-
公开(公告)号:US08573892B2
公开(公告)日:2013-11-05
申请号:US13163925
申请日:2011-06-20
IPC分类号: E02D3/08
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中被向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从腔的底部向上移动,并且聚集体沉积在腔的底部中,随后心轴被降低,使得其钝的下端与沉积的聚集体接合并且通过垂直振动作用和静态力使聚集体致密化, 重复这些步骤,直到码头顶部靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。 第二实施例包括在主心轴中的用于将混凝土或浆料注入到先前沉积在空腔中的聚集体中的导管。
-
公开(公告)号:US07963724B2
公开(公告)日:2011-06-21
申请号:US11882454
申请日:2007-08-01
IPC分类号: E02D3/08
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中被向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从腔的底部向上移动,并且聚集体沉积在腔的底部中,随后心轴被降低,使得其钝的下端与沉积的聚集体接合并且通过垂直振动作用和静态力使聚集体致密化, 重复这些步骤,直到码头顶部靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。 第二实施例包括在主心轴中的用于将混凝土或浆料注入到先前沉积在空腔中的聚集体中的导管。
-
公开(公告)号:US08221034B2
公开(公告)日:2012-07-17
申请号:US13279833
申请日:2011-10-24
IPC分类号: E02D3/08
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven down in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity then the mandrel is lowered so that its blunt lower end densifies the aggregate by vertical vibratory action and static force and repeating these until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从空腔的底部向上移动,并且聚集体沉积在空腔的底部中,然后心轴被降低,使得其钝的下端通过垂直的振动作用和静态力致密化聚集体,并重复这些直到墩顶 靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。
-
公开(公告)号:US08043028B2
公开(公告)日:2011-10-25
申请号:US11979558
申请日:2007-11-05
IPC分类号: E02D3/08
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中被向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从腔的底部向上移动,并且聚集体沉积在腔的底部中,随后心轴被降低,使得其钝的下端与沉积的聚集体接合并且通过垂直振动作用和静态力使聚集体致密化, 重复这些步骤,直到码头顶部靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。 第二实施例包括在主心轴中的用于将混凝土或浆料注入到先前沉积在空腔中的聚集体中的导管。
-
公开(公告)号:US20080159813A1
公开(公告)日:2008-07-03
申请号:US11979558
申请日:2007-11-05
IPC分类号: E02D7/00
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中被向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从腔的底部向上移动,并且聚集体沉积在腔的底部中,随后心轴被降低,使得其钝的下端与沉积的聚集体接合并且通过垂直振动作用和静态力使聚集体致密化, 重复这些步骤,直到码头顶部靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。 第二实施例包括在主心轴中的用于将混凝土或浆料注入到先前沉积在空腔中的聚集体中的导管。
-
公开(公告)号:US07326004B2
公开(公告)日:2008-02-05
申请号:US11101599
申请日:2005-04-08
IPC分类号: E02D3/08
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中被向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从腔的底部向上移动,并且聚集体沉积在腔的底部中,随后心轴被降低,使得其钝的下端与沉积的聚集体接合并且通过垂直振动和静态力使聚集体致密化, 重复这些步骤,直到码头顶部靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。 第二实施例包括在主心轴中的用于将混凝土或浆料注入到先前沉积在空腔中的聚集体中的导管。
-
公开(公告)号:US20120093590A1
公开(公告)日:2012-04-19
申请号:US13279833
申请日:2011-10-24
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven down in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity then the mandrel is lowered so that its blunt lower end densifies the aggregate by vertical vibratory action and static force and repeating these until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从空腔的底部向上移动,并且聚集体沉积在空腔的底部中,然后心轴被降低,使得其钝的下端通过垂直的振动作用和静态力致密化聚集体,并重复这些直到墩顶 靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。
-
公开(公告)号:US20110305525A1
公开(公告)日:2011-12-15
申请号:US13163925
申请日:2011-06-20
IPC分类号: E02D7/06
摘要: A primary earth penetrating mandrel formed of a hollow shell steel plate octagonal in cross-section has an upper end and a blunt lower end joined by an upwardly and outwardly tapered wall. The mandrel is driven downwardly in the earth to simultaneously form a vertical tapered cavity while compacting the sidewall of the cavity to provide structural integrity. The mandrel is then moved upwardly from the bottom of the cavity and aggregate is deposited in the bottom of the cavity following which the mandrel is lowered so that its blunt lower end engages the deposited aggregate and densifies the aggregate by vertical vibratory action and static force with these steps being repeated until the pier top is near the surface of the earth at which time the upper aggregate portions are densified by either the primary mandrel or a secondary mandrel having a substantially larger lower end surface than the lower end surface of the primary mandrel. A second embodiment includes a conduit in the primary mandrel for injecting concrete or grout into aggregate previously deposited in the cavity.
摘要翻译: 横截面为八角形的中空壳钢板形成的主地球穿心轴具有通过向上和向外的锥形壁连接的上端和钝的下端。 心轴在地球中被向下驱动以同时形成垂直锥形腔,同时压实空腔的侧壁以提供结构完整性。 然后心轴从腔的底部向上移动,并且聚集体沉积在腔的底部中,随后心轴被降低,使得其钝的下端与沉积的聚集体接合并且通过垂直振动作用和静态力使聚集体致密化, 重复这些步骤,直到码头顶部靠近地球表面,此时上部骨料部分被主心轴或具有比主心轴的下端表面大得多的下端表面的次级心轴致密化。 第二实施例包括在主心轴中的用于将混凝土或浆料注入到先前沉积在空腔中的聚集体中的导管。
-
-
-
-
-
-
-