-
公开(公告)号:US09339899B2
公开(公告)日:2016-05-17
申请号:US13882836
申请日:2011-11-10
CPC分类号: B21J15/02 , B21J15/025 , B21J15/10 , B21J15/28 , B21J15/36 , B23P19/02 , Y10T29/49943 , Y10T29/49947 , Y10T29/49956 , Y10T29/5148 , Y10T29/53 , Y10T29/5343 , Y10T29/53539 , Y10T29/5377 , Y10T29/53774
摘要: A fastening method comprising using a control apparatus to select a first upsetting volume of an upsetting die, using a punch to push a first fastener into a workpiece and using the upsetting die to upset the first fastener, then using the control apparatus to select a second upsetting volume of the upsetting die, using the punch to push a second fastener into a workpiece and using the upsetting die to upset the second fastener, or using the punch and the upsetting die to form a clinch joint.
摘要翻译: 一种紧固方法,包括使用控制装置来选择镦锻模具的第一镦锻体积,使用冲头将第一紧固件推入工件中,并使用镦锻模具来镦锻第一紧固件,然后使用控制装置选择第二紧固件 镦锻模具的镦粗体积,使用冲头将第二紧固件推入工件,并使用镦锻模具来镦锻第二紧固件,或者使用冲头和镦锻模以形成夹紧接头。
-
公开(公告)号:US20130205574A1
公开(公告)日:2013-08-15
申请号:US13880246
申请日:2011-11-10
申请人: Roger Stanton Doo , Wojciech Gostylla , Neal Sean Williams , Christopher James Clarke , Russell John Trinick , Stuart Edmund Blacket
发明人: Roger Stanton Doo , Wojciech Gostylla , Neal Sean Williams , Christopher James Clarke , Russell John Trinick , Stuart Edmund Blacket
CPC分类号: B21J15/02 , B21J15/025 , B21J15/10 , B21J15/28 , B21J15/36 , B23P19/02 , Y10T29/49943 , Y10T29/49947 , Y10T29/49956 , Y10T29/5148 , Y10T29/53 , Y10T29/5343 , Y10T29/53539 , Y10T29/5377 , Y10T29/53774
摘要: A method of riveting comprising using a punch (1) to push a rivet (9) through a workpiece (5) such that a shank (10) of the rivet (9) is received in a die (3) defined by a die body (3) which is in contact with the workpiece, a slug of material (16) being removed from the workpiece (5) by the rivet (9) and being received in the die, the method further comprising closing or substantially closing the die using a rod (4) and using the rod to upset the shank of the rivet.
摘要翻译: 一种铆接方法,包括使用冲头(1)将铆钉(9)推过工件(5),使得铆钉(9)的柄(10)被容纳在由模具本体 (3),其与工件接触,材料块(16)通过铆钉(9)从工件(5)移除并被接收在模具中,该方法还包括使用 杆(4),并使用杆来破坏铆钉的柄部。
-
公开(公告)号:US09387557B2
公开(公告)日:2016-07-12
申请号:US13880246
申请日:2011-11-10
申请人: Roger Stanton Doo , Wojciech Gostylla , Neal Sean Williams , Christopher James Clarke , Russell John Trinick , Stuart Edmund Blacket
发明人: Roger Stanton Doo , Wojciech Gostylla , Neal Sean Williams , Christopher James Clarke , Russell John Trinick , Stuart Edmund Blacket
CPC分类号: B21J15/02 , B21J15/025 , B21J15/10 , B21J15/28 , B21J15/36 , B23P19/02 , Y10T29/49943 , Y10T29/49947 , Y10T29/49956 , Y10T29/5148 , Y10T29/53 , Y10T29/5343 , Y10T29/53539 , Y10T29/5377 , Y10T29/53774
摘要: A method of riveting comprising using a punch to push a rivet through a workpiece such that a shank of the rivet is received in a die defined by a die body which is in contact with the workpiece, a slug of material being removed from the workpiece by the rivet and being received in the die, the method further comprising closing or substantially closing the die using a rod and using the rod to upset the shank of the rivet.
