-
公开(公告)号:US20230350365A1
公开(公告)日:2023-11-02
申请号:US17733786
申请日:2022-04-29
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Michael J. Wenzel , Anas W. I. Alanqar , Matthew J. Asmus , Ryan A. Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Steven R. Vitullo
IPC: G05B19/042 , H02J3/00
CPC classification number: G05B19/042 , H02J3/00 , G05B2219/2639
Abstract: A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time step. The dynamic variable affects an actual maximum production of the equipment. The method includes determining control decisions for the plurality of time steps by executing the control algorithm and controlling the equipment in accordance with the control decisions.
-
公开(公告)号:US20230033206A1
公开(公告)日:2023-02-02
申请号:US17963699
申请日:2022-10-11
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Young M. Lee , Sugumar Murugesan , ZhongYi Jin , Jaume Amores , Kelsey Carle Schuster , Steven R. Vitullo , Henan Wang
Abstract: A fault prediction system for building equipment includes one or more memory devices configured to store instructions that, when executed on one or more processors, cause the one or more processors to receive device data for a plurality of devices of the building equipment, the device data indicating performance of the plurality of devices; generate, based on the received device data, a plurality of prediction models comprising at least one of single device prediction models generated for each of the plurality of devices or cluster prediction models generated for device clusters of the plurality of devices; label each of the plurality of prediction models as an accurately predicting model or an inaccurately predicting model based on a performance of each of the plurality of prediction models; and predict a device fault with each of the plurality of prediction models labeled as an accurately predicting model.
-
公开(公告)号:US11474485B2
公开(公告)日:2022-10-18
申请号:US16198456
申请日:2018-11-21
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Young M. Lee , Sugumar Murugesan , ZhongYi Jin , Jaume Amores , Kelsey Carle Schuster , Steven R. Vitullo , Henan Wang
Abstract: A chiller fault prediction system for a building, including one or more memory devices and one or more processors. The one or more memory devices are configured to store instructions to be executed on the one or more processors. The one or more processors are configured to receive chiller data for a plurality of chillers, the chiller data indicating performance of the plurality of chillers. The one or more processors are configured to generate, based on the received chiller data, a plurality of single chiller prediction models and a plurality of cluster chiller prediction models, the plurality of single chiller prediction models generated for each the plurality of chillers and the plurality of cluster chiller prediction models generated for chiller clusters of the plurality of chillers. The one or more processors are configured to label each of the plurality of single chiller prediction models and the plurality of cluster chiller prediction models as an accurately predicting chiller model or an inaccurately predicting chiller model based on a performance of each of the plurality of single chiller prediction models and a performance of each of the plurality of cluster chiller prediction models. The one or more processors are configured to predict a chiller fault with each of the plurality of single chiller prediction models labeled as the accurately predicting chiller models. The one or more processors are configured to predict a chiller fault for each of a plurality of assigned chillers assigned to one of a plurality of clusters labeled as the accurately predicting chiller model.
-
公开(公告)号:US11747776B2
公开(公告)日:2023-09-05
申请号:US17963699
申请日:2022-10-11
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Young M. Lee , Sugumar Murugesan , ZhongYi Jin , Jaume Amores , Kelsey Carle Schuster , Steven R. Vitullo , Henan Wang
CPC classification number: G05B13/048 , F24F11/38 , F24F11/63 , F24F11/64 , G05B13/0265 , G05B13/04 , G06N20/00 , G05B13/027 , G05B13/028 , G06N5/04
Abstract: A fault prediction system for building equipment includes one or more memory devices configured to store instructions that, when executed on one or more processors, cause the one or more processors to receive device data for a plurality of devices of the building equipment, the device data indicating performance of the plurality of devices; generate, based on the received device data, a plurality of prediction models comprising at least one of single device prediction models generated for each of the plurality of devices or cluster prediction models generated for device clusters of the plurality of devices; label each of the plurality of prediction models as an accurately predicting model or an inaccurately predicting model based on a performance of each of the plurality of prediction models; and predict a device fault with each of the plurality of prediction models labeled as an accurately predicting model.
