IMPACT DETERMINATION SYSTEM, IMPACT DETERMINATION METHOD, AND RECORDING MEDIUM

    公开(公告)号:US20250139979A1

    公开(公告)日:2025-05-01

    申请号:US18835404

    申请日:2022-02-28

    Abstract: An impact determination system according to the present invention includes: a memory configured to store instructions; and one or more processors configured to execute the instructions to: acquire a predicted surface layer state of a structure after an event, the predicted surface layer state being sensor information related to a surface of the structure on a ground surface and having been predicted based on pre-event sensor information measured before the event related to a ground of the structure; acquire post-event sensor information measured after the event; determine a post-event surface layer state of the structure based on the post-event sensor information; and determine an impact of the event on the structure based on the predicted surface layer state and the post-event surface layer state.

    INFRASTRUCTURE MANAGEMENT SYSTEM, INFRASTRUCTURE MANAGEMENT METHOD, AND RECORDING MEDIUM

    公开(公告)号:US20240029003A1

    公开(公告)日:2024-01-25

    申请号:US18266365

    申请日:2020-12-17

    CPC classification number: G06Q10/06393

    Abstract: An infrastructure management system includes an information acquisition unit, a ranking unit, and a display control unit. The information acquisition unit acquires management information indicating an infrastructure management state of each of a plurality of companies. The ranking unit calculates a score pertaining to the management state of each of the plurality of companies, on the basis of the management information for each of the plurality of companies, and ranks the plurality of companies according to the calculated scores. The display control unit displays the rankings of the plurality of companies on a display means.

Patent Agency Ranking