-
公开(公告)号:US07414973B2
公开(公告)日:2008-08-19
申请号:US11041586
申请日:2005-01-24
申请人: Neil Darren Hart , Paul Thomas Kondrat , David Martin Harvey , Shafiq Pirbhai , Shawn McAllister , Mark Alexander Leith Smallwood
发明人: Neil Darren Hart , Paul Thomas Kondrat , David Martin Harvey , Shafiq Pirbhai , Shawn McAllister , Mark Alexander Leith Smallwood
IPC分类号: G01R31/08
CPC分类号: H04L43/0894 , H04L43/16 , H04L47/10 , H04L47/11 , H04L47/2441 , H04L47/263 , H04L47/30 , H04L47/326 , H04L2012/5679 , H04L2012/5682 , Y02D50/10
摘要: Communication traffic management systems and methods are disclosed. A threshold status of a communication traffic queue of a second communication traffic management device which is capable of receiving communication traffic from a first communication traffic management device is determined, by comparing a depth of the queue to a corresponding threshold for instance. A rate of transfer of communication traffic to the second device, and possibly to particular queues of the second device from corresponding queues of the first device, is controlled based on the threshold status. Transmission of communication traffic from the queues of the second device may thus be in accordance with one communication traffic management scheme, whereas the content of each queue of the second device is controlled according to another communication traffic management scheme used by the first device to transfer communication traffic from its queues, to thereby provide for complex combined communication traffic management.
摘要翻译: 公开了通信业务管理系统和方法。 通过将队列的深度与相应的阈值进行比较来确定能够从第一通信流量管理装置接收通信流量的第二通信流量管理装置的通信流量管理装置的通信流量队列的阈值状态。 基于阈值状态来控制到第二设备的通信业务的传输速率以及可能到第一设备的相应队列的第二设备的特定队列的传输速率。 因此,来自第二设备的队列的通信业务的传输可以根据一种通信业务管理方案,而第二设备的每个队列的内容根据由第一设备用于传送通信的另一通信业务管理方案来控制 来自其队列的流量,从而提供复杂的组合通信流量管理。
-
公开(公告)号:US07609707B2
公开(公告)日:2009-10-27
申请号:US11216913
申请日:2005-08-31
IPC分类号: H04L12/56
CPC分类号: H04L49/45 , H04L49/201 , H04L49/208 , H04L49/253 , H04L49/30 , H04L49/40 , H04L49/503 , H04L49/506
摘要: Communication traffic management systems and methods are disclosed. One or more traffic managers may be provided for managing communication traffic to be sent toward respective groups of one or more destinations. A determination is made as to whether one traffic manager or more than one traffic manager is provided. If one traffic manager is provided, then communication traffic is transferred to the traffic manager. In the case where more than one traffic manager is provided, received communication traffic is transferred to a traffic manager for a destination toward which the communication traffic is to be sent. Traffic managers may be added to or removed from communication equipment to provide varying levels of traffic management.
摘要翻译: 公开了通信业务管理系统和方法。 可以提供一个或多个流量管理器用于管理要发送到一个或多个目的地的相应组的通信流量。 确定是否提供一个交通管理员或多个交通管理员。 如果提供了一个流量管理器,则通信流量被传送到流量管理器。 在提供多于一个流量管理器的情况下,所接收的通信流量被传送到要发送通信流量的目的地的流量管理器。 交通管理员可以添加到通信设备或从通信设备中移除,以提供不同级别的流量管理。
-
公开(公告)号:US06018518A
公开(公告)日:2000-01-25
申请号:US782632
申请日:1997-01-10
CPC分类号: H04L12/5602 , H04Q11/0478 , H04L2012/5619 , H04L2012/5635 , H04L2012/5636
摘要: In a cell switched communication system in which a source is connected to a network for transmission of cells to a network destination via a network element having a plurality of ports, said source generating resource cells containing information concerning a bandwidth allocated to the source for transmitting cells, a method of providing flow control at the network element comprises the steps of: (a) detecting a resource cell as it is received at an input port of the network element; (b) routing the resource cell to a resource cell processing means common to all the ports of the network element; (c) modifying information contained in the resource cell concerning the bandwidth allocation for the source on the basis of a determination of current utilisation of ports of the network element; and, (d) passing the modified resource cell to an output port of the network element for subsequent return to the source. Resource management (RM) cells received at an input port of a network element in an ATM communication system are routed to a centralised resource cell processing means where information in the resource cell relating to the bandwidth allocation of the source is modified to take account of the available bandwidth. The RM cell is subsequently passed back to the source to enable the source to modify its transmission rate to correspond to the modified allocated bandwidth for that source and thereby ensure that cells are not discarded by the network element due to traffic congestion.
摘要翻译: 在其中源连接到网络以经由具有多个端口的网络单元传送到网络目的地的小区交换通信系统中,所述源生成资源小区包含关于分配给用于发送小区的源的带宽的信息 在网元提供流量控制的方法包括以下步骤:(a)在网元的输入端口接收资源单元时检测资源单元; (b)将所述资源单元路由到所述网元的所有端口共用的资源单元处理单元; (c)基于网络元件的端口的当前利用的确定来修改关于源的带宽分配的资源单元中包含的信息; 和(d)将修改的资源单元传递到网络单元的输出端口,以便随后返回到源。 在ATM通信系统中的网元的输入端口处接收到的资源管理(RM)信元被路由到集中式资源单元处理装置,在资源单元中与源的带宽分配有关的信息被修改以考虑到 可用带宽。 RM信元随后被传回给源,以使源能够修改其传输速率以对应于该源的经修改的分配带宽,从而确保由于流量拥塞而不会被网元丢弃小区。
-
-