requisite software artifacts and requisite metrics to a packet assembly process, wherein the packet assembly process assembles the requisite software artifacts to create the new work packet.

    摘要翻译: 提出了一种用于在软件工厂内组装工作包的方法,系统和计算机可读介质。 在优选实施例中,计算机实现的方法包括以下步骤:收集在先前工作分组的组合期间已被归档的多个软件工件; 收集在组装先前工作分组期间已被使用的多个度量; 定义新工作包的模板,其中用于新工作包的模板由定义新工作包中需要的属性的分组定义过程创建; 从所述多个软件工件中选择必需的软件工件; 从所述多个度量中选择必要度量; 以及将模板,所需的软件工件和必要的度量发送到分组组装过程,其中分组组装过程组装所需的软件工件以创建新的工作分组。

    Project Induction in a Software Factory
    7.
    发明申请
    Project Induction in a Software Factory 审中-公开
    软件工程引进工程

    公开(公告)号:US20080256390A1

    公开(公告)日:2008-10-16

    申请号:US11735070

    申请日:2007-04-13

    IPC分类号: G06F11/00

    CPC分类号: G06F8/20

    摘要: A computer-implemented method, system, and computer-readable medium for inducting a software project into a software factory is presented, wherein an induction process identifies what processes and sub-processes are needed to create the software factory, and wherein the induction process identifies potential risks to the software factory. In a preferred embodiment, the computer-implemented method comprises the steps of: submitting a factory project proposal to a service definition process; creating a service definition template from a compilation of selected checklists; scoring and classifying the service definition template to determine if the candidate project may be executed in the software factory; in response to the service definition template scoring above a pre-determined acceptable score, transmitting the factory project proposal to a service induction process; and in response to the candidate project passing a final review process, transmitting the candidate project to the software factory for execution.

    摘要翻译: 提出了一种用于将软件项目引入软件工厂的计算机实现的方法,系统和计算机可读介质,其中感应过程识别创建软件工厂所需的过程和子过程,并且其中感应过程识别 软件厂潜在的风险。 在优选实施例中,计算机实现的方法包括以下步骤:向工作定义过程提交工厂项目提案; 从所选清单的汇编中创建服务定义模板; 评估和分类服务定义模板,以确定候选项目是否可以在软件工厂执行; 响应于服务定义模板评分高于预先确定的可接受分数,将工厂项目提案传送到服务感应过程; 并通过候选项目通过最终审查流程,将候选项目传送到软件工厂执行。

    Software Factory Health Monitoring
    8.
    发明申请
    Software Factory Health Monitoring 有权
    软件厂健康监测

    公开(公告)号:US20080255696A1

    公开(公告)日:2008-10-16

    申请号:US11735099

    申请日:2007-04-13

    IPC分类号: G06F19/00

    摘要: A method, system, and computer-readable medium for maintaining a health of a software factory that creates custom software in a standardized manner is presented. In a preferred embodiment, the method includes the steps of: defining work packets to perform sub-functions of a custom software; tracking a transmission of the work packets to an assembly line in a software factory; monitoring any retrieval of software artifacts that are used to create the work packets; monitoring any on-going changes of work activities that are contained in the work packets; determining if execution of the work packets conforms to governance guidelines for the software factory; monitoring the software factory to ensure that the work packets comply with an architecture of the software factory; tracking quality metrics for an execution of the work packets in an assembly line in the software factory; and transmitting all tracked and monitored information described above to a dashboard.

    摘要翻译: 提出了一种用于维持以标准化方式创建定制软件的软件工厂健康的方法,系统和计算机可读介质。 在优选实施例中,该方法包括以下步骤:定义工作包以执行定制软件的子功能; 跟踪工作包的传输到软件工厂的装配线; 监视用于创建工作包的软件工件的任何检索; 监测工作包中包含的工作活动的任何正在进行的变化; 确定工作包的执行是否符合软件工厂的治理准则; 监控软件厂,确保工作包符合软件厂的架构; 跟踪在软件工厂的装配线中执行工作包的质量指标; 并将上述所有跟踪和监视的信息发送到仪表板。