摘要翻译: 一种铆接方法,包括使用冲头将铆钉推动通过工件,使得铆钉的柄被容纳在由与工件接触的模具本体所限定的模具中,一块材料从工件被从工件上移除, 所述铆钉被接收在所述模具中,所述方法还包括使用杆闭合或基本上封闭所述模具,并且使用所述杆来压缩所述铆钉的所述柄部。
-
公开(公告)号:US20110252626A1
公开(公告)日:2011-10-20
申请号:US13122647
申请日:2009-10-08
申请人: Neal Sean Williams
发明人: Neal Sean Williams
CPC分类号: B21J15/32 , B23P19/001 , Y10T29/49771 , Y10T29/49947 , Y10T29/53 , Y10T29/53313 , Y10T29/53478
摘要: Fasteners, such as rivets, are fed to a fastener insertion tool (1) via a buffer magazine (5) adjacent to the tool. The buffer is movable with the tool and C-frame between an operative position where fasteners can be inserted int a workpiece and a re-filling position where it is docked at a docking station (13) to reload. Fasteners are delivered to the docking station from a source (14) and held there ready for when the tool docks. Once docked a transfer gat is opened at an interface between the buffer magazine (15) and the docking station (13) and fasteners from the docking station are transferred into the buffer magazine. A fastener insertion cycle is executed whilst the docking station is refilled with fasteners. A control cycle is used to control the quantity of fasteners loaded into a storage track at the docking station and operates to reduce overfilling of the buffer.
摘要翻译: 诸如铆钉的紧固件通过邻近工具的缓冲箱(5)被馈送到紧固件插入工具(1)。 该缓冲器可与工具和C形框架一起移动,其中工作位置可将紧固件插入到工件中,并且重新填充位置,在该位置,其停靠在对接站(13)以重新加载。 紧固件从源(14)输送到坞站,并在工具停靠时保持准备。 一旦对接,在缓冲箱(15)和对接站(13)之间的接口处打开传送盖,并且来自对接站的紧固件被转移到缓冲箱中。 在对接站用紧固件重新填充的同时执行紧固件插入循环。 使用控制循环来控制在对接站处加载到存储轨道中的紧固件的数量并且操作以减少缓冲器的过度填充。
-
公开(公告)号:US20090266866A1
公开(公告)日:2009-10-29
申请号:US12066921
申请日:2006-08-01
IPC分类号: B27F7/00
CPC分类号: B23P19/001 , B21J15/32
摘要: Fasteners, such as rivets (60), are fed to a fastener insertion tool (1) via a buffer magazine (5) adjacent to the tool. The buffer is movable with the tool and C-frame (6) between an operative position where fasteners can be inserted into a workpiece and a re-filling position where it is docked at a docking station (13) to reload. Fasteners are delivered to the docking station from a source (14) and held there ready for when the tool docks. Once docked a transfer gate (25, 28) is opened at an interface between the buffer magazine and the docking station and fasteners from the docking station are transferred into the buffer magazine. The quantity of fasteners in the buffer magazine is detected and the last fastener is retained so as to support preceding fasteners loaded into the buffer magazine. Any subsequently loaded fasteners back to the docking station either under gravity, under the influence of a pressurised gas or both. The gate is then closed and the insertion apparatus separates from the docking station.
摘要翻译: 诸如铆钉(60)的紧固件通过邻近工具的缓冲箱(5)被馈送到紧固件插入工具(1)。 缓冲器可以随着工具和C形框架(6)在可以将紧固件插入到工件中的操作位置和重新填充位置之间移动,在该位置处它被对接在对接站(13)以重新加载。 紧固件从源(14)输送到坞站,并在工具停靠时保持准备。 一旦对接,在缓冲箱和对接站之间的接口处打开传输门(25,28),并且来自对接站的紧固件被传送到缓冲箱中。 检测缓冲盒中的紧固件的数量,并且保持最后一个紧固件,以便支撑加载到缓冲箱中的先前的紧固件。 任何随后加载的紧固件在加压气体或二者的影响下,在重力作用下返回对接站。 然后关闭门,插入装置与对接站分离。
-
公开(公告)号:US08950049B2
公开(公告)日:2015-02-10
申请号:US13122647
申请日:2009-10-08
申请人: Neal Sean Williams
发明人: Neal Sean Williams
CPC分类号: B21J15/32 , B23P19/001 , Y10T29/49771 , Y10T29/49947 , Y10T29/53 , Y10T29/53313 , Y10T29/53478
摘要: Fasteners, such as rivets, are fed to a fastener insertion tool (1) via a buffer magazine (5) adjacent to the tool. The buffer is movable with the tool and C-frame between an operative position where fasteners can be inserted int a workpiece and a re-filling position where it is docked at a docking station (13) to reload. Fasteners are delivered to the docking station from a source (14) and held there ready for when the tool docks. Once docked a transfer gat is opened at an interface between the buffer magazine (15) and the docking station (13) and fasteners from the docking station are transferred into the buffer magazine. A fastener insertion cycle is executed while the docking station is refilled with fasteners. A control cycle is used to control the quantity of fasteners loaded into a storage track at the docking station and operates to reduce overfilling of the buffer.
