-
1.
公开(公告)号:US20150274488A1
公开(公告)日:2015-10-01
申请号:US14734735
申请日:2015-06-09
Applicant: KONE CORPORATION
Inventor: Narendran RAMAKRISHNAN , Muralikrishnan BANGARU
CPC classification number: B66B19/007 , B66B1/18 , B66B1/2458 , B66B1/3461 , B66B1/468 , B66B2201/103 , B66B2201/211 , B66B2201/215 , B66B2201/216 , Y10T29/49826
Abstract: A method and a system for modernizing an elevator installation including two or more elevators includes an unmodernized elevator, one or more call-giving devices, a new group controller, which is connected to the elevator installation for allocating an elevator call to be given with a call-giving device to be served by an elevator belonging to the elevator installation, and also a measuring device, which is configured to measure an operating parameter of an unmodernized elevator. The aforementioned measuring device is connected to the new group controller for communicating the aforementioned operating parameter to the new group controller.
Abstract translation: 一种用于使包括两个或更多个电梯的电梯设备现代化的方法和系统包括未实现的电梯,一个或多个呼叫设备,新的组控制器,其连接到电梯设备,用于分配给定电梯呼叫的电梯呼叫 呼叫装置由属于电梯设备的电梯服务,以及测量装置,其被配置为测量未形成的电梯的操作参数。 上述测量装置连接到新的组控制器,用于将上述操作参数传送到新的组控制器。