-
公开(公告)号:US10409923B2
公开(公告)日:2019-09-10
申请号:US15114350
申请日:2014-02-26
Applicant: LANDMARK GRAPHICS CORPORATION
Inventor: Olivier R. Germain , Mark Lochmann
Abstract: A method of modeling an oilfield network can include identifying a well and a tying point, identifying locations of the well and tying point, identifying elevations of the well and tying point, creating a model pipeline along a path between the well and the tying point, such as a straight line path between the well and the tying point, defining a length of the path, calculating an elevation difference between the well and the tying point, determining whether an obstacle exists in the path, and defining a length of the pipeline. A method can include creating a second path that circumvents the obstacle and adjusting a length of a pipeline accordingly. A method can include implementing one or more nudging algorithms and incrementally adjusting the length of a pipeline. A method can include defining one or more limits for adjusting a length of a pipeline model.
-
公开(公告)号:US10233750B2
公开(公告)日:2019-03-19
申请号:US14765822
申请日:2013-02-27
Applicant: LANDMARK GRAPHICS CORPORATION
Inventor: Robello Samuel , Olivier R. Germain
IPC: E21B49/00 , E21B7/04 , G05B13/04 , E21B47/022
Abstract: Calculating wellbore energy. At least some of the illustrative embodiments are methods including: calculating an expected wellbore energy for a planned wellpath, the calculating by a computer system; calculating an expected tortuosity of the planned wellpath; calculating a first value indicative of probability of occurrence of a drilling event for drilling along the planned wellpath, the first value based on the expected wellbore energy and the expected tortuosity; and then drilling a wellbore along at least a first portion of the planned wellpath if the first value indicates the probability of the drilling event is less than a predetermined threshold.
-
公开(公告)号:US20150369042A1
公开(公告)日:2015-12-24
申请号:US14765822
申请日:2013-02-27
Applicant: LANDMARK GRAPHICS CORPORATION
Inventor: Robello Samuel , Olivier R. Germain
CPC classification number: E21B49/003 , E21B7/04 , E21B47/022 , G05B13/048
Abstract: Calculating wellbore energy. At least some of the illustrative embodiments are methods including: calculating an expected wellbore energy for a planned wellpath, the calculating by a computer system; calculating an expected tortuosity of the planned wellpath; calculating a first value indicative of probability of occurrence of a drilling event for drilling along the planned wellpath, the first value based on the expected wellbore energy and the expected tortuosity; and then drilling a wellbore along at least a first portion of the planned wellpath if the first value indicates the probability of the drilling event is less than a predetermined threshold.
Abstract translation: 计算井筒能量。 至少一些说明性实施例是方法,包括:计算计划井道的预期井筒能量,由计算机系统计算; 计算计划井道的预期曲折度; 计算指示沿着所述计划的井道钻探的钻井事件的发生概率的第一值,所述第一值基于所述预期的井眼能量和预期的曲折度; 然后如果所述第一值指示所述钻井事件的概率小于预定阈值,则沿所述计划井道的至少第一部分钻井井。
-
-