-
公开(公告)号:US20170150511A1
公开(公告)日:2017-05-25
申请号:US15426107
申请日:2017-02-07
Applicant: Nokia Solutions and Networks Oy
Inventor: Mieszko Chmiel , Hans Kroener , Robert Buranyi
IPC: H04W72/12
CPC classification number: H04W72/1205 , H04W72/12
Abstract: In a first aspect, requests for carrier aggregation scheduling for a user equipment are received (S41) from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation. The requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells. It is checked (S42) whether or not the requests exceed limits of the user equipment, and the n second scheduling decisions are modified (S43) according to predefined rules such that the requests do not exceed the limits of the user equipment. In a second aspect, limits of the user equipment are increased by a margin (S51), the increased limits are split onto active cells of the first and n second cells according to a predefined rule (S52), and the margin is controlled (S54) dependent on whether the increased and split limits are exceeded or not by the requests (S53). If they are exceeded, the n second scheduling decisions may be modified according to the first aspect (S43).
-
公开(公告)号:US09820293B2
公开(公告)日:2017-11-14
申请号:US15426107
申请日:2017-02-07
Applicant: Nokia Solutions and Networks Oy
Inventor: Mieszko Chmiel , Hans Kroener , Robert Buranyi
IPC: H04W72/12
CPC classification number: H04W72/1205 , H04W72/12
Abstract: In a first aspect, requests for carrier aggregation scheduling for a user equipment are received (S41) from a first cell used for carrier aggregation for the user equipment in a cellular communications network and n second cells of the cellular communications network, used for the carrier aggregation. The requests include a first scheduling decision of the first cell and n second scheduling decisions of the n second cells. It is checked (S42) whether or not the requests exceed limits of the user equipment, and the n second scheduling decisions are modified (S43) according to predefined rules such that the requests do not exceed the limits of the user equipment. In a second aspect, limits of the user equipment are increased by a margin (S51), the increased limits are split onto active cells of the first and n second cells according to a predefined rule (S52), and the margin is controlled (S54) dependent on whether the increased and split limits are exceeded or not by the requests (S53). If they are exceeded, the n second scheduling decisions may be modified according to the first aspect (S43).
-