公开(公告)号:US20230067235A1
公开(公告)日:2023-03-02
申请号:US17982312
申请日:2022-11-07
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Ryan A. Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Matthew J. Asmus
IPC: G05B13/04
Abstract: A system for controlling building equipment determines a degradation factor for a first asset of the building equipment by comparing a design curve for the first asset and operational data for the first asset. The design curve includes a plurality of data points that define an operation of the first asset. The system generates an operational curve for the first asset by derating the design curve based on the degradation factor and operates the building equipment based on the operational curve.
-
公开(公告)号:US20230350390A1
公开(公告)日:2023-11-02
申请号:US18140112
申请日:2023-04-27
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Matthew J. Asmus , Ryan C. Beaty
IPC: G05B19/416
CPC classification number: G05B19/416 , G05B2219/37371
Abstract: Systems and methods for dynamically updating flow bounds for one or more pumps are provided. An exemplary system includes one or more pumps, one or more processors, and one or more computer-readable media storing program instructions that, when executed by the one or more processors, cause the one or more processors to perform operations. The operations include updating bounds on flow provided by the one or more pumps based on one or more values of pump head, determining control decisions for the one or more pumps based on the bounds, and controlling the one or more pumps in accordance with the control decisions.
-
公开(公告)号:US11526139B1
公开(公告)日:2022-12-13
申请号:US17371561
申请日:2021-07-09
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Ryan A. Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Matthew J. Asmus
Abstract: A system for controlling a subplant comprising one or more assets includes one or more memory devices having instructions stored thereon that, when executed by one or more processors, cause the one or more processors to perform operations including generating a design curve for a first asset included in the subplant based on an asset model, the design curve comprising a plurality of data points that define an operation of the first asset, obtaining operational data for the first asset, determining a degradation factor for the first asset by comparing the design curve and the operational data, generating an operational curve for the first asset by derating the design curve based on the degradation factor, and operating the subplant based on the operational curve.
-
公开(公告)号:US20230350365A1
公开(公告)日:2023-11-02
申请号:US17733786
申请日:2022-04-29
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Michael J. Wenzel , Anas W. I. Alanqar , Matthew J. Asmus , Ryan A. Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Steven R. Vitullo
IPC: G05B19/042 , H02J3/00
CPC classification number: G05B19/042 , H02J3/00 , G05B2219/2639
Abstract: A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time step. The dynamic variable affects an actual maximum production of the equipment. The method includes determining control decisions for the plurality of time steps by executing the control algorithm and controlling the equipment in accordance with the control decisions.
-
公开(公告)号:US11762349B2
公开(公告)日:2023-09-19
申请号:US17982312
申请日:2022-11-07
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Ryan A. Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Matthew J. Asmus
CPC classification number: G05B13/048
Abstract: A system for controlling building equipment determines a degradation factor for a first asset of the building equipment by comparing a design curve for the first asset and operational data for the first asset. The design curve includes a plurality of data points that define an operation of the first asset. The system generates an operational curve for the first asset by derating the design curve based on the degradation factor and operates the building equipment based on the operational curve.
-
公开(公告)号:US11680724B2
公开(公告)日:2023-06-20
申请号:US17219196
申请日:2021-03-31
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Graeme Willmott , Matthew J. Asmus
IPC: G05B15/02 , G05B13/04 , F24F110/10 , F24F11/65
CPC classification number: F24F11/65 , G05B13/041 , G05B15/02 , F24F2110/10 , G05B2219/2642
Abstract: Disclosed herein are related to a system, a method, and a non-transitory computer readable storing instructions for operating an energy plant comprised of heating, ventilation and air conditioning (HVAC) devices. In one aspect, the system generates gradient data indicating a gradient of operating performance of the energy plant with respect to values of a plurality of control variables of HVAC devices. The system determines, from the plurality of control variables, a reduced group of control variables of the HVAC devices based on the gradient data. The system determines a set of values of the reduced group of control variables. The system operates the energy plant according to the determined set of values of the reduced group of control variables.
-
公开(公告)号:US12282306B2
公开(公告)日:2025-04-22
申请号:US17733786
申请日:2022-04-29
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Michael J. Wenzel , Anas W. I. Alanqar , Matthew J. Asmus , Ryan A Baumgartner , Ryan C. Beaty , Shawn A. Schlagenhaft , Homero L. Noboa , Steven R. Vitullo
IPC: G05B19/042 , H02J3/00
Abstract: A method includes providing a control algorithm that may include a constraint constraining production of the equipment below maximum values for a plurality of time steps, and dynamically adjusting the constraint by updating the maximum values as a function of predicted values of a dynamic variable for the plurality of time step. The dynamic variable affects an actual maximum production of the equipment. The method includes determining control decisions for the plurality of time steps by executing the control algorithm and controlling the equipment in accordance with the control decisions.
-
公开(公告)号:US11699903B2
公开(公告)日:2023-07-11
申请号:US17330741
申请日:2021-05-26
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Mohammad N. Elbsat , Michael J. Wenzel , Nicole A. Madison , Tricia J. Valentine , Collin W. Eggert , Matthew J. Asmus , James P. Kummer , Carol T. Tumey , Peter A. Craig
IPC: G05D3/12 , G05D5/00 , G05D9/00 , G05D11/00 , G05D17/00 , H02J3/00 , G05B19/042 , G06Q30/0207 , G06Q50/06 , G05B15/02 , H02J3/32 , H02J3/38 , H02J3/40
CPC classification number: H02J3/003 , G05B15/02 , G05B19/042 , G06Q30/0236 , G06Q50/06 , G05B2219/2639 , H02J3/32 , H02J3/38 , H02J3/381 , H02J3/40 , H02J2203/20 , H02J2300/24
Abstract: An energy optimization system for a building includes a processing circuit configured to generate a user interface including an indication of one or more economic load demand response (energy) operation parameters, one or more first participation hours, and a first load reduction amount for each of the one or more first participation hours. The processing circuit is configured to receive one or more overrides of the one or more first participation hours from the user interface, generate one or more second participation hours, a second load reduction amount for each of the one or more second participation hours, and one or more second equipment loads for the one or more pieces of building equipment based on the received one or more overrides, and operate the one or more pieces of building equipment to affect an environmental condition of the building based on the one or more second equipment loads.
-
公开(公告)号:US11281168B2
公开(公告)日:2022-03-22
申请号:US17071633
申请日:2020-10-15
Applicant: Johnson Controls Tyco IP Holdings LLP
Inventor: Mohammad N. Elbsat , Michael J. Wenzel , Graeme Willmott , Matthew J. Asmus
IPC: G05B13/04 , G05F1/66 , G05B19/04 , F24F11/46 , G05B19/042 , F24F110/10 , F24F140/50
Abstract: Disclosed herein are related to a system, a method, and a non-transitory computer readable medium for operating an energy plant. In one aspect, the system generates a regression model of a produced thermal energy load produced by a supply device of the plurality of devices. The system predicts the produced thermal energy load produced by the supply device for a first time period based on the regression model. The system determines a heat capacity of gas or liquid in the loop based on the predicted produced thermal energy load. The system generates a model of mass storage based on the heat capacity. The system predicts an induced thermal energy load during a second time period at a consuming device of the plurality of devices based on the model of the mass storage. The system operates the energy plant according to the predicted induced thermal energy load.
-
-
-
-
-
-
-
-