-
公开(公告)号:US11243523B2
公开(公告)日:2022-02-08
申请号:US16725940
申请日:2019-12-23
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Jaume Amores Llopis , Young M. Lee , Sugumar Murugesan , Steven R. Vitullo
IPC: G05B23/02
Abstract: A building system for detecting faults in an operation of building equipment. The building system comprising one or more memory devices configured to store instructions thereon that cause one or more processors to perform a cumulative sum (CUSUM) analysis on actual building data and corresponding predicted building data to obtain cumulative sum values for a plurality of times within a first time period; determine a first time at which a first cumulative sum value is at a first maximum; identify a second cumulative sum value at a second maximum at a second time occurring after the first time; compare the identified second cumulative sum value to a threshold; and based on determining that the identified second cumulative sum value does not exceed the threshold, determine that a first fault ended at the first time.
-
公开(公告)号:US11719451B2
公开(公告)日:2023-08-08
申请号:US16725952
申请日:2019-12-23
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Jaume Amores Llopis , Young M. Lee , Sugumar Murugesan , Steven R. Vitullo
IPC: F24F11/38 , F24F11/49 , G06F17/18 , H04L67/12 , F24F120/20
CPC classification number: F24F11/38 , F24F11/49 , G06F17/18 , H04L67/12 , F24F2120/20
Abstract: A building system for detecting faults in an operation of building equipment. The building system comprising one or more memory devices configured to store instructions thereon that cause the one or more processors to perform a cumulative sum (CUSUM) analysis on actual building data and corresponding predicted building data to obtain cumulative sum values for a first plurality of times within a first time period; analyze cumulative sum values associated with a second plurality of times occurring before the first time to identify a second time of the second plurality of times at which a second cumulative sum value is at a local minimum; and determine that a first fault began at the second time.
-
公开(公告)号:US11519620B2
公开(公告)日:2022-12-06
申请号:US17028704
申请日:2020-09-22
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Steven R. Vitullo , Kelsey Carle Schuster , Michael Richard Rhodes , Jonathan Cox
IPC: F24F11/30 , F24F11/62 , G05B15/02 , F24F110/10
Abstract: A method for determining a stability of a building device includes receiving time series data from building equipment regarding a first operational parameter of the building equipment, determining, for one or more time steps of the time series data, a deviation between a setpoint and a recorded value of the first operational parameter, calculating, for the one or more time steps, a trapezoidal area based on an absolute value of the deviation and a length of a time step, calculating a stability index value for the building equipment by summing the trapezoidal areas for a subset of the one or more time steps over a time horizon, and initiating an automated response based on the stability index value.
-
公开(公告)号:US12282306B2
公开(公告)日:2025-04-22
申请号:US17733786
申请日:2022-04-29
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Michael J. Wenzel , Anas W. I. Alanqar , Matthew J. Asmus , Ryan A Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Steven R. Vitullo
IPC: G05B19/042 , H02J3/00
Abstract: A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time step. The dynamic variable affects an actual maximum production of the equipment. The method includes determining control decisions for the plurality of time steps by executing the control algorithm and controlling the equipment in accordance with the control decisions.
-
公开(公告)号:US11599071B2
公开(公告)日:2023-03-07
申请号:US16355066
申请日:2019-03-15
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Steven R. Vitullo
Abstract: A building system including one or more memory devices configured to store instructions that, when executed on one or more processors, cause the one or more processors to determine an average of a minimum half of sorted energy consumption values for a first time period and determine an average of a maximum half of sorted energy consumption values for a second time period. The instructions also cause the processor to determine a ratio of the average of the minimum half of sorted energy consumption values for the first time period to the average of the maximum half of sorted energy consumption values for the second time period, compare the calculated ratio to an adaptively tunable threshold value and activate a system responsive to the calculated ratio exceeding the adaptively tunable threshold value.
-
10.
公开(公告)号:US20230047122A1
公开(公告)日:2023-02-16
申请号:US17977315
申请日:2022-10-31
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Steven R. Vitullo , Kelsey C. Schuster , Michael R. Rhodes , Jonathan Cox , Riley P. Shelton , John F. Kuchler
Abstract: A method includes obtaining an actual value of a condition affected by operating the building equipment, operating the building equipment using a setpoint for the condition, calculating a stability index based on a timeseries of errors between the actual value and the setpoint, comparing the stability index to a criterion, in response to the stability index satisfying the criterion, executing an action relating to the building equipment, and in response to the stability index not satisfying the criterion, not executing the action.
-
-
-
-
-
-
-
-
-