-
公开(公告)号:US20240369529A1
公开(公告)日:2024-11-07
申请号:US18030285
申请日:2022-06-16
Applicant: Qingdao University of Technology
Inventor: Peng Zhang , Wentao Wang , Jiuwen Bao , Shanbin Xue
Abstract: The present disclosure relates to an ERT/ECT dual-modality combined three-dimensional sensor. A cover box is sheathed with a shielding box, a plurality of small round holes are formed in the top surface and the side surfaces of the cover box, ERT electrodes are arranged in the small round holes, and ECT electrodes are arranged at the outer sides of the ERT electrodes. The ERT electrodes are connected to an ERT data acquisition box via electrode leads, and the ECT electrodes are connected to an ECT data acquisition box via the electrode leads. An integrated cuboid design in line with the concrete structure is employed. Meanwhile, the dimensions, combination modes, placement modes and positions, supporting structures, shielding devices, electrode leads and leading-out modes of two sets of electrode arrays are subjected to comprehensive optimization design to achieve three-dimensional visual nondestructive monitoring of the moisture intrusion process in the concrete structure.
-
2.
公开(公告)号:US11946923B2
公开(公告)日:2024-04-02
申请号:US17610988
申请日:2021-02-04
Applicant: QINGDAO UNIVERSITY OF TECHNOLOGY
Inventor: Jiuwen Bao , Zihao Yu , Peng Zhang , Shuguo Li , Tiejun Zhao
CPC classification number: G01N33/383 , E02D1/08
Abstract: A device and method for monitoring freezing-thawing damage of an underwater concrete member in situ. A main structure includes an upper link, concrete member, transverse sealed box, longitudinal sealed box, movable guide rod, probe launching box, multichannel data collector, frequency modulation transmitter, computer, auxiliary wheels, lower link, and a wireless temperature sensor. A process includes four steps: launching of a probe, collection of data, calculation of an elastic modulus, and evaluation of freezing-thawing damage. The device is simply structured, easy to operate, and can be reused, and provides power for launching the probe by non-contact force transmission by using high-strength magnets of the same pole, resolving the sealing problem, and calculates the elastic modulus of the concrete member by using acceleration data obtained by a probe, so as to obtain a loss amount of the elastic modulus, thereby performing real-time in-situ monitoring for freezing-thawing damage of an underwater concrete member.
-
公开(公告)号:US11703474B2
公开(公告)日:2023-07-18
申请号:US17433095
申请日:2020-11-26
Applicant: QINGDAO UNIVERSITY OF TECHNOLOGY
Inventor: Peng Zhang , Wentao Wang , Kaiyue Zhao , Jiuwen Bao , Tiejun Zhao
CPC classification number: G01N27/223 , G01N27/226 , G01N33/383
Abstract: The present application belongs to the technical field of monitoring of durability of concrete, and particularly relates to a method for optimizing a structure of an electrical capacitance tomography sensor and analyzing an electromagnetic field. A specific process of the method includes eight steps: parameter setting, geometric setting, material setting, mesh generation, physical field setting, solution, sensor structure optimization and calculation of electromagnetic field distribution. The method proposes a new concept for solving a forward problem of an ECT system based on COMSOL software. After modeling is completed, uniformity of a sensitive field of the ECT sensor is analyzed according to calculation results, and structural parameter values of components of the ECT sensor are adjusted to seek an optimal design scheme.
-
公开(公告)号:US11680884B2
公开(公告)日:2023-06-20
申请号:US17057909
申请日:2020-02-14
Applicant: QINGDAO UNIVERSITY OF TECHNOLOGY
Inventor: Peng Zhang , Jiuwen Bao , Shuguo Li , Tiejun Zhao
CPC classification number: G01N5/02 , G01N3/08 , G01N3/16 , G01N33/383 , G01N2203/0019 , G01N2203/0037
Abstract: An apparatus and a method for testing water absorption of concrete in a direction parallel with load applying direction are provided. The apparatus includes a loading device, a water filling device, and a monitoring device. The loading device includes an upper support plate and a lower support plate connected with the upper support plate via multiple threaded rods, and a space for placing a concrete specimen formed between the upper support plate and the lower support plate. The water filling device includes a water filling cylinder having a side connected with a water supply tank via an inlet pipe, and another side connected with a water storage tank via an outlet pipe. The monitoring device includes a mass sensor arranged under the water storage tank and a strain gauge for detecting change of stress of the concrete specimen.
-
5.
公开(公告)号:US11408816B2
公开(公告)日:2022-08-09
申请号:US17058564
申请日:2020-02-14
Applicant: QINGDAO UNIVERSITY OF TECHNOLOGY
Inventor: Peng Zhang , Jiuwen Bao , Jianan Wei , Zhijie Zhuang , Tiejun Zhao
Abstract: The disclosure relates to a device and method for a dry-wet cycle simulation test of concrete in a tidal zone and a splash zone. A main structure includes a liquid storage tank, a test chamber, a communicating pipe, air holes of the liquid storage tank, air holes of the test chamber, ceiling fans, steel pipes, a support frame, an upper water level sensor, a lower water level sensor, a temperature and humidity sensor, a temperature sensor, a chamber body support, a communication valve, a pipe support, a water inlet pump, a water inlet valve, a water outlet pipe, a water outlet pump, a water outlet valve, spray water pipes, spray heads, and a control box. The control box can control and record test parameters in real time, so that the boundary between the tidal zone and the splash zone is clear.
-
公开(公告)号:US10914061B1
公开(公告)日:2021-02-09
申请号:US16940410
申请日:2020-07-28
Applicant: QINGDAO UNIVERSITY OF TECHNOLOGY
Inventor: Ben Mou , Peng Feng , Yi Liu , Zunqiang Li , Jiuwen Bao
Abstract: An assembled slab-type steel-wood composite joint, includes a steel-wood composite column, square wood beams, connecting assemblies for connecting the steel-wood composite column and the square wood beams, and wood slabs connected to and supported by the steel-wood composite column, the square wood beams and the connecting assemblies. The steel-wood composite column includes a hollow cross-shaped outer square wood column, and square blocks are integrally formed on the outer square wood column; and a steel sleeve is inlaid in the outer square wood column, an inner wood column is inlaid in the steel sleeve, column vertical steel bars penetrate through the inner wood column, horizontal steel bars penetrate through the square blocks and are fixedly connected to the steel sleeve, and threads are arranged at the ends of the horizontal steel bars.
-
-
-
-
-