MAINTENANCE SYSTEM AND METHOD FOR A MACHINE USED IN DRILLING OPERATIONS

    公开(公告)号:US20170116582A1

    公开(公告)日:2017-04-27

    申请号:US15299470

    申请日:2016-10-21

    Applicant: MHWIRTH AS

    Inventor: BJARNE LARSEN

    CPC classification number: G06Q10/20

    Abstract: A method for scheduling a maintenance event for a machine used in drilling which includes providing a first well plan for a first well to be drilled over a first time period (tA) and a second well plan for a second well to be drilled over a second time period (tB), controlling a first computer program module for determining a projected first duty profile for the machine in the first time period and a projected second duty profile for the machine in the second time period, controlling a second computer program module for scheduling a maintenance event (tM1) for the machine based on the projected first duty profile and the projected second duty profile, and creating a new maintenance event (tM2) at a time prior to the second time period if the maintenance event (tM1) falls within the second time period.

    METHOD AND SYSTEM FOR OPERATING A DRILLING PLANT

    公开(公告)号:US20200080412A1

    公开(公告)日:2020-03-12

    申请号:US16609744

    申请日:2018-04-26

    Applicant: MHWIRTH AS

    Abstract: A method for analyzing a drilling operation includes obtaining a first set of logged operational data from the drilling operation through a first time interval, obtaining a set of operational activity dividers that delimit second time intervals within the first time interval, allocating one of a plurality of pre-defined activities to each of the second time intervals, wherein a first activity is one of the plurality of pre-defined activities, calculating a first performance indicator parameter for the second time intervals which have been allocated to the first activity, generating a time-dependent profile of the first performance indicator parameter for the second time intervals, and outputting at least one calculated value of the first performance indicator parameter to an operator. The first performance indicator parameter is calculated as a function of a duration of a respective second time interval which has been allocated to the first activity.

Patent Agency Ranking