摘要翻译: 诸如铆钉的紧固件通过邻近工具的缓冲箱(5)被馈送到紧固件插入工具(1)。 该缓冲器可与工具和C形框架一起移动,其中工作位置可将紧固件插入到工件中,并且重新填充位置,在该位置处,其对接在对接站(13)以重新加载。 紧固件从源(14)输送到坞站,并在工具停靠时保持准备。 一旦对接,在缓冲箱(15)和对接站(13)之间的接口处打开传送盖,并且来自对接站的紧固件被转移到缓冲箱中。 当对接站用紧固件重新填充时,执行紧固件插入循环。 使用控制循环来控制在对接站处加载到存储轨道中的紧固件的数量并且操作以减少缓冲器的过度填充。
-
公开(公告)号:US20130227832A1
公开(公告)日:2013-09-05
申请号:US13882836
申请日:2011-11-10
IPC分类号: B23P19/02
CPC分类号: B21J15/02 , B21J15/025 , B21J15/10 , B21J15/28 , B21J15/36 , B23P19/02 , Y10T29/49943 , Y10T29/49947 , Y10T29/49956 , Y10T29/5148 , Y10T29/53 , Y10T29/5343 , Y10T29/53539 , Y10T29/5377 , Y10T29/53774
摘要: A fastening method and apparatus (9) comprising using a control apparatus to select a first upsetting volume of an upsetting die, using a punch to push a first fastener into a workpiece and using the upsetting die to upset the first fastener, then using the control apparatus to select a second upsetting volume of the upsetting die, using the punch to push a second fastener into a workpiece and using the upsetting die to upset the second fastener, or using the punch and the upsetting die to form a clinch joint.
摘要翻译: 一种紧固方法和装置(9),包括使用控制装置来选择镦锻模具的第一镦锻体积,使用冲头将第一紧固件推入工件中,并使用镦锻模具来镦锻第一紧固件,然后使用控制 选择镦锻模具的第二镦锻体积的装置,使用冲头将第二紧固件推入工件中,并使用镦锻模具来镦锻第二紧固件,或者使用冲头和镦锻模具形成夹紧接头。
-
公开(公告)号:US08047416B2
公开(公告)日:2011-11-01
申请号:US12066921
申请日:2006-08-01
CPC分类号: B23P19/001 , B21J15/32
摘要: Fasteners, such as rivets (60), are fed to a fastener insertion tool (1) via a buffer magazine (5) adjacent to the tool. The buffer is movable with the tool and C-frame (6) between an operative position where fasteners can be inserted into a workpiece and a re-filling position where it is docked at a docking station (13) to reload. Fasteners are delivered to the docking station from a source (14) and held there ready for when the tool docks. Once docked a transfer gate (25, 28) is opened at an interface between the buffer magazine and the docking station and fasteners from the docking station are transferred into the buffer magazine. The quantity of fasteners in the buffer magazine is detected and the last fastener is retained so as to support preceding fasteners loaded into the buffer magazine. Any subsequently loaded fasteners back to the docking station either under gravity, under the influence of a pressurized gas or both. The gate is then closed and the insertion apparatus separates from the docking station.
摘要翻译: 诸如铆钉(60)的紧固件通过邻近工具的缓冲箱(5)被馈送到紧固件插入工具(1)。 缓冲器可以随着工具和C形框架(6)在可以将紧固件插入到工件中的操作位置和重新填充位置之间移动,在该位置处它被对接在对接站(13)以重新加载。 紧固件从源(14)输送到坞站,并在工具停靠时保持准备。 一旦对接,在缓冲箱和对接站之间的接口处打开传输门(25,28),并且来自对接站的紧固件被传送到缓冲箱中。 检测缓冲盒中的紧固件的数量,并且保持最后一个紧固件,以便支撑加载到缓冲箱中的先前的紧固件。 任何随后加载的紧固件在加压气体或二者的影响下,在重力作用下返回对接站。 然后关闭门,插入装置与对接站分离。
-
-
-
-
-
